New York City commercial construction projects
62,113 commercial and multifamily projects from New York City’s building permit records (11,363 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 8, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 647 of 1243
- 111 Livingston Street BrooklynInterior Renovation of existing 19th and 20th Floors. No change to egress, use or occupancy.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Y&L NY Interiors Inc$620KDec 29
- 140 Fifth Avenue BrooklynInterior renovation of existing retail store as per plan for the sale of coffee and pastries. Interior partitions and finishes. Plumbing and mechanical to be filed under…multifamilyBuilding, HVAC / Mechanical, Plumbing· Ergo Development & Mgmn't$248KJan 16
- 345 Lenox Road BrooklynFacade inspectmultifamily· Jepol Construction Inc—Sep 30
- 4404 6 Avenue BrooklynEast parapet wall reconstruction, masonry, sills, lintels and caulking.multifamilyBuilding· Brend Restoration SRVC$216KSep 30
- 275 Chestnut Street BrooklynRemovals, grading, and paving types within property line, including setback areas and pedestrian plazas as per plans filed. Filed in conjunction with NB# B00972461multifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· Monadnock Gen'l Cont Inc—Feb 3
- 2784 Linden Boulevard BrooklynALTERATION OF EXISTING MASONRY BUILDING. INSTALLATION OF PROPOSED LOADING DOCKS, LOADING BERTHS AND ASSOCIATED RETAINING WALLS. ADDITIONAL FRAMING AT MECHANICAL PLATFORM AND…commercialBuilding· Planet Construction & De$106KSep 30
- 124 Ryerson Street BrooklynPlumbing work in connection with OT # B00693050-I1.multifamilyPlumbing· XH&RC PLBG And HTG Inc$30.5KSep 30
- 1232 54 Street BrooklynINSTALL NEW FIRE SPRINKLER SYSTEM IN THE ENTIRE BUILDING I.A.W. NFPA 13 2007 EDIT, AS MODIFIED BY NYC BC 2014 APPENDIX Q AS PER PLAN, IN CONJUNCTION W/ NYC DOB NOW JOB #:…commercialFire protection, HVAC / Mechanical· A M B Mechanical Inc$128KNov 10
- 3870 Sedgwick Avenue BronxInstallation of 4.05 kw solar energy system on roof. No change of occupancy, use or egress.multifamilySolar· Accord Power Inc$31.4KSep 29
- 3515 Henry Hudson Parkway BronxMINOR RENOVATION WITHIN EXISTING APARTMENT 11EF. MINOR PARTITIONS WORK AND DOOR OPENING. NO CHANGE IN USE OR MEANS OF EGRESSmultifamilyBuilding, Plumbing· Handy Men Of NYC Inc$95.8KSep 30
- 525 West 238 Street BronxInstallation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.multifamilyBuilding· Canido Basonas Const. Cor—Sep 29
- 2550 Webb Avenue BronxPLUMBING RENOVATIONS IN ALL UNITS AND PUBLIC SPACES OF THE 12TH FLOOR AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE TO EXISTING USE, EGRESS, OR OCCUPANCY.commercialPlumbing· Maccarone Plumbing Inc$120KSep 29
- 315 East 143 Street BronxINSTALLATION OF SUSPENDED SCAFFOLD & MATERIAL HOIST FOR EXTERIOR FACADE REPAIRS AND FACADE INSPECTION. SUSPENDED SCAFFOLD & MATERIAL HOIST SHALL COMPLY WITH CHAPTER 33 OF THE…multifamilyBuilding· J&N Construction GRP Corp—Sep 29
- 2889 Buhre Avenue BronxPartial demolition of out-of-plumb parapet wall, to be brought down and remain low. No change to occupancy or egress under this application.commercialBuilding· Liberty Developers LLC$50KSep 29
- 2768 Webster Avenue BronxFull demolition to a two story buildingcommercialDemolition, HVAC / Mechanical· Dm80 Solutions LLC$100KSep 30
- 34a Anita Street Staten IslandFILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilySolar· Sunrun Installation SVC$28.7KSep 29
- 715 Ocean Terrace Staten IslandR880_Repair existing structural and associated deficiencies at walkways between buildings.commercialBuilding· Ziaur Bhuiyan$649KSep 29
- 99-44 67 Road QueensInstallation of suspended scaffold for facade work or inspection.multifamily· Futura Builders Group,Inc—Sep 29
- 143-50 Hoover Avenue QueensSuspended Scaffold installation for facade repairs and inspections as per plans filed herewith.multifamilyBuilding· Balaton Consulting LLC—Sep 29
- 41-11 48 Street QueensAPPLICATION TO REPAIR/REPLACE THE PARAPET WALL ABOVE THE 3RD FLOOR WINDOW LINTELS AT THE FRONT FACADE, AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.multifamilyBuilding· Maestro Builders Corporat$42KSep 29
- 145-14 Glassboro Avenue QueensElectric boilers installationcommercialHVAC / Mechanical· Olympic PLBG & HTG SVC In$500KSep 29
- 138-18 Northern Boulevard QueensINTERIOR RENOVATION FOR EXISTING RETAIL SPACE ON 1ST FLOOR AND CELLAR LEVEL AS PER PLANS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.multifamilyBuilding, Fire protection, Plumbing· Top Build Contractors Inc$611KJan 29
- 37-11 73 Street QueensPROPOSED INTERIOR RENOVATION ON CEL. & 1ST & MEZZ. FLOOR.PLUMBING WORKS AS PER PLAN.NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.multifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· Jabbie Industries Incorp$433KMay 26
- 34-41 78 Street QueensFiling for building envelope repairs as per plans filed herewith. No change in use, occupancy or egress.multifamilyBuilding· Am&G Waterproofing LLC$99.6KSep 29
- 3 East 85 Street ManhattanMATERIALS HOIST SYSTEM TO BE INSTALLED AT THE BACK OF THE BUILDING TO BRING MATERIALS UP FOR CONSTRUCTION AT THE ROOF LEVELmultifamilyRoofing· 6th Ave Constr. & Consul—Sep 29
- 50 East 102 Street ManhattanSUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE RESTORATION WORK AT 50 EAST 102 STREET, MANHATTAN, NY 10029.multifamily· Wall Contractor Corp—Sep 29
- 805 8 Avenue ManhattanPropose interior renovation of existing eating and drinking establishment on partial 1st Floor as per plan. No change in use, egress, or occupancy.multifamilyBuilding, Plumbing· Green City Box Trans Inc$107KOct 1
- 133 West 21 Street ManhattanFISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decolacommercial· Structual Presv System—Sep 29
- 475 Park Avenue South Manhattaninspect windows and framescommercial· Cole NYC LLC—Sep 29
- 950 3 Avenue ManhattanTEMPORARY NON-ILLUMINATED NON-ADVERTISING ACCESSORY BANNER ON PROTECTIVE STRUCTURE FOR OBSCURED SIGN PERMITTED UNDER JOB # M00153047 - WE ARE OPEN. NO CHANGE OF USE, EGRESS OR…commercialSigns· Capitol Design & Maint In—Sep 29
- 950 3 Avenue ManhattanTEMPORARY NON-ILLUMINATED NON-ADVERTISING ACCESSORY BANNER ON PROTECTIVE STRUCTURE FOR OBSCURED SIGN PERMITTED UNDER JOB #M00153018 - WE ARE OPEN. NO CHANGE OF USE, EGRESS OR…commercialSigns· Capitol Design & Maint In—Sep 29
- 185 Avenue B ManhattanFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Sep 29
- 35 West 33 Street ManhattanFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Sep 29
- 617 West 168 Street ManhattanFILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.commercial· Honeybee Services Inc—Sep 29
- 321 West 110 Street ManhattanFISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Sep 29
- 11 Penn Plaza ManhattanRemoval MSG sign supporting structure and minor facade repair as indicated on drawingscommercialBuilding· Tri-State Dismantling Cor$30KSep 29
- 885 Third Avenue ManhattanInstallation, removal, and modifications to plumbing fixtures and piping, as per plans. No change to use, egress, or occupancy.commercialPlumbing· Otec Plbng & HTG SVCS Inc$140KSep 29
- 1 Madison Avenue ManhattanModifications to existing Plumbing and Sprinkler Systems as per plans filed herewith. No change in use, egress, or occupancy.commercialFire protection· QPR Mechanical Inc$170KSep 29
- 240 Riverside Boulevard ManhattanInstallation of suspended scaffold for facade work or inspection.multifamily· Citiline Restoration LLC—Sep 29
- 55 East 87 Street ManhattanGeneral construction work for interior partition changes and installing of new flooring throughout as shown herewith on drawings. No changes to exterior, use, occupancy, or egress.multifamilyBuilding, Plumbing· Freedom GS Inc$165KOct 10
- 519 West 23 Street ManhattanREPLACEMENT OF GLASS RAILINGS ON 10TH AND 12TH FLOOR TERRACES TO RESPOND AND RESOLVE VATE ORDER AND VIOLATION #07252325LL011DO3. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.multifamilyBuilding· KLG Contracting Inc$110KSep 29
- 51 Astor Place ManhattanMechanical work for Intuit space on 5th & 6th floorscommercialHVAC / Mechanical· JRM Construction MGMT LLC$2.3MSep 29
- 51 Astor Place ManhattanGeneral construction for Intuit space on 5th & 6th floorscommercialBuilding· JRM Construction MGMT LLC$2.3MSep 29
- 50 West 14 Street ManhattanFILING GC FOR DEMO SCOPE TO REMOVE WALLS, DOORS, STOREFRONT, FLOOR FINISHES, AND CEILINGS AS PER THE PLANScommercialBuilding· Darby Construction SVC LL$30KSep 29
- 14 Monroe Street ManhattanTEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD FOR FACADE INSPECTION & REPAIR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Cesar QuitomultifamilyBuilding· Structual Presv System—Sep 29
- 315 Riverside Drive ManhattanRenovation of Apt. 12D, work to include removing and adding non-load bearing partitions, replacing kitchen cabinets and appliances. (total apt sf is 1727, areas of work is 525…multifamilyBuilding· Monaco Group USA Inc$65.6KSep 29
- 31 East 12 Street ManhattanREMOVAL OF EXISTING PENTHOUSE UNIT GREENHOUSE AT WEST ELEVATION AND INTERIOR DEMOLITION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding· Prat Enterprises Corp$48KSep 29
- 250 Broadway ManhattanModification to existing plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.commercialPlumbing· Bedrock PLBG. & HTG., Inc$29.4KSep 29
- 150 East 69 Street ManhattanGENERAL CONSTRUCTION, COLUMN AND WALKWAY RESTORATION AS PER PLANS HEREWITH FILED.multifamilyBuilding· Taurino Management, Inc$1.5MSep 29
- 2 Gansevoort Street ManhattanRENOVATION OF EXISTING OFFICE, INCLUDING REMOVAL AND INSTALLATION OF PARTITION; INTERIOR MILL WORK FOR FLOOR AND CEILING. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS…commercialBuilding, Fire protection, HVAC / Mechanical· JRM Construction MGMT LLC$509KOct 8