New York City commercial construction projects
62,113 commercial and multifamily projects from New York City’s building permit records (11,363 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 8, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 665 of 1243
- 166-02 Baisley Boulevard QueensPLUMBING WORK ASSOCIATE WITH INTERIOR RENOVATION OF AN EXISTING SUPERMARKET. INSTALL NEW PLUMBING FIXTURES AS INDICATED ON PLANS AND ASSOCIATED SANITARY, DOMESTIC WATER PIPING.…multifamilyPlumbing· Aranda PLBG & HTG Corp$52KSep 18
- 845 Columbus Avenue ManhattanHEREWITH FILING STRUCTURAL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding· J & N Construction Group$455KSep 18
- 414 West 149 Street ManhattanModification to existing sprinkler heads. adding sprinkler heads where required. Changing from legalization to new work. Being that job was filed as legalization we had to file a…multifamilyFire protection· Expert Fire Sprinkler,LLC—Sep 18
- 1250 1 Avenue ManhattanINITIAL CD5 : FISP REPAIRS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ADDING SPECIALTY CREW LETTER FOR CD5 APPLICTION M01286342 TO PERFORM ACM WORK UNDER FISP APPLICATION…commercialBuilding· Sato Construction Co. Inc—Sep 18
- 116 West 31 Street ManhattanIRA to assist with Condition Assessment.commercial· Skyline Access LLC—Sep 18
- 205 3 Avenue ManhattanInstallation of Material Hoist.multifamily· Am Building Restoration I—Sep 18
- 247 West Broadway ManhattanRemoval of interior partitions, wall floor and ceiling finishes in existing eating and drinking establishment at first floor and storage rooms in cellar. No change in occupancy,…multifamilyBuilding· Jbuild LLC$94KSep 18
- 450 West 126 Street ManhattanApplication for the installation and use of material hoist as per plans filed herein. No change in egress, use, or occupancy.commercial· Palladium Window Solution—Sep 18
- 30 East 62 Street ManhattanGarage RepairsmultifamilyBuilding· Yates Exterior Restoratio$46.1KMay 13
- 1090 Amsterdam Avenue ManhattanFACADE INSPECTION Designated Primary Site supervisor: Jesus Decolacommercial· Structual Presv System—Sep 18
- 155 East 44 Street ManhattanMechanical modifications taking place on the 14th floor as per plans filed herewith. No change in use, egress nor occupancy.commercialHVAC / Mechanical· Phase 3 Interiors LLC$199KSep 18
- 155 East 44 Street ManhattanGeneral construction modifications taking place on the 14th floor as per plans filed herewith. No change in use, egress nor occupancy.commercialBuilding· Phase 3 Interiors LLC$398KSep 18
- 156 West 56 Street ManhattanFILED FOR MINOR INTERIOR NON-LOAD BEARING PARTITIONS WORK AND RELATED FINISH, AS PER PLANS. NO CHANGE TO USE, EGRESS, OCCUPANCY OR BULK.multifamilyBuilding· Igon Construction & Maint$108KSep 18
- 9 West 57 Street ManhattanSPRINKLER MODIFICATIONS TAKING PLACE ON 29 FLOOR CONSTRUCTION (30 FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialFire protection· Abco-Peerless Sprklr Corp$31.2KSep 18
- 601 Amsterdam Avenue ManhattanEXISTING COMMERCIAL SPACE, INTERIOR RENOVATION MODIFY PARTITION FOR PROPOSED AT FIRST FLOOR, FINISH PAINTING THROUGHOUT, PLUMBING AND MECHANICAL WORK AT DOB NOW APPLICATION; NO…multifamilyBuilding, HVAC / Mechanical, Plumbing· LG Elite Plumbing Inc$219KOct 28
- 215 Park Avenue South ManhattanModifications to the existing sprinkler system on the 14th, 18th, 19th and 20th floors as per plans. No change to use, egress or occupancy.commercialFire protection· Five Borough NYC LLC$85KSep 18
- 215 Park Avenue South ManhattanModifications to the existing plumbing system on the 14th, 18th, 19th and 20th floors as per plans. No change to use, egress or occupancy.commercialPlumbing· Dependable Mech Corp$125KSep 18
- 70 Perry Street ManhattanRespectfully filing for facade restoration as per proposed plans submitted.multifamilyBuilding· West New York Restoration$300KSep 18
- 229 West 97 Street ManhattanInterior renovation as shown on plans filed herewith.multifamilyBuilding· Cousins Painting Corp$83.8KSep 18
- 110 Riverside Drive ManhattanRENOVATION OF APT 9C INCLUDING THRU WALL AC UNITS FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE , OCCUPANCY OR EGRESS.multifamilyBuilding, Plumbing· Mceo Group Corp$90KSep 19
- 240 East 69 Street ManhattanWCM ENT: MODIFICATION TO INTERIOR PARTITIONS AND FINISHES ON PARTIAL 1ST FLOOR TO ACCOMMODATE THE ENT RENOVATION IN THE EXSITING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.multifamilyBuilding· Rolst Construction Corp$200KSep 18
- 186 Bleecker Street ManhattanPROPOSED INTERIOR RENOVATION OF UNIT M4A ON 4TH FLOOR. PARTITION WORKS AS PER PLANS. NO CHANGE IN USE OR OCCUPANCY.multifamilyBuilding, Plumbing· T & T Plumbing Inc$60KSep 18
- 12 East 49 Street ManhattanMechanical work on the 6th and 7th floors as indicated on drawings.commercialHVAC / Mechanical· Tri-Star Construction Cor$54.6KSep 18
- 12 East 49 Street ManhattanConstruction work on the 6th and 7th floors as indicated on drawings.commercialBuilding· Tri-Star Construction Cor$724KSep 18
- 385 West 12 Street ManhattanRoof ReplacementmultifamilyBuilding· Yates Exterior Restoratio$255KSep 18
- 9 West 57 Street ManhattanRemoval and construction of interior partitions, doors and ceilings as shown on drawings. No change in use, egress or occupancy.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Reidy Contracting Group$5.1MJan 6
- 150 East 49 Street ManhattanMINOR APARTMENT RENOVATION: REMOVAL OF NON-STRUCTURAL PARTITIONS, REPLACEMENT OF APPLIANCES AND FIXTURES IN EXISTING LOCATIONS, MILLWORK, LIGHTING, AND FINISH FLOORING. NEW…multifamilyHVAC / Mechanical· Essential Remodeling Inc$35KSep 18
- 345 East 93 Street ManhattanInstallation of suspended scaffold for facade work and/or inspection. Amend #1, added winsafe 1500 back plate and scaffold anchor detailmultifamily· Skyline Restoration Inc—Sep 18
- 28 Liberty Street ManhattanPlumbing modifications as per plans filed herewith. No change to use, egress or occupancy.commercialPlumbing· Real Plumbing Corp$25.7KSep 18
- 28 Liberty Street ManhattanSprinkler modifications as per plans filed herewith. No change to use, egress or occupancy.commercialFire protection· Real Plumbing Corp$42.8KSep 18
- 520 5 Avenue ManhattanREMOVAL AND INSTILLATION OF INTERIOR NON LOAD BEARING PARTITIONS AND RELATED FINISHES. FILED IN CONJUCTION WITH NEW BUILDING APPLICATION 121209192. NO CHANGES TO USE, EGRESS OR…multifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· Neptune Mechanical Inc$754KSep 23
- 45 Gramercy Park North ManhattanReplace, relocate and install new plumbing fixtures. No change in use, egress or occupancy.multifamilyPlumbing· Kapnag HTG & PLBG Corp.$67.1KSep 18
- 425 Lexington Avenue ManhattanSPRINKLER & Standpipe MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.commercialFire protection· Abco-Peerless Sprklr Corp$446KSep 19
- 425 Lexington Avenue ManhattanSPRINKLER & Standpipe MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.commercialFire protection· Abco-Peerless Sprklr Corp$132KSep 19
- 800 Third Avenue ManhattanModifications to existing mechanical system on 12th floor (north) as per plans. No change to use, egress or occupancy.commercialHVAC / Mechanical· JRM Construction MGMT LLC$25KSep 18
- 1650 Madison Avenue ManhattanInterior build-out of 2 Ambulatory health facilities (Treatment Health Care Facilities) for 1 tenant w/ new non-structural partitions, ceilings & flooring. Scope includes new…commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· SS Construction Experts L$520KOct 1
- 111 Wall Street ManhattanINSTALLATION OF TEMPORARY NEEDLE BEAMS AS PER PLANS. NEEDLE BEAMS SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.commercialHVAC / Mechanical· Arsenal Scaffold Inc$30KSep 18
- 45 Rockefeller Plaza ManhattanInterior demo & reno of non-load bearing partitions, walls. doors, ceiling & finishes as indicated on plans.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Finaly Genl Contr Corp$1MOct 15
- 425 Lexington Avenue ManhattanAdditions and modifications to the existing HVAC systems as per plans filed herewith. NO CHANGE TO USE, EGRESS OR OCCUPANCY.commercialHVAC / Mechanical· Structure Tone, LLC$637KSep 18
- 425 Lexington Avenue ManhattanRemoval and installation of non-bearing partitions and related finishes as per drawings. No change in egress or occupancy.commercialBuilding· Structure Tone, LLC$4.4MSep 18
- 140 Broadway ManhattanInterior renovation including partitions, finishes internal structural stair spanning (3) floors).commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Swinerton Builders$10.3MOct 3
- 50 Riverside Drive ManhattanRoof replacement as shown on the drawings filed herewith. No change in use, egress, or occupancy.multifamilyBuilding· Skyline Restoration Inc$900KSep 18
- 1960 Broadway ManhattanSprinkler demolition and installation on the cellar and 1st floors.multifamilyFire protection· Psi Partners, LLC$35KSep 18
- 130 East 57 Street ManhattanInterior renovation for ground floor commercial spacecommercialBuilding, Plumbing· M Interior Construction I$109KSep 23
- 30 Park Place ManhattanInstallation of plumbing fixtures along with related piping.multifamilyPlumbing· Urban Mechanical Corp$110KSep 18
- 119 Henry Street ManhattanINTERIOR RENOVATION AT APT 12 AS PER PLANS FILED HEREWITHmultifamilyBuilding· Age Contracting Corp$26KSep 18
- 410 East 92 Street ManhattanALT TYPE 2 REMOVAL OF FINISHES ON WALLS AND FLOORS AT LOBBY AT GROUND FLOOR LEVEL. MINOR REMOVAL OF NONFIRE-RATED AND NON-LOAD BEARING PARTITIONS, LIGHT FIXTURE REPLACEMENT AND…commercialBuilding, Plumbing· Forte Express P & H Inc$210KAug 13
- 57 East 97 Street ManhattanRENOVATION OF APT. 16 ON 4TH FL, PARTITION WORK PER PLANS. NEW ELECTRIC A/C SYSTEM WITH DUCTWORK IN APT. 16 AND CONDENSING UNIT ON A STEEL BRACKET ATTACHED TO PUBLIC STAIR WALL.…multifamilyBuilding, Plumbing· Dome K LLC$133KOct 16
- 101 Convent Avenue ManhattanCIVIL APPLICATION. M11-6 MANHOLE AND CONDUITS FROM NEW CON EDISON BUS VAULT IN CONVENT AVENUE ROW TO BUILDING MECHANICAL ROOM.commercialBuilding· H.M. Hughes Co. Inc$875KSep 19
- 1120 Park Avenue ManhattanInterior renovations of existing apartment #5B. Work to include non-structural demolition, general construction, and finishes. No change in use, egress, or occupancy.multifamilyBuilding, HVAC / Mechanical, Plumbing· Archetypal Imagery Corp$152KOct 17