New York City commercial construction projects
62,113 commercial and multifamily projects from New York City’s building permit records (11,363 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 8, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 590 of 1243
- 43-73 9 Street QueensFiling for faade repairs work that includes replacement of brick masonry parapet walls, repair of eroded mortar joints, replacement of cracked windowsills, replacement of steel…commercialBuilding· T&J Contracting Inc$325KOct 31
- 41-48 40 Street QueensINTERIOR NON-STRUCTURAL ALTERATION OF APARTMENT UNITS C10 , D8, AND D9. REPLACEMENT OF FIXTURES, FINISHES, AND LIGHTING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.multifamilyBuilding, Plumbing· Windsor Construction GRP$103KDec 2
- 103-02 101 Avenue QueensFacade and roof restoration as indicated on drawings.commercialBuilding· Victoria Restoration Corp$800KOct 31
- 37-08 Broadway QueensAPPLICATION FILED TO SIGN OFF #400861340: GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. INTERIOR DEMO PARTITION AND CEILING WORK; AND #400628406 RENOVATION OF…commercialBuilding, HVAC / Mechanical, Plumbing· Aaron PLBG And Mech Syst$55KNov 5
- 39-21gar 108 Street QueensApplication filed to resolve ECB violation 39095445K, legalize demolition of existing garage.multifamilyDemolition· Dfe Contractor LLC—Oct 31
- 54-40 74 Street QueensRELOCATE & REPLACE EXISTING VAV THERMOSTAT AND REBALANCING OF EXISTING SUPPLY AIR; PROVIDE NEW RETURN AIR PLENUM GRILLE.commercialHVAC / Mechanical· Volmar Construction Inc$25KOct 31
- 42-70 156 Street QueensINSTALLATION OF NEW METAL DOOR AND FRAME AT BOILER ROOM, NO CHANGE IN USE OR OCCUPANCY IS INVOLED UNDER ATHIS APPLICATION.multifamilyBuilding· My Friend Construction LL—Oct 31
- 108-55 69 Avenue QueensROOF PARAPET REBUILDING AND SPANDREL BEAM REINFORCEMENT; SHELF ANGLE INSTALLATIONcommercialBuilding, HVAC / Mechanical· U & I Mechanical Corp$600KNov 26
- 213 East 83 Street ManhattanINSTALLATION OF TEMPORARY ENGINEERED ENCLOSED SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialHVAC / Mechanical· Core Scaffold Systems Inc—Oct 31
- 24 East 39 Street ManhattanMATERIAL HOISTcommercial· Rosenwach Tank Co.,LLC—Oct 31
- 160 West 77 Street ManhattanMATERIAL HOISTmultifamily· Rosenwach Tank Co.,LLC—Oct 31
- 5 East 47 Street ManhattanRenovation of an existing eating and drinking establishment. No change of use, egress, or occupancy under this application.commercialBuilding· NJL Property Solutions$50KOct 31
- 250 West 54 Street ManhattanSUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE RESTORATION WORK AT 250 WEST 54 STREET, MANHATTAN, NY 10019commercial· Lineal Const & Rest Corp—Oct 31
- 234 East 53 Street ManhattanInterior renovation of existing eating and drinking establishment. Filed in conjunction with Alt-1 application #120430382. All as per plans and applications. No change in use,…multifamilyBuilding, HVAC / Mechanical, Plumbing· John & Joseph Bonanno Con$281KApr 23
- 1399 Park Avenue ManhattanFACADE INSPECTION Designated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Oct 31
- 1060 Park Avenue Manhattaninspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Diego Buri Cumbemultifamily· Streamline Consultants NY—Oct 31
- 329 First Avenue ManhattanInstall illuminated wall sign. No change in egress, occupancy or usecommercialSigns· Ultimate Signs&Designs Co—Oct 31
- 544 West 157 Street ManhattanINSTALLATION OF THE SUSPENDED SCAFFOLDING INSTALLED IN ORDER TO PERFORM EXTERIOR REPAIRS. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION. NO CHANGE IN USE OCCUPANCY OR EGRESS…multifamilyBuilding· C&C Daley's Const.Corp—Oct 31
- 329 First Avenue ManhattanInstall illuminated wall sign. No change in use, egress or occupancycommercialSigns· Ultimate Signs&Designs Co—Oct 31
- 140 West 24 Street Manhattaninspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Diego Buri Cumbecommercial· Streamline Consultants NY—Oct 31
- 250 West 57 Street ManhattanGeneral construction modifications taking place on the 12-14th floors as per plans filed herewith. No change in use, egress or occupancycommercialBuilding· Structure Tone, LLC$250KOct 31
- 146 Chambers Street ManhattanINSTALL EXTERIOR ILLUMINATED DOUBLE SIDED BLADE SIGN (JAY'S PIZZA)multifamilySigns· Paul Signs, Inc—Oct 31
- 547 Laguardia Place ManhattanReplacement of (3) rooftop package air conditioning units. All existing ductwork to remain as is. No change in use egress and occupancy.commercialHVAC / Mechanical· Donnelly Mechanical Corp$45KOct 31
- 346 West 36 Street ManhattanPROPOSED INTERIOR RENOVATION ON 4TH FLOOR(APT#4C). REPAIRING CEILING AND FLOORING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding, Plumbing· S & L Plumbing Inc$50.9KNov 3
- 120 Central Park South Manhattaninstallation of suspended scaffold for facade work and/or inspection . Amend #1 change in outrigger positionsmultifamily· Inter Renovation Inc—Oct 31
- 247 West 37 Street Manhattaninspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Diego Buri Cumbecommercial· Streamline Consultants NY—Oct 31
- 104 Macdougal Street ManhattanRenovation of apartment #20 on 6th floor.multifamilyBuilding, Plumbing· Berwen Contracting Co.Inc$84KFeb 11
- 406 East 9 Street ManhattanRenovation of apartment #21 on 6th floor.multifamilyBuilding· Berwen Contracting Co.Inc$84.6KOct 31
- 909 Third Avenue ManhattanMODIFICATIONS TO EXISTING DUCTS/PIPING AS PER PLANS FILED HEREWITHcommercialHVAC / Mechanical· Icon Interiors Inc$120KOct 31
- 147 West 24 Street ManhattanAPPLICATION FILED FOR INTERIOR REMOVAL OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 5TH & 7TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR…commercialBuilding· Thesquare.NYC Corp$30KOct 31
- 88 Thayer Street ManhattanREPLACE OIL BURNER WITH GAS/OIL BURNER ON EXISTING BOILER.multifamilyBuilding, HVAC / Mechanical, Plumbing· Service Tech Mech&PLBG In$42KOct 31
- 315 West 115 Street Manhattanstucco installation, repainting and brick replacement as per plan. no change in use, egress or occupancy with this applicationmultifamilyBuilding· HD Contractors Corp$32.4KOct 31
- 119 West 22 Street ManhattanRESTORATION & REHABILITATION OF THE SOUTH BUILDING FACADE, INCLUDING THE PARAPET & BULKHEAD, TO COMPLY WITH LOCAL LAW 126: SECTION 28-301.1.1commercialBuilding· Aarco Contracting LLC$40KOct 31
- 55 Water Street ManhattanFiling herewith mechanical plans for office renovation work on the 32nd floor as per plans filed. No change in Use, Egress or Occupancy under this application.commercialHVAC / Mechanical· John Gallin & Son, Inc$115KOct 31
- 1185 Avenue Of The Americas ManhattanMinor demolition with installation of new partitions, doors, ceilings and finishes on the 7th floor (Hana Bank & PreBuild) as per plans. No change to use, egress or occupancy.commercialBuilding· Acc Construction Corp$1.2MOct 31
- 121 Reade Street ManhattanSuspended Scaffold for Facade Restoration as Shown on Plansmultifamily· Rigging Consultants Inc—Oct 31
- 11 Madison Avenue ManhattanModifications to the existing plumbing fixtures on the 17th Floor (Tempus) as per plans. No change to use, egress, or occupancy.commercialPlumbing· Par Plumbing Co., Inc$30KOct 31
- 452 5 Avenue ManhattanInstallation of partitions and finishes, HVAC, installations and modifications, plumbing installations, and modifications, sprinkler and standpipe, installations, and…commercialBuilding· L&K Partners, Inc$13.6MOct 31
- 452 5 Avenue ManhattanInstallation of partitions and finishes, HVAC, installations and modifications, plumbing installations, and modifications, sprinkler and standpipe, installations, etc.commercialBuilding· L&K Partners, Inc$9.1MOct 31
- 452 5 Avenue ManhattanInstallation of partitions and finishes, HVAC, installations and modifications, plumbing installations, and modifications, sprinkler and standpipe, installations, and…commercialBuilding· L&K Partners, Inc$6.3MOct 31
- 149 2 Avenue ManhattanRENOVATE APARTMENT 2 & 3. GENERAL CONSTRUCTION RELATED TO APARTMENTS RENOVATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY.multifamilyBuilding, HVAC / Mechanical, Plumbing· Dualcore Construction MGT$201KDec 16
- 11 West 30 Street ManhattanInstallation of AC system as per plans filed herewith. No change in use, egress and occupancy.multifamilyBuilding, HVAC / Mechanical· Cooling Controls Corp$60KNov 7
- 178 Avenue D ManhattanFILING FOR REPLACEMENT OF EXISTING BATHROOM & KITCHEN PLUMBING FIXTURES WITH NEW. REMOVE AND REPLACE SAN, VENT AND STACKS IN KIND. NO CHANGE IN EGRESS, USE OR OCCUPANCY.multifamilyPlumbing· Eastern PLBG & Mech Contr$370KOct 31
- 600 3 Avenue ManhattanApplication filed for the renovation of existing retail space at 1st floor, including new interior non-load bearing partition work, plumbing, equipment, finishes, and all other…commercialBuilding· Alchemy Development$126KOct 31
- 770 3 Avenue ManhattanFILING FOR INTERIOR RENOVATION TO EXISTING RETAIL SPACE ON BAS AND CEL LEVEL. NO CHANGE TO USE OCCUPANCY OR EGRESS.multifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· Darby Construction SVC LL$884KDec 2
- 1251 Avenue Of The Americas ManhattanINSTALLATION OF A SPRINKLER SYSTEM ON THE CELLAR- SC1 FLOOR (VERIZON ROOM AND FUEL TANK GENERATION ROOM) AT THE HINES BUILDING AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE,…commercialFire protection· Sirina Fire Prot Corp$58.5KOct 31
- 75 East End Avenue ManhattanInterior renovation to Apt 15B as per plans filed. No Change in Use, Egress or Occupancy.multifamilyBuilding, Plumbing· Innova Building Corp$169KFeb 3
- 204 West 4 Street ManhattanMechanical modifications and associated ductwork at subject premises (JPMC STONEWALL) as per plans filed herewith. No change of use egress or occupancy.commercialHVAC / Mechanical· P.J. Mechanical Corp$158KOct 31
- 452 Fifth Avenue ManhattanModifications to existing mechanical systems as per plans filed herewith. No change in use, egress, or occupancy.commercialHVAC / Mechanical· Tri-Star Construction Cor$4MOct 31
- 333 East 30 Street ManhattanHEREBY FILING FOR THE RENOVAITON/COMBINATION OF UNITS 18M & 18N ON 18TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding· Jadcom Construction Corp$112KOct 31