New York City commercial construction projects
62,113 commercial and multifamily projects from New York City’s building permit records (11,363 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 8, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 533 of 1243
- 138-07 35 Avenue QueensPROPOSE 6 STORY 11 APARTMENTS RESIDENTIAL AND COMMUNITY FACILITY MIXED USE NEW BUILDING AS PER PLANS. OBTAIN NEW C OF O.multifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· Excellent Metropolitan—Apr 24
- 87-07 Springfield Boulevard QueensFILING HEREWITH PLANS AND APPLICATIONS FOR NEW 212 SQFT WOOD DECK ON THE FIRST FLOOR. REMOVE EXISTING WINDOW AND INSTALL DOOR FOR ACCESS. ALSO REPAIR DECK ON SECOND FLOOR. 2ND…multifamilyBuilding· Persi Contracting Corp$31.6KDec 8
- 45-01 Northern Boulevard QueensTHIS APPLICATION INCLUDES ONLY STRUCTURAL AND PARTIAL DEMOLITION DESIGN OF ESCALATOR OPENING FOR FUTURE USE IN1- STORY ALT-2 BLDG WITH CELLAR. PROPOSED CONSTRUCTION IS ON FIRST &…commercialBuilding· Jana Builders Corp$32KDec 8
- 304 West 92 Street ManhattanPlans filed for new elevator control room & storage in Cellar & new diamond plate floor at elevator machine rooms for elevators PE-1 above 9th Floor level & PE-2 above Roof…multifamilyBuilding· New Whitehall Apartments$32KDec 8
- 176 First Avenue ManhattanRENOVATION OF EXISITNG STORE, INCLUDING INSTALLATION OF PARTITION, PLUMBING FIXTURE AND COOKING EQUIPEMENTS; REPLACEMENT OF S/S KITCHEN HOOD AND EXISTING EXHAUST SYSTEM TO…multifamilyBuilding, Plumbing· C Plus Design Group Inc$132KJan 22
- 345 East 69 Street ManhattanInstallation of suspended scaffold for facade work or inspection.multifamily· Lawrence Exterior Rest Co—Dec 8
- 37 Washington Square West ManhattanMATERIAL HOISTcommercial· Rosenwach Tank Co.,LLC—Dec 8
- 511 East 20 Street ManhattanINSTALLATION OF OUTRIGGER SCAFFOLD AS PER DESIGN DRAWING. THIRD LIFELINES TO BE UTILIZED BY EOR FOR THE FOLLOWING LOCAL LAW 11 INSPECTIONS INITIAL FACADE INSPECTION, WORK…multifamily· TC Zone Inc—Dec 8
- 69 Fifth Avenue ManhattanInspection & Facade repairsmultifamilyBuilding· Brend Restoration SVCS In—Dec 8
- 1 Penn Plaza ManhattanMechanical work on the 53rd floor (MGG Expansion) as indicated on drawingscommercialHVAC / Mechanical· Clune Construction Co LP$45KDec 8
- 1 Penn Plaza ManhattanConstruction work on the 53rd floor (MGG Expansion) as indicated on drawings.commercialBuilding· Clune Construction Co LP$365KDec 8
- 620 West 42 Street ManhattanPLUMBING WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyPlumbing· Pipe Solutions Advis Inc$56KDec 8
- 1211 Avenue Of The Americas ManhattanAdditions and modifications to existing plumbing/sprinkler fixtures as per plans filed herewith. No change to use, egress, or occupancy.commercialFire protection· Abco-Peerless Sprklr Corp$215KJan 16
- 45 John Street ManhattanExterior: Repair Existing Building Facade as per plans herewith.multifamilyBuilding· MGR Restro Inc$39.3KDec 8
- 57 West 57 Street ManhattanAPPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 8TH FL (SUITE 809) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS,…commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Optimus Construction&Dev$106KDec 19
- 780 West End Avenue ManhattanGENERAL CONSTRUCTION WORK WORK FILED IN CONJUNCTION WITH DOB NOW PL. M01311342-S2 . NO CHANGE TO USE, OCCUPANCY OR EGRESS.multifamilyBuilding, Plumbing· TLD Services Inc$321KMar 24
- 123 Lafayette Street ManhattanRemoval of non load bearing partitions, removal of plumbing fixtures and dropped ceiling. Add 3 office partitions and replace plumbing fixtures in place under separate LAA permit.commercialBuilding· Armani Design And Develop$52.7KDec 8
- 416 East 76 Street ManhattanGSH 2FL: MODIFICATION OF INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE ALTERATIONS AT PARTIAL 2ND FL AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.commercialBuilding, Fire protection, HVAC / Mechanical· Hellman Construction Co$138KDec 10
- 425 East 86 Street ManhattanJob filed for apartment renovation for unit 9BC located at the 9th floor. No change in use, occupancy or egress.multifamilyBuilding, Plumbing· Murray Craft Buld Corp$110KDec 9
- 535 8 Avenue ManhattanINTERIOR RENOVATION OF THE 16TH FLOOR OFFICE SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialBuilding· Metro Star Contracting C$100KDec 8
- 787 Madison Avenue ManhattanINTERIOR FIT OUT OF NEW MISSONI STORE AT FIRST FLOOR AND SECOND FLOOR OF COMMERCIAL SPACE. NO CHANGE TO OCCUPANCY, USE OR MEANS OF EGRESS ON BOTH LEVELS.multifamilyBuilding· Moma Construction Group$166KDec 8
- 7 Times Square ManhattanInterior demo and build out of partitions, ceilings and doors. No change in use, egress or occupancy.commercialBuilding· John Gallin & Son, Inc$6.2MDec 8
- 50 West 14 Street ManhattanFILING FOR PL SCOPE OF OFFICE RENOVATION. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.commercialPlumbing· Reliable PLBG & HTG Corp$45KDec 8
- 50 West 14 Street ManhattanFILING FOR MS SCOPE OF OFFICE RENOVATION. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.commercialHVAC / Mechanical· Darby Construction SVC LL$180KDec 8
- 255 West 10 Street ManhattanINTRIOR RENOVATIONS OF APT. 2RS INCLUDING PARTITIONS AND FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCYmultifamilyBuilding, Plumbing· GKX Painting Inc$105KFeb 2
- 1181 Broadway ManhattanPatch and paint, interior non-structural partition removal only. Fixtures and finishes limited to ground floor. No change in use, egress or occupancy.commercialBuilding· C&M Drywall & Acoustic Co$102KDec 8
- 568 Broadway ManhattanInterior Fitout of Existing Commercial SpacecommercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· M. Early PLBG & HTG Corp$1.3MDec 15
- 50 Rockefeller Plaza ManhattanMechanical modifications taking place on the 14 fl Construction/15th fl marketing as per plans filed herewith. No change in use, egress or occupancycommercialHVAC / Mechanical· JT Magen & Company Inc$95KDec 8
- 50 Rockefeller Plaza ManhattanGeneral construction modifications taking place on the 14 Construction (15th Fl Marketing) floor as per plans filed herewith. No change in use, egress or occupancycommercialBuilding· JT Magen & Company Inc$815KDec 8
- 21 East 22 Street ManhattanInterior renovations to the 2nd floor apt#2l-all work as per plans submitted. Plumbing filed under subsequent filing. no change to use, egress or occupancy.multifamilyBuilding, Plumbing· KNG Construction Co Inc$275KDec 22
- 211 West 71 Street ManhattanRenovate Apartment 5A- New floors, Kitchen and Bathrooms - no change in use, egress or occupancy.multifamilyBuilding, Plumbing· NY Kitchen & Bath USA Cor$160KDec 8
- 595 Madison Avenue ManhattanMechanical work on part of the 23rd floor (Markets Group) as indicated on drawings.commercialHVAC / Mechanical· Tri-Star Construction Cor$52.9KDec 8
- 1440 Broadway ManhattanMinor interior demolition on 2nd floor as shown on plans filed herewith. No change to use, egress or occupancy.commercialBuilding, Fire protection, HVAC / Mechanical· Bound Construction Corp$270KApr 27
- 250 West 94 Street ManhattanInterior Renovations of Unit 6G as per plans. Limited demolition of non-structural partitions, doors & finishes. Installation of new non-structural partitions doors and finishes.…multifamilyBuilding, Plumbing· Ashtons Remodeling And Co$141KDec 12
- 660 5 Avenue ManhattanGeneral Construction as shown on plans filed herewith. No change in use, egress of occupancy.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· JRM Construction MGMT LLC$171KDec 19
- 157 Chambers Street ManhattanInterior renovation of an apartment Apt 7B at 7TH floor kitchen, new laundry and bathroom renovation. No change of use, egress or occupancy.multifamilyBuilding· Taas Construction Corp In$168KDec 8
- 41 5 Avenue ManhattanGENERAL CONSTRUCTION TO RENOVATE APT 3F ON THE 3RD FLOOR. WORK WILL INCLUDE A NEW KITCHENETTE AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.multifamilyBuilding, Plumbing· Liquid PLBG & HTNG SCS In$125KDec 9
- 220 East 9 Street ManhattanINSTALLATION OF TEMPORARY EASY SCALE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercial· SNG Brick And Stone Inc—Dec 8
- 193 Front Street ManhattanGENERAL CONSTRUCTION TAKING PLACE ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialBuilding· BTR Innovative Builders I$150KDec 8
- 2 Horatio Street ManhattanRENOVATION OF KITCHEN AND ONE 3-PIECE BATHROOM WITH MINOR PARTITION WORK. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.multifamilyBuilding, Plumbing· Quad Contracting LLC$143KDec 10
- 230 Central Park West ManhattanCOMBINE APTS. 9K & 9L IN ACCORDANCE WITH TPPN3/97. INTERIOR DEMO & CONSTRUCTION OF NON-STRUCTURAL PARTITIONS, FIXTURES AND FINISHES. MINOR MECHANICAL WORK TO RECONFIGURE EXISTING…multifamilyHVAC / Mechanical, Plumbing· Azm Home Improvements Inc$110KDec 15
- 387 Grand Street ManhattanInterior renovation of an existing two-bedroom apartment (apt K406) at the 4th floormultifamilyBuilding· Acruz Construction Crop$70KDec 8
- 610 Broadway ManhattanFiling herewith interior renovation of existing 5th floor space. No change in use, egress, or occupancy.commercialBuilding· Ardmore Interiors LLC$25KDec 8
- 166 East 61 Street ManhattanInterior renovation of apt 18E on 18th floor. Remove interior non load-bearing partitions, construct new non load-bearing partitions, finish work. Replace two radiators in kind.…multifamilyBuilding, Plumbing· Wai Kee Construction Inc$175KDec 10
- 1165 Fifth Avenue ManhattanGeneral construction work associated with the renovation of an existing 4th floor apartment. No change to use, egress, or occupancy.multifamilyBuilding· P K Remodeling Inc$185KDec 8
- 520 Broadway ManhattanSTRUCTURAL MODIFICATIONS TAKING PLACE ON CELLAR, 1ST, 2ND, AND 3RD FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialBuilding· Tom Rectenwald Constructi$417KDec 8
- 85 Chambers Street ManhattanPARTIAL DEMOLITION MEANS & METHODS IN CONJUNCTION WITH ALT1 JOB 123700628commercialBuilding, HVAC / Mechanical· Celtic Services NYC Inc$60KFeb 17
- 28 West 23 Street ManhattanWORK CONSISTS OF NEW INTERIOR PARTITIONS, WINDOWS, DOORS, AND FINISHES AT THE 5TH FLOOR.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Phase 3 Interiors LLC$865KFeb 23
- 31 Howard Street ManhattanHEREWITH FILING ARCHITECTURAL WORK FOR 4800 SQ FT ON 3RD FLOOR OF BUILDING AS PER PLANS. NO CHANGE IN USE, EGERSS OR OCCUPANCYcommercialBuilding, Fire protection· Jem Fire Prevention Inc$363KJun 24
- 120 Riverside Boulevard ManhattanAPPLICATION FILED FOR INTERIOR RENOVATION OF EXISTING CORRIDORS/HALLWAYS AND FINISHES ON THE 2ND THRU 18TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR…multifamilyBuilding· Alban Construction LLC$352KDec 8