62,113 commercial and multifamily projects from New York City’s building permit records (11,363 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 8, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 614 of 1243
- 1133 6 Avenue ManhattanPlumbing work for Chiba Bank office renovation on marketing floor 15 (construction floor 14)commercialPlumbing· Par Plumbing Co., Inc$76.2KOct 20
- 885 2 Avenue ManhattanFILING FOR INSTALLATION OF HEAT EXCHANGER PLANT, BOILERS, AND PUMPS TO PROVIDE A HEAT PUMP LOOP TO THE SPACE. INSTALLATION OF NEW WATER SOURCE HEAT PUMPS AND PIPING. NO CHANGE TO…commercialBuilding, Fire protection, HVAC / Mechanical· Unity Construction Group$557KFeb 11
- 471 3 Avenue ManhattanREFILING OF BIS# 122222692 FOR INSTALLATION OF (2) DUAL-FUEL BURNERS. CHANGE GRADE OF FUEL FROM #6 TO #2 OIL AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.multifamilyHVAC / Mechanical, Plumbing· Champ Plumbing & HTG Corp$82KOct 20
- 825 Third Avenue ManhattanMechanical work for Tokio HCC on 24th marketing floor (23rd construction)commercialHVAC / Mechanical· Icon Interiors Inc$290KOct 20
- 645 5 Avenue ManhattanINTERIOR RENOVATION OF EXISTING CELLAR SPACE. NO CHANGE TO USE, OCCUPANCY OR EGRESSmultifamilyBuilding· Osd Construction Services$175KOct 20
- 31 West 52 Street ManhattanModifications to the existing sprinkler system on the 21st and 22nd floors (Centerview) as per plans. No change to use, egress or occupancy.commercialFire protection· Aggressive Fire Prot LLC$31.8KOct 20
- 400 East 52 Street ManhattanAlteration to interior partitions, remove and replace existing interior finishes. Deactivate (1) existing entry door from the corridor and seal from the inside (1) unit entry…multifamilyBuilding, HVAC / Mechanical, Plumbing· Blue City Construction$90KNov 28
- 51 Madison Avenue ManhattanModification to existing Sprinkler system and plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.commercialFire protection, Plumbing· Lab PLBG & HTG Co Inc$613KOct 20
- 90 Park Avenue ManhattanSprinkler changes on the 5th floor as indicated on drawings.commercialFire protection· Bedrock Mechanical Inc$408KOct 20
- 50 Hudson Yards ManhattanMECHANICAL MODIFICATIONS TAKING PLACE ON 42ND & 43RD FLOOR CONSTRUCTION (62ND & 63RD FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialHVAC / Mechanical· Structure Tone, LLC$5.7MOct 20
- 50 Hudson Yards ManhattanGENERAL CONSTRUCTION TAKING PLACE ON 42ND & 43RD FLOOR CONSTRUCTION (62ND & 63RD FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialBuilding· Structure Tone, LLC$16MOct 20
- 33 East 22 Street ManhattanHEREBY FILING FOR THE RENOVATION OF UNIT 4F. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding· Klein Kitchen, Inc$75KOct 20
- 701 7 Avenue ManhattanMODIFICATIONS TO EXISTING HVAC/DUCTS PIPING AS PER PLANS FILED HEREWITHcommercialHVAC / Mechanical· JFZ Construction, Inc$65KOct 20
- 412 8 Avenue ManhattanReplace split system on 1st, 2nd floor and associated condensing unit on 6th floor roof, No change in egress and occupancy.commercialHVAC / Mechanical· Dynamic Sheet Metal LTD$25KOct 20
- 801 West 190 Street ManhattanFiling for Post Approval Amendment of suspended scaffold plan.commercial· Facade Res Group LLC—Oct 20
- 701 Seventh Avenue ManhattanRemoval and instillation of interior non load bearing partitions and related finishes. No change in use, egress or occupancycommercialBuilding· JFZ Construction, Inc$145KOct 20
- 299 Park Avenue ManhattanGeneral Construction to take place on the 12th Floor as per drawings filed herewith. No change in use, egress, or occupancycommercialBuilding· James E Fitzgerald Inc$115KOct 20
- 220 5 Avenue ManhattanRELATED PLUMBING AND SPRINKLER WORK TO ACCOMODATE NEW COMMERCIAL TENANT AT EXISTING EATING AND DRINKING ESTABLISHMENT. NO CHANGE TO USE , EGRESS OR OCCUPANCY FILED UNDER THIS…commercialFire protection, HVAC / Mechanical, Plumbing· Michilli Inc$173KNov 7
- 1270 Avenue Of The Americas Manhattansprinkler & standpipe workcommercialFire protection· Bedrock Mechanical Inc$40KMar 4
- 1 Bryant Park ManhattanRemoval and renovation of non-load bearing partitions and interiors as per plans filed. No change in use, egress or occupancy.commercialBuilding· Variant Services Inc$950KOct 20
- 611 6 Avenue ManhattanSTRUCTURAL WORK FOR NEW STAIR IN EXISTING OPENING AND NEW OPENING IN EXISTING FLOOR FOR LULA AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.multifamilyBuilding· Kanaris Contracting Corp$200KOct 20
- 50 Hudson Yards ManhattanModifications to Plumbing and Sprinkler Systems as per plans filed herewith.commercialFire protection· Capitol Fire Sprinkler Co$365KDec 5
- 50 Hudson Yards ManhattanProvide supplemental steel support for the operable partition as per plans filed herewith. No change of Use, Occupancy, or Egress.commercialBuilding· Structure Tone, LLC$122KOct 20
- 310 West 72 Street ManhattanRENOVATE APT. 12GH, GENERAL CONSTRUCTION TO INCLUDE MINOR FINISH AND CABINET REMOVAL, NEW FINISHES AND CABINETRY PER PLANS FILED. NO CHANGE TO USE OCCUPANCY OR EGRESSmultifamilyBuilding, Plumbing· RD Home Construction Inc$140KOct 29
- 1661 York Avenue ManhattanNEW ADA RAMP LEADING UP TO THE COMMERCIAL SPACE #1 & #2 ENTRANCE,INCLUDING PEDESTRIAN SAFETY RAILING. NEW REINFORCED CONCRETE SIDEWALK ON GRADE, CURB, TREE PIT AND TREE GUARDS.…multifamilyBuilding· Lineal Construction & Res$25KOct 20
- 135 West 74 Street ManhattanINTERIOR RENOVATION OF TWO EXISTING APARTMENTS #3F AND #3R. MINOR PARTITION CHANGES AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. PLUMBING WORK…multifamilyBuilding· Rafalex Contracting Corp$68.8KOct 20
- 521 West 57 Street ManhattanFacade repairs as per drawings. No change to use, egress or occupancy.commercialBuilding· Citiline Restoration LLC$105KOct 20
- 154 West 70 Street ManhattanHEREWITH FILE TO RENOVATE EAT-IN & TO-GO STORE. WORK INCLUDES NEW NON-LOAD BEARING WALL, NEW PLUMBING FIXTURES, NEW FLOOR COVERING, AND GENERAL CONSTRUCTION. NO CHANGE IN USE,…multifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· Bellwood NY Inc$278KAug 7
- 220 East 60 Street ManhattanInstallation of new interior partitions, finishes, plumbing, and electrical fixtures. No change in use, occupancy, or egress in this application. Refer to the Comments section…multifamilyBuilding· 2mo LLC$198KOct 20
- 135 West 45 Street ManhattanINSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENTcommercial· Central Construction MGMT—Oct 20
- 420 Lexington Avenue ManhattanMechanical changes as indicated on plans; including the Installation of (2) 34 TON AC Units .commercialFire protection, HVAC / Mechanical, Plumbing· Versatile Services LLC$497KOct 21
- 351 West 114 Street ManhattanINTERIOR RENOVATION FOR APT. 1F. TO RESOLVE NYC DOB VIOLATIONS.multifamilyBuilding· V.C. Global Tech Corp$28.8KOct 20
- 140 Cabrini Boulevard ManhattanARCHITECTURAL SCOPE ASSOCIATED WITH INTERIOR RENOVATION AND COMBINATION OF UNITS 84 AND 85 IN COMPLIANCE WITH TPPN 03/97 AS PER PLANS SUBMITTED HEREWITH. PLUMBING SCOPE IS FILED…multifamilyBuilding, Plumbing· Magic Renovations Corp$260KOct 21
- 237 Eldridge Street ManhattanFacade repairs to include masonry, pointing, lintels, terracotta, caulking, flashing, sills, and fire escape anchors.multifamilyBuilding· Calistro Construction Co$472KJun 26
- 25 Avenue D Manhattanfacade inspectioncommercial· Jepol Construction Inc—Oct 20
- 12 East 52 Street ManhattanEXTERIOR RESTORATION TO FACADE AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY..commercialBuilding· I G H Restoration LLC$135KOct 20
- 150 East 69 Street ManhattanHEREBY FILING FOR THE INTERIOR RENOVATION OF APARTMENT 3J LOCATED ON THE 3RD FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.multifamilyBuilding, Plumbing· Brener Construction 212$365KOct 21
- 100 Broadway ManhattanGENERAL CONSTRUCTION ON FACADE & ROOF AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialBuilding· Pofi Construction Corp$171KOct 20
- 60 East End Avenue ManhattanGARAGE REPAIRS TO INCLUDE CONCRETE PATCH AND CRACK REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.multifamilyBuilding· Lake Contracting LLC$59.6KOct 20
- 12 West 18 Street ManhattanAlteration of apartment unit to add new air cooled split air conditioning system, toilet exhaust systems and fresh air system with associated ducts and piping. GC scope is…multifamilyBuilding, HVAC / Mechanical· Coho HVAC Inc$26KDec 18
- 110 East 60 Street ManhattanSPRINKLER MODIFICATIONS AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCYcommercialFire protection· Sirina Fire Prot Corp$28KOct 20
- 677 9 Avenue ManhattanRespectfully submitting application for commercial kitchen exhaust system. all proposed cooking equipment to be electrical . all work to be done as per approved plans. no change…multifamilyHVAC / Mechanical· Rddny Design Build Corp$30KOct 20
- 780 West End Avenue ManhattanFACADE INSPECTIONmultifamily· Jepol Construction Inc—Oct 20
- 186 Riverside Drive ManhattanFiling for interior demolition and general construction of apartment unit 9A. No change in use, egress or occupancy.multifamilyBuilding, HVAC / Mechanical, Plumbing· Infinity Construction Inc$173KOct 30
- 418 West 51 Street Manhattan. REMOVE ILLEGAL DOORS AND HARDWARE ON 2ND. FLOOR, 3RD. FLOOR, 4TH FLOOR. IN ORDER TO CURE VIOLATION: #35684449H, NO CHANGE IN USE, OCCUPANCY & EGRESS.multifamilyBuilding· Linco USA Inc—Oct 20
- 136 Madison Avenue ManhattanInterior demolition on the 12th floor as per plans filed herewith. No change in use, egress or occupancy.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Optimus Construction&Dev$170KOct 21
- 715 Park Avenue ManhattanINTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, GWB, MILLWORK, TILEWORK, REPLACE KITCHEN CABINETS, COSMETIC FINSHES THROUGHOUT MINOR EXT. NO CHANGE TO EGRESS, OCCUPANCY OR USE.multifamilyBuilding, Plumbing· KD One Construction Inc$479KDec 5
- 59 East 72 Street ManhattanGENERAL RENOVATION OF APARTMENT 5DmultifamilyBuilding· Black Square Builders Cor$96.8KOct 20
- 13 Harrison Street ManhattanAPPLICATION FOR INSTALLATION OF NEW COOLING AND HEATING SYSTEM FOR RESIDENTIAL ONLY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyHVAC / Mechanical· Mechanical East Co.,Inc$120KOct 20
- 370 West 51 Street ManhattanFiling to scrape, paint, repair/replace facade surfaces as per plans. No change in use, egress, or occupancy under this application.multifamilyBuilding· Arti Res & Constr Corp$200KOct 20