New York City commercial construction projects
62,113 commercial and multifamily projects from New York City’s building permit records (11,363 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 8, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 600 of 1243
- 111-15 Queens Boulevard QueensMechanical work for rennovation of existing Medex Ambulatory Health Facility / Ambulatory Diagnostic and Health Care Treatment Facility at this location. No change in use,…multifamilyHVAC / Mechanical· Rapid Response Remdiation$35KOct 27
- 36-06 30 Street QueensFACADE RESTORATION WORK AS PER INDICATED ON PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.multifamilyBuilding· Famous Restoration Inc$40KOct 27
- 58-14 136 Street QueensPlans filed to legalize the installation of metal awnings/canopies at first and second floor entry doors and to removed awning canopy over second floor garage roof .multifamilyBuilding· Mauceri Sign Systems LLC—Oct 27
- 35 West 125 Street ManhattanINSTALLATION OF TEMPORARY ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyHVAC / Mechanical· Core Scaffold Systems Inc—Oct 27
- 1385 Broadway ManhattanRemoval of existing and installation of new fixtures, piping and equipment as per plans filed.commercialPlumbing· PFL Mechanical Corp$75KOct 27
- 200 Central Park West ManhattanInstallation of temporary ground protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this…commercialHVAC / Mechanical· PJP Installers Inc$275KOct 27
- 500 East 77 Street ManhattanInstallation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.multifamilyBuilding· Pedrol Contracting Inc—Oct 27
- 113 West 24 Street Manhattaninspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Diego Buri Cumbecommercial· Streamline Consultants NY—Oct 27
- 140 5 Avenue ManhattanFILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.multifamily· Maspeth Contracting Corp—Oct 27
- 383 Madison Avenue ManhattanTEMPORARY SUSPENDED SCAFFOLD AS PER DRAWINGS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.commercial· Safway Atlantic, LLC—Oct 27
- 9 West 57 Street ManhattanGENERAL CONSTRUCTION TAKING PLACE ON 48TH FLOOR CONSTRUCTION (49TH FLOOR MARKETING) AS PER PLANS FILED HREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialBuilding· Dimar Services Corp$67KOct 27
- 218 West 40 Street ManhattanDemo work to include construction of interior partitions and installation of doors and frames as shown on drawings. No change to use, egress or occupancy.commercialBuilding· Interior Building Service$275KOct 27
- 25 West 51 Street Manhattaninspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Diego Buri Cumbecommercial· Streamline Consultants NY—Oct 27
- 224 West 104 Street ManhattanINTERIOR RENOVATIONS TO THE EXISTING RESTAURANT/UPGRADE COMMERCIAL KITCHEN HOOD EXISTING AT BASEMENT / NO CHANGE EGREES OR OCCUPANCYmultifamilyBuilding, Plumbing· Just PLBG & HTG Inc$104KOct 28
- 222 Broadway ManhattanFiling herewith for rerouting of existing Fuel Oil Piping to existing generator. Fuel Oil Tank is existingmultifamilyHVAC / Mechanical· RB HTG Consulting Group$75KOct 27
- 122 5 Avenue ManhattanNON-ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - MYO. NO CHANGE OF USE, EGRESS OR OCCUPANCY.commercialSigns· Capitol Design & Maint In—Oct 27
- 204 West 101 Street ManhattanINSTALLATION OF OUTRIGGER FOR THE FACADE REPAIR WORK AS PER PLAN SUBMITTED.commercialBuilding· Apex Group NY Corp—Oct 27
- 19 Clinton Street ManhattanCRACKED STUCCO WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. WORK SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.multifamilyBuilding· BRW Construction Inc$30KOct 27
- 470 Park Avenue South ManhattanGeneral construction as shown on the plans.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Phase 3 Interiors LLC$275KDec 3
- 39 West 128 Street ManhattanSuspended scaffold outrigger system for facade repair works.multifamilyBuilding· Qualified Construction In—Oct 27
- 200 East 69 Street ManhattanIRA to assist with Condition Assessmentmultifamily· Skyline Access LLC—Oct 27
- 147 West 22 Street ManhattanRe-filing of applications 101890777 and 110226746 for interior renovation of apartment 8S/8N in order to proceed with sign off.multifamilyHVAC / Mechanical· Momentas Inc$45.5KOct 27
- 780 Greenwich Street ManhattanINTERIOR ALTERATION IN APT. 1P ON THE FIRST FLOOR ONLY. NO CHANGE IN EGRESS, OCCUPANCY, OR USE UNDER THIS APPLICATION.multifamilyBuilding, Plumbing· Magnus GS Inc$96KOct 28
- 360 Lexington Avenue ManhattanInterior alteration of office space on 5th floor & 6th floor for banking and financial services.commercialBuilding, HVAC / Mechanical, Plumbing· Whalen Construction, Inc$425KDec 19
- 502 Park Avenue ManhattanAPPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 3RD FL (APT 3B) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR…multifamilyBuilding, HVAC / Mechanical· Mid Developers Inc$25KNov 7
- 251 West 87 Street ManhattanRENOVATE APARTMENT #53 ON THE 5 FLOOR DEMO EXISTING PARTITIONS PROVIDE NEW PARTITIONS CHANGES, FINISHES AND WINDOW CHANGES AS PER PLANS FILED NO CHANGE IN USE OCCUPANCY OR EGRESS.multifamilyBuilding, Plumbing· R&F Park Construction Cor$193KNov 14
- 304 East 65 Street ManhattanArchitectural changes on the 39th floor as indicated on drawings.multifamilyBuilding· English Painting Co LLC$118KOct 27
- 35 West 45 Street ManhattanInstallation of suspended scaffold for facade work or inspection.commercial· 3j's Restoration Inc—Oct 27
- 203 East 72 Street ManhattanHEREBY FILING FOR THE INTERIOR RENOVATION OF EXISTING APARTMENT #22A. NO CHANGE TO USE, OCCUPANCY OR EGRESS.multifamilyBuilding, Plumbing· Carreras Home Improv Inc$99.3KOct 27
- 950 3 Avenue ManhattanDemolition and Construction of Partitions, Doors, Suspended Ceiling, Millwork, Wall & Floor Finishes on 23rd Floor Including Replace Existing Pantry and Renovation of Existing…commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Ami And Associates Inc$422KOct 28
- 524 Broadway ManhattanERECT A NON-ILLUMINATED BUSINESS ACCESSORY FLAG ON EXISTING POLES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialSigns· Mauceri Sign Systems LLC—Oct 27
- 48 Great Jones Street ManhattanSuspended Scaffold for Facade Restoration as Shown on Plansmultifamily· Skyhigh Murals - Colossal—Oct 27
- 100 West 18 Street ManhattanAPARTMENT RENOVATION THROUGHOUT, INCLUDING LAYOUT MODIFICATIONS TO KITCHEN AND MASTER SUITE. BATHROOM PLUMBING FIXTURES TO BE REPLACED AND/OR RELOCATED IN ALL BATHROOMS. UPGRADE…multifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· Dartom Cabinetry Corp$367KApr 20
- 55 Central Park West ManhattanWORK TO APT 9CD ON THE 9TH FLOOR OF AN EXISTING 17 STORY MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIST OF INTERIOR PARTITION WORK. NO CHANGE TO ZONING, USE, EGRESS OR…multifamilyBuilding, HVAC / Mechanical, Plumbing· Skinner Plumbing & Heatin$149KFeb 10
- 360 East 65 Street ManhattanPlumbing modifications to the plumbing fixtures in units 5F and 6G. NO CHANGE TO USE EGRESS OR OCCUPANCY.multifamilyPlumbing· VMC Plumbing & Heating In$40KOct 27
- 360 East 65 Street ManhattanINTERIOR RENOVATIONS IN APARTMENTS 5F & 6G AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY.multifamilyBuilding· Emprise Construction Inc$80KOct 27
- 485 Lexington Avenue ManhattanModifications to the existing standpipe system on the 19th floor (Offit Capital) as per plans. No change to use, egress or occupancy.commercial· Bedrock Mechanical Inc$25KOct 27
- 575 Lexington Avenue ManhattanGeneral Construction modifications to take place on the 27th floor as per drawings filed herewith. No change in use, egress, or occupancy.commercialBuilding· Clune Construction Co LP$922KOct 27
- 485 Lexington Avenue ManhattanModifications to the existing sprinkler system on the 19th floor (Offit Capital) as per plans. No change to use, egress, or occupancy.commercialFire protection· Bedrock Mechanical Inc$75KOct 27
- 815 2 Avenue ManhattanINSTALL EXTERIOR NON-ILLUMINATED D/F BANNER SIGN (KENNEDY INTERNATIONAL SCHOOL)commercialSigns· Active Signs Inc—Oct 27
- 125 Barclay Street ManhattanDECOMMISSION OF EXISTING TMO SITE. REMOVE EQUIPMENT AND 4 RRH FROM 4TH FLOOR. REMOVE 4 ANTENNAS FROM FACADE . REMOVE CABLES FROM 4TH AND FACADE.NO CHANGE IN USE, EGRESS OR…commercial· Squan Construction Servic$63KOct 27
- 412 East 81 Street ManhattanInterior renovations of medical office as per plans filed herewith. No change to use, egress or occupancymultifamilyBuilding· Axiak Construction Corp$78KOct 27
- 575 Lexington Avenue ManhattanMechanical modifications to take place on the 27th floor as per plans filed herewith. No change in use, egress, or occupancy.commercialHVAC / Mechanical· Clune Construction Co LP$178KOct 27
- 599 Lexington Avenue ManhattanREMOVAL AND INSTILLATION OF INTERIOR NON LOAD BEARING PARTITIONS AND RELATED FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCYcommercialBuilding· JT Magen & Company Inc$18.5MOct 27
- 653 11 Avenue ManhattanSuspended Scaffold for Facade Restoration as shown on Planscommercial· 4 Star Contracting Inc—Oct 27
- 333 East 49 Street ManhattanREPLACEMENT (1) NEW GAS DOUBLE EFFECT DIRECT FIRED CHILLER. REPLACEMENT WITH (1) NEW GAS BURNER. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.multifamilyHVAC / Mechanical, Plumbing· Crystal Comfort Inc$615KNov 20
- 11 Madison Avenue ManhattanModifications to the existing plumbing fixtures on the 13th Floor (Pinterest) as per plans. No change to use, egress, or occupancy.commercialPlumbing· Lab PLBG & HTG Co Inc$663KOct 27
- 100 Beekman Street ManhattanRENOVATION OF APT 12L. INTERIOR PARTITION REMOVAL AND CONSTRUCTION RELATED TO RENOVATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY.multifamilyBuilding· Energy Building Construct$72.9KOct 27
- 336 West 11 Street ManhattanRENOVATION OF APARTMENT 4B: NEW NON LOAD BEARING PARTITIONS, CEILINGS, DOORS, KITCHEN CABINETS. PLUMBING IS FILED THRU A SUBSEQUENT APPLICATION. NO CHANGE OF USE, EGRESS OR…multifamilyBuilding, Plumbing· Total Builder Constructio$49.5KOct 30
- 60 Collister Street ManhattanHEREWITH FILING FOR PARTITIONS MODIFICATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.multifamilyBuilding, Plumbing· Bronze Hill Inc$237KNov 7