62,199 commercial and multifamily projects from New York City’s building permit records (11,165 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 11, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 61 of 1244
- 452 West Broadway ManhattanPlumbing work filed herewith to install new plumbing fixtures as per plan. No change of use, egress or occupancy under this filing.commercialPlumbing· Arco PLBG And HTG Inc$60KSep 29
- 115 Broadway ManhattanGENERAL CONSTRUCTION TAKING PLACE ON 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialBuilding· Exact Contracting & Const$240KSep 29
- 1633 Broadway ManhattanInstallation of new sprinkler system on the 22nd floor (Newrez) as per plans. No change to use, egress or occupancy.commercialFire protection· Abco-Peerless Sprklr Corp$93.3KSep 29
- 1633 Broadway ManhattanMinor demolition with installation of new rated walls and door for creation of ATS room in the sub-cellar 1 as per plans. No change to use, egress or occupancy.commercialBuilding· Dynamic Construction Serv$35KSep 29
- 320 East 25 Street ManhattanInstallation of suspended scaffold for facade inspection/repair.multifamilyBuilding· Streamline Consultants NY—Sep 29
- 875 Third Avenue ManhattanREPLACE EXISTING HVAC UNITS AS PER PLAN. NO CHANGE IN USE, EGRESS AND OCCUPANCY.commercialHVAC / Mechanical· Wali Construction Inc$93.3KSep 29
- 11 East 36 Street ManhattanINSTALLATION AND USE OF SUSPENDED SCAFFOLD FOR FACADE RESTORATION/INSPECTION AS PER PLANS SUBMITTEDmultifamily· Prat Enterprises Corp—Sep 29
- 10 East 23 Street ManhattanINSTALLATION AND USE OF SUSPENDED SCAFFOLD FOR FACADE RESTORATION/ INSPECTION AS PER PLANS SUBMITTEDcommercial· Prat Enterprises Corp—Sep 29
- 537 West 59 Street ManhattanVertical extension of railing and FDNY access gates at 3rd floor terrace. No change in use, egress and occupancycommercialBuilding· Broadway Builders LLC$25KSep 29
- 322 West 57 Street ManhattanINSTALLATION OF A SUSPENDED SCAFFOLD FOR FACADE INSPECTION AND REPAIR AS PER PLAN SUBMITTED. NO CHANGE TO EGRESS OF OCCUPANCY.multifamilyBuilding· Prat Enterprises Corp—Sep 29
- 3 Bryant Park ManhattanModifications to the existing HVAC System. Removal of ductwork, piping, controls and equipment back to core on the 1st Floor as per plans (LL Work - Retail Demo.) No change to…commercialHVAC / Mechanical· Theodore Williams Constr$34KSep 29
- 3 Bryant Park ManhattanMinor interior demolition. Removal & disposal of interior partitions, doors, suspended ceilings, flooring and finishes on the 1st Floor as per plans (Hines - Demo.) No change to…commercialBuilding· Theodore Williams Constr$112KSep 29
- 140 East 63 Street ManhattanFILE FOR GAS PIPING TO STEAM BOILER AND DRYERS; REPLACEMENT OF TWO (2) DRYERS WITH FOUR (4) DOUBLE DRYERS IN SUB-CELLAR.multifamilyHVAC / Mechanical, Plumbing· Hertler Nadile P & H, Inc$27.6KSep 29
- 120 Park Avenue ManhattanLobby renovation as per plans filed herewith. No change in use, egress or occupancy under this application.commercialBuilding· Turner Construction Compa$1.2MSep 29
- 144 West 27 Street ManhattanGAS PIPING REPLACEMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyPlumbing· WTC PLBG & Heating Corp$600KSep 29
- 142 East 31 Street ManhattanEmergency shoring and garage repairs on the cellar floor through roof as shown on the drawings filed herewith. No change in use, egress, or occupancy.commercialBuilding· Thomas Maintenance Inc$372KSep 29
- 308 West 82 Street ManhattanInterior renovation at Apt. 3A and Apt. 11C, work inc: Remove and install new partition and misc. finishes. No change in use, egress, or occupancy is involved under this…multifamilyBuilding· Best Match Corporation$89.6KSep 29
- 520 West 28 Street ManhattanMECHANICAL WORK FILING FOR A RETAIL SPACE AND BACK-OF-HOUSE SPACE AT 514 WEST 28TH STREET AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS OR OCCUPANCY.multifamilyBuilding, HVAC / Mechanical· Powergen Development Grou$35KOct 27
- 767 5 Avenue ManhattanHUB ACCEPTED- Exterior Installation of temporary structure for 90 days, Temp Structure to be removed after duration for LOC issuance no change in use, egress or occupancycommercialBuilding· Structure Tone, LLC$2.2MSep 29
- 435 Hudson Street ManhattanStructural modifications: Recessing two bays of slab at the 1st Floor to accommodate a stair and an ADA ramp on the 1st Floor as per plans (Hines - Storefront Phase 2.) No change…commercialBuilding· Clune Construction Co LP$150KSep 29
- 411 West 55 Street ManhattanInstallation of temporary shoring as shown on the drawings filed herewith. No change in use, egress, or occupancy.commercialBuilding· Pro-H Development Inc$30KSep 29
- 1540 Broadway ManhattanMODIFY EXISTING SIGN STRUCTURE FOR REPLACEMENT OF SIGNS AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialBuilding· North Shore Neon Sign LLC$150KSep 29
- 173 West 78 Street ManhattanGENERAL CONSTRUCTION WORK TO INCLUDE ADDITION OF A NEW WHEELCHAIR LIFT DEVICE IN EXISTING MULTIFAMILY RESIDENTIAL LOBBY ADJACENT TO EXISTING STEPS AS PER PLANS FILED HEREWITH. NO…multifamilyBuilding· On-Trac Construction Asso$90KSep 29
- 72-02 East Drive ManhattanFoundation work associated with the Bethesda Fountain and Terrace Complex renovation in Central Park.commercialBuilding· Alpine Construction & Lan$600KSep 29
- 130 William Street ManhattanRigging for Industrial Rope Accessmultifamily· Cerina General Contr. Inc—Sep 29
- 2 Penn Plaza ManhattanHereby filing construct interior partitions, ceilings and doors for lobby and offices out as shown on plans filed herewith. No change to use, occupancy or egress.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· JT Magen & Company Inc$61.1MOct 29
- 31 East 12 Street ManhattanINTERIOR RENOVATION OF THE PENTHOUSE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.multifamilyBuilding· Apc Construction LLC$42.8KSep 29
- 17 East 89 Street ManhattanINTERIOR RENOVATION IN APT 8EmultifamilyBuilding· Zeneli Construction Corp$190KSep 29
- 444 East 75 Street ManhattanCOMBINATION AND INTERIOR RENOVATION OF EXISTING APARTMENTS OCCUPYING PART OF THE 3RD FLOOR. PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.multifamilyBuilding· Ari Group, Inc$150KSep 29
- 152 West 57 Street ManhattanConvenience Stair modifications (19C/20M to 20C/21M and 21C/22M to 22C/23M) WORK TO INCLUDE PARTITION, CEILING, DOOR MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR…commercialBuilding, Plumbing· Archstone Builders LLC$380KOct 13
- 49 East 86 Street ManhattanGeneral construction associated with removal of existing sidewalk hatches and closure of sidewalk shafts, including waterproofing and sidewalk restoration. Structural work filed…multifamilyBuilding· Eci Contracting Group Inc$86.2KOct 2
- 211 Centre Street ManhattanALT 2 NON-STRUCTURAL DEMOLITION AND INTERIOR ALTERATION OF 6TH FLOOR OFFICE. NO CHANGE TO USE OR OCCUPANCY. NOTE: NEW WORK IS LIMITED TO THE INTERIOR ON THE 6TH FLOOR ONLYcommercialBuilding· Hard Safari Corp$190KSep 29
- 771 West End Avenue ManhattanProposed interior renovation modification to apartment 5D, including relocating the kitchen and 1 bedroom changes. No Change in Use, Egress, or OccupancymultifamilyBuilding, Plumbing· Gruda-Ni Construction Cor$248KOct 2
- 366 Madison Avenue ManhattanFILING FOR OBTAINING CERTIFICATE OF COMPLIANCE OF EXISTING A/C. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.commercialHVAC / Mechanical· Beyond Cooling LLC$30KSep 29
- 8 East 18 Street ManhattanMODIFICATIONS TO EXISTING MECHANICAL SYSTEMS TO INCLUDE HVAC INSTALLATION AND ASSOCIATED DUCT WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESScommercialHVAC / Mechanical, Plumbing· Build NYC Group Corp$100KOct 29
- 67 Riverside Drive ManhattanINSTALLATION OF NEW MULTIZONE AC SYSTEM WITH OUTDOOR AIR COOLED CONDENSING UNIT AND ASSOCIATED AC UNITS IN APT 6B AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND…multifamilyBuilding· Cooling Controls Corp$65KSep 29
- 17 East 12 Street ManhattanHerewith filing interior alterations to an existing dwelling unit, as per plans submitted. There is no change to use, egress or occupancymultifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· Highline Construction GR$545KOct 5
- 300 Vesey Street ManhattanGeneral construction as shown on plans filed herewith. No change to use, egress or occupancy.commercialBuilding, HVAC / Mechanical· Summit Interiors, Inc$598KSep 29
- 222 East 87 Street ManhattanINTERIOR RENOVATION OF APARTMENT 1C (1st FLOOR), PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding, Plumbing· Lotus Metropolitan Constr$136KOct 20
- 1025 5 Avenue ManhattanInterior partition changes with replacement of exiting windows and patio doors. No change to use, egress or occupancy filed under this application.multifamilyBuilding· Streamline USA LLC$80KSep 29
- 1192 Park Avenue ManhattanAPARTMENT RENOVATION (7th floor Residence APT 7C) WORK TO INCLUDE REMOVAL AND INSTALLATION OF PARTITIONS, DOORS, CEILING, MILLWORK, FINSHES AND MINOR MECHANCIAL WORK AS PER PLANS…multifamilyBuilding, Plumbing· Indigo Interiors GC LLC$1.2MOct 1
- 1 Pace Plaza ManhattanPROPOSED NEW STANDPIPE SYSTEM IN STAIR J, STAGE AREA, AND FLOOR, ALL AS PER PLAN. NO CHANGE TO EGRESS, OCCUPANCY, OR USE.commercialBuilding· Premier Fire Sprnklr Co$40KSep 29
- 220 West 26 Street ManhattanIRA TO ASSIST WITH CONDITION ASSESSMENTmultifamily· Skyline Access LLC—Sep 29
- 562 First Avenue ManhattanTISCH 14W INTERIOR RENOVATION - GENERAL CONSTRUCTION MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialBuilding, Plumbing· Empire General Contractin$779KNov 2
- 494 Broadway ManhattanConversion of 2nd, 3rd, and 4th floors of building to residential use per Article I Chapter 5. Obtain new CO.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Spring Roc LLC$810KOct 22
- 524 Broadway ManhattanMECHANICAL MODIFICATIONS TAKING PLACE ON THE 7TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialHVAC / Mechanical· John Gallin & Son, Inc$425KSep 29
- 1 Liberty Plaza ManhattanGeneral construction filed for removal and replacement of existing window glazing and sash within existing window openings on floors 44-53, as shown on plans herewith. No change…commercialBuilding· Turner Construction Compa$6MSep 29
- 2 River Terrace ManhattanHVAC Unit replacement for the lobby. No change in use, egress or occupancy.multifamilyHVAC / Mechanical· The Metro Group, Inc$250KSep 29
- 3784 10 Avenue ManhattanTo be reviewed with Development HUB. Alt II filing for renovation of existing waste yard - demo of existing concrete slab, knee wall ,fences, gates. New concrete slab, knee wall,…multifamilyBuilding· JCC Construction Corp$1.8MSep 29
- 1505 Park Avenue ManhattanSITE YARD WORK WITH 8' HIGH ENCLOSING FENCE AND GATES AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. Application to be reviewed with the Development HUB.multifamilyBuilding· JCC Construction Corp$1.8MSep 29