New York City commercial construction projects
62,113 commercial and multifamily projects from New York City’s building permit records (11,363 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 8, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 571 of 1243
- 452 5 Avenue ManhattanInstallation of partitions and finishes, HVAC, installations and modifications, plumbing installations, and modifications, sprinkler and standpipe, installations, and…commercialHVAC / Mechanical· L&K Partners, Inc$2.2MNov 13
- 12 East 86 Street ManhattanINTERIOR RENOVATION AS INDICATED ON THE DRAWINGS.multifamilyBuilding, Plumbing· Antis Maintenance Corp$87.1KNov 19
- 40 West 67 Street ManhattanRENOVATION OF APT 5AB FILED IN CONJUNCTION WITH DOB NOW PL AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.multifamilyBuilding, HVAC / Mechanical, Plumbing· Paul Quinn PLBG & HTG Inc$408KDec 2
- 1 Rockefeller Plaza ManhattanSprinkler head changes as indicated on plans.commercialFire protection, HVAC / Mechanical, Plumbing· J.A. Jennings, Inc$156KNov 19
- 1 Rockefeller Plaza ManhattanInterior demo & reno of non-load bearing partitions, walls, ceiling, doors and finishes as indicated on plans.commercialBuilding· J.A. Jennings, Inc$533KNov 13
- 1185 Avenue Of The Americas ManhattanModifications to the existing HVAC system on the 7th floor (Hana Bank & PreBuild) as per plans.. No change to use, egress, or occupancy.commercialHVAC / Mechanical· Acc Construction Corp$450KNov 13
- 30 Little West Street ManhattanGENERAL CONSTRUCTION TO RENOVATE APT #4B ON THE 4TH FLOOR. WORK WILL INCLUDE NEW PARTITIONS AND FINISHES, NEW FLOOR TILE, AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR…multifamilyBuilding, Plumbing· Speechless Enterprises In$178KDec 12
- 149 Fifth Avenue ManhattanPropose plumbing and sprinkler work as per drawings filed herewith. No change in use, egress or occupancy.commercialFire protection, Plumbing· DV Plumbing Inc$104KNov 14
- 201 West 70 Street ManhattanINTERIOR RENOVATION OF APT. 38B ON THE 38TH FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.multifamilyBuilding· Ceko Contracting Inc$52KNov 13
- 315 East 72 Street ManhattanInstallation of suspended scaffold for facade work or inspection.multifamily· Tower Services Inc—Nov 13
- 125 West 45 Street ManhattanFiling for General construction modifications on the 4-16 floors as per plans filed herewith. No change in use, egress or occupancy.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· V's Prime Mechanical, LLC$8.2MNov 21
- 203 West 146 Street ManhattanReplacement of two existing boilers with in-kind units, as the original boilers have deteriorated over timemultifamilyHVAC / Mechanical· Watson's PLBG, HTG, & BDG$260KNov 13
- One Bryant Park ManhattanGENERAL CONSTRUCTION RELATED TO INTERIOR OFFICE RENOVATION AT THE 25TH & 26TH FLOORS INCLUDING DEMO OF EXISTING & CONSTRUCTION OF NEW PARTITIONS, FINISHES, DOORS, CEILING AS…commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· JRM Construction MGMT LLC$8.3MDec 10
- 65 Central Park West ManhattanINTERIOR RENOVATION OF THE EXISTING APARTMENT #7B INCLUDING NON-STRUCTURAL PARTITION DEMOLITION AND MINOR NEW PARTITION WORK. NO CHANGE TO THE USE, EGRESS, OR OCCUPANCY.multifamilyBuilding, Plumbing· Nuza Home Improvement Cor$400KNov 13
- 488 Madison Avenue ManhattanInterior renovation to include demolition of existing and construction of new partitions in suite 1706. no change in use, egress, or occupancy.commercialBuilding, HVAC / Mechanical, Plumbing· Nucor Construction Corp$319KDec 3
- 1005 1 Avenue ManhattanFacade work as shown on the plans.commercialBuilding· Skyline Windows LLC$150KNov 13
- 180 West Houston Street ManhattanPROPOSED INTERIOR RENOVATION OF UNIT 8H. REMOVAL OF SELECTIVE NON-LOAD BEARING PARTITIONS AND FIXTURES. INSTALLATION OF NEW BATHROOM FIXTURES, KITCHEN FIXTURES, AND NON-LOAD…multifamilyBuilding, Plumbing· Beyer Construction Corp$197KJan 30
- 28 Liberty Street ManhattanInterior renovation/Fit out for new office with existing demising walls as per plans filed herewith. No change to use, egress or occupancy.commercialBuilding· John Gallin & Son, Inc$1.6MNov 13
- 70 East 10 Street ManhattanHEREBY FILING FOR THE INTERIOR RENOVATION OF EXISTING APARTMENT 14M.NO CHANGE TO USE OCCUPANCY OR EGRESS.multifamilyBuilding, Plumbing· Tomak Group Inc$172KNov 17
- 450 West 33 Street ManhattanINTERIOR RENOVATION SEPARATING RESTAURANT B FROM THE MARKET HALL WITH A RATED PARTITION WALL AND RECONFIGURED CORRIDOR ACCESS.NO REMOVAL OF BASE BUILDING SYSTEMS, STRUCTURE, NOR…commercialBuilding· Summit Interiors, Inc$80KNov 13
- 4101 Broadway ManhattanFACADE REPAIR ON THE EXTRERIOR OF BUILDING AS SHOWN ON PLANS NO CHANGE TO EGRESS USE OR OCCUPANCYmultifamilyBuilding· Uphold Construction Corp$350KNov 13
- 225 East 79 Street ManhattanInterior renovations consisting of partitions and finishes along with mechanical ventilation as per plans filed herewith. No change to use, egress or occupancymultifamilyBuilding, HVAC / Mechanical, Plumbing· Murray Craft Buld Corp$60KApr 13
- 300 East 74 Street ManhattanMERGE APARTMENTS 8D AND 8E, INTERIOR RENOVATION. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.multifamilyBuilding· United Brothers Pro Const$44KNov 13
- 3 East 85 Street ManhattanRoof Replacement Project as per plans. No changes to use, egress or occupancy.multifamilyBuilding· 6th Avenue Construction &$177KNov 13
- 564 Park Avenue ManhattanINSTALL NEW (2) NEW CHIMNEY LINERS AND REPLACE DRAFT INDUCERS AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.commercialHVAC / Mechanical· United Chimney Corp$85KNov 13
- 300 Central Park West ManhattanApt 6E: removal, replacement. addition of non structural partitions, finishes, millwork, repair/repainting, new suspended gypsum board ceilings, flooring and lighting to…multifamilyBuilding, HVAC / Mechanical, Plumbing· Willowfield Development$415KNov 14
- 5 Weehawken Street ManhattanModification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.multifamilyHVAC / Mechanical· Aa Capri Construction$45KNov 13
- 5 Weehawken Street ManhattanRemoval and installation of interior non bearing partitions and related finishes as per plans filed herewith to combine unit 2A-2B. No change in use, egress or occupancy under…multifamilyBuilding· Aa Capri Construction$230KNov 13
- 2 Charlton Street ManhattanRENOVATION OF KITCHEN AND BATHROOM WITH MINOR PARTITION WORK. NO CHANGE OF USE. EGRESS. OR OCCUPANCY.multifamilyBuilding, Plumbing· Aspect Plbng&HTNG Co LLC$88KNov 13
- 302 West 12 Street ManhattanPlumbing work associated with the renovation of an existing penthouse apartment.multifamilyPlumbing· P.H. Works Inc$34.9KNov 13
- 45 Sutton Place South ManhattanRENOVATION OF EXISTING APARTMENT AT SECOND FLOOR LEVEL OF 45 SUTTON PLACE SOUTH, AS PER ATTACHED PLANS. NO CHANGE IN OCCUPANCY, USE, EGRESS, FLOOR AREA, VOLUME OR FIRE SAFETY.multifamilyBuilding, Plumbing· Legend 3 Construction Cor$221KNov 17
- 430 7 Avenue ManhattanInstallation on walkable grating platform around existing rooftop units.commercialBuilding· Clearview BLDG SVCS. Inc$173KNov 13
- 605 Park Avenue ManhattanGeneral Construction for localized masonry replacement, localized mortar, replace defective lintels/flashings, & replace parapet coping stones, at street facades & south/east…multifamilyBuilding· Prat Enterprises Corp$348KNov 13
- 808 Columbus Avenue ManhattanINSTALLATION OF OUTRIGGER FOR BUILDING INSPECTION AND FACADE REPAIR.multifamilyBuilding· Unique Const & Home Imp I—Nov 13
- 161 Ft Washington Avenue ManhattanHIP Linen Distribution: HVAC MODIFICATIONS TO ACCOMMODATE THE LINEN DISTRIBUTION PROJECT IN THE EXSITING HOSPITAL BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCYcommercialBuilding, Fire protection, HVAC / Mechanical· Hellman Construction Co$1.5MNov 17
- 425 West 50 Street ManhattanInstallation of HVAC work for stacked dryers at basement. No change to use, occupancy, or egress.multifamilyHVAC / Mechanical· King Rose Of NY, Inc$169KNov 13
- 521 Fifth Avenue ManhattanMODIFICATION/INSTALLATION OF NON LOAD BEARING PARTITIONS AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialBuilding· B Deopaul's General Const$375KNov 13
- 375 Madison Avenue ManhattanFiling herewith for installation of Temporary Dry Standpipe for fire protection during ongoing demolition and construction as part of redevelopment project.commercialFire protection· Sirina Fire Prot Corp$2.5MNov 13
- 956 Madison Avenue ManhattanFACADE REPAIR WHICH INCLUDES THE REHAB OF EXISTING S. EXTERIOR WALLS, RE-POINT & REPLACE DETERIORATED BRICKS & MORTAR JOINTS, APPLY NEW STUCCO, REHAB EXISTING ROOF PARAPET WALL,…multifamilyBuilding· Real Dependabl Contr Corp$104KNov 13
- 150 Charles Street ManhattanProposed: demolition and removal of all interior fit out down to sub-surfaces for apartment PHB ( 14th -16th floors). No enlargement proposed and party walls and fire walls to…multifamilyBuilding, Fire protection, HVAC / Mechanical· Flowcon Inc$886KNov 14
- 301 East 22 Street ManhattanCOMBINATION OF APARTMENTS & INTERIOR RENOVATIONS OF APARTMENTS 10N & 10P IN COMPLIANCE WITH TPPN #3/1997. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.multifamilyBuilding, Plumbing· Edr Const & MGMT Inc$175KSep 14
- 51 Crosby Street ManhattanInstallation of a private roof terrace for use by tenants of apartment 6G. No change to use, egress or occupancymultifamilyBuilding· R&R Construction LLC$70KNov 13
- 40 West 57 Street ManhattanMODIFY STOREFRONT, INSTALL THE RATED DEMISING WALL, REMOVE THE WALL BETWEEN THE EXISTING AND EXPANDED EATING & DRINKING ESTABLISHMENT, AND CHANGE THE USE FROM RETAIL TO EATING…commercialBuilding· CPM Builders Inc$484KNov 13
- 310 East 12 Street ManhattanInterior renovation as shown on plans filed herewith.multifamilyBuilding, Plumbing· DNSH Inc$65.8KNov 20
- 155 Fifth Avenue ManhattanPROPOSED EXTERIOR FACADE RESTORATION AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialBuilding· Vmma Construction LLC$60KNov 13
- 59 Christopher Street ManhattanPROPOSED INTERIOR DWELLING UNIT, STAIR AND ROOF RENOVATION AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding· Abc Restoration Inc$275KNov 13
- 45 West 36 Street ManhattanPlumbing modifications to the 4th floor as per plans filed herewith. No change in use, egress or occupancy.commercialPlumbing· Triple Crown PLBG&HTG Inc$70KNov 13
- 15 Washington Place ManhattanPlumbing modifications to include the conversion of heating and domestic hot water as per plans.commercialPlumbing· Smart PLBG & HTG Corp$132KNov 13
- 1 East 78 Street Manhattanfiling herewith plumbing modifications as per planscommercialPlumbing· Smart PLBG & HTG Corp$100KNov 13
- 3975 Broadway ManhattanCHNY SP: Structural modification as indicated on plans filed herewith.commercialBuilding· Consigli Construction Co$50KNov 13