New York City commercial construction projects
62,113 commercial and multifamily projects from New York City’s building permit records (11,363 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 8, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 527 of 1243
- 64-10 Flushing Avenue QueensHEREBY FILING FOR THE REPLACEMENT AND INSTALLATION OF BOILERS AS PER PLANS. NO CHANGE TO USE OCCUPANCY OR EGRESS.multifamilyHVAC / Mechanical, Plumbing· CN Plumbing Inc$30KDec 11
- 32-30 80 Street QueensPROPOSED INTERIOR RENOVATION TO EXISTING TWO-STORY & CELLAR BUILDING. NO CHANGE TO BUILDING BULK, USE, EGRESS OR OCCUPANCY. TWO-FAMILY TO REMAIN.multifamilyBuilding· Gerebuzza Construction In$525KDec 11
- 31-01 20 Avenue QueensInstallation of 48KBTU Hyper Heat Condenser w/ (2) 18K BTU Ceiling Cassettes in Main Room, and (1) 12KBTU Ceiling Cassette in office for Bldg 136 Construction Loft Building.…commercialHVAC / Mechanical· Acme Industrial Inc$30KDec 11
- 81-90 Utopia Parkway QueensFacade repairs as per plans; no change to egress, use, or occupancy.commercialBuilding· Eagle Vision Construction$138KDec 11
- 94-33 89 Street QueensNON ILLUMINATED NON ADVERTISING ACCESSORY WALL SIGN - INSIDE PROPERTY LINE - QXO - NO CHANGE OF USE, EGRESS, OR OCCUPANCYcommercialSigns· Signstar NYC—Dec 11
- 89-02 Atlantic Avenue QueensNON-ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - QXO. NO CHANGE OF USE, EGRESS OR OCCUPANCY.commercialSigns· Signstar NYC—Dec 11
- 96-05 Horace Harding Expressway QueensNEW CONCRETE MAT SUPPORTING BY HELICAL PILE FOR RELOCATED GENERATOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.commercialBuilding· Double A Concrete Corp$70KDec 16
- 141-19 224 Street QueensRENOVATION OF EXISTING STORE WITH INSTALLATION OF PARTITION WALL AND HANDICAP BATHROOM.commercialBuilding, Plumbing· Black Hammer Construction$64.1KJan 22
- 66-87 Fresh Pond Road QueensGENERAL CONSTRUCTION FOR STORE FRONT REPAIRS, NEW ADA RAMP AND FRAMING ON THE ROOF AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.commercialBuilding, HVAC / Mechanical· James Patrick Company Inc$58KMar 17
- 11-15 37 Avenue QueensReplacement of Boiler. No change of use, egress or occupancy under this applicationcommercialHVAC / Mechanical· Crescent Contracting Corp$453KDec 11
- 302 East 102 Street ManhattanCD-5: SUSPENDED SCAFFOLDING DURING WINDOW/ROOF REPLACEMENT, FILED SEPARATELY. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS…multifamilyRoofing· MC Superstructure Inc—Dec 11
- 17 East 84 Street ManhattanVertical cable tray location inspectionmultifamily· PPM Telecom LLC—Dec 11
- 120 Liberty Street ManhattanInterior renovation of existing commercial space to replace deli cooking equipment's, and install counter table, food service table, etc. No change of use, egress or occupancy.multifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· John Evan Contracting Cor$75KFeb 18
- 114 East 72 Street ManhattanINTERIOR RENOVATION OF APARTMENT 6B & 7B ON THE 6TH & 7TH FLOORS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding, Plumbing· Real Deal Decoration LLC$211KDec 15
- 1695 Madison Avenue ManhattanSuspended Scaffold out rigger installation for facade restopration and inspectionsmultifamily· Zircon Group Inc—Dec 11
- 65 East 112 Street ManhattanSuspended scaffold out rigger installation for Facade repair works and inspectionsmultifamilyBuilding· Zircon Group Inc—Dec 11
- 70 East 115 Street ManhattanSuspended Scaffold out rigger installation for facade restopration and inspectionsmultifamily· Zircon Group Inc—Dec 11
- 1735 Madison Avenue ManhattanSuspended Scaffold out rigger installation for facade restopration and inspectionsmultifamily· Zircon Group Inc—Dec 11
- 400 West 23 Street ManhattanAPARTMENT COMBINATION OF APARTMENT #2L/3K WITH APARTMENT #3L TO CREATE APARTMENT #2L/3KL. NO CHANGE TO USE, EGRESS OR OCCUPANCYmultifamilyBuilding· Leo Construction NY Corp$34KDec 11
- 15 Central Park West ManhattanInstallation of suspended scaffold for facade inspection/repair.multifamilyBuilding· West New York Restoration—Dec 11
- 126 West 73 Street ManhattanAPPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD FOR FACADE REPAIR AND INSPECTION AS PER PLANS FILED HEREIN. No change in egress, use, or occupancy.multifamilyBuilding· Skytrac Access Group LLC—Dec 11
- 152 Franklin Street ManhattanRemoval of existing Mechanical units from penthouse rooftop terrace and installation of new system.multifamilyHVAC / Mechanical· Cottam Heating & Air Cond$34.7KDec 11
- 373 Park Avenue South Manhattanfor the 7th fl. Non bearing partitions and finishes removal. No change in use, egress or occupancycommercialBuilding· Premier Sanitation LLC$36KDec 11
- 159 Madison Avenue ManhattanINTERIOR DEMOLITION AND RELATED CONSTRUCTION OF EXISTING RESIDENTIAL UNIT PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS OR OCCUPANCYmultifamilyBuilding· Wellbuilt Construction$33KDec 11
- 277 Park Avenue ManhattanREMOVAL OF INTERIOR NON-LOAD BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.commercialBuilding, Plumbing· Accord Contr And MGMT Cor$706KJun 12
- 2170 Frederick Douglass Boulevard ManhattanPropose Partial demolition and Concrete polishing and probes for plumbing pipingmultifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· Class One Construction LT$760KMar 18
- 425 East 86 Street ManhattanRENOVATE UNIT 3D ON THE 3RD FLOOR. WORK TO INCLUDE IN-KIND REPLACEMENT OF PLUMBING FIXTURES, KITCHEN CABINETS, LIGHTING, AND FINISH WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY.multifamilyBuilding· Ivan Interiors Inc$100KDec 11
- 1211 Avenue Of Americas ManhattanModifications to existing mechanical systems as per plans filed herewith. No change to use, egress, or occupancy.commercialHVAC / Mechanical· Lacor Mechanical Systems$395KDec 11
- 1 Madison Avenue ManhattanModifications to existing Plumbing System as per plans filed herewith. No change in use, egress, or occupancy.commercialPlumbing· Geoffrey A. Lagas & Assoc$250KDec 11
- 1 Madison Avenue ManhattanModifications to existing Sprinkler and Standpipe Systems per plans filed herewith. No change in use, egress, or occupancy.commercialFire protection· Abco-Peerless Sprklr Corp$250KDec 11
- 1 Central Park South ManhattanIRA TO ASSIST WITH CONDITION ASSESSMENT.multifamily· Skyline Access LLC—Dec 11
- 300 Lafayette Street ManhattanERECT NON-ILLUMINATED D/F ACCESSORY BUSINESS PROJECTING SIGN READING NEKOcommercialSigns· Paul Signs, Inc—Dec 11
- 390 Park Avenue ManhattanInterior modifications to the existing office space including minor demolition, installation of non-load bearing partitions and related finishes. No change in use, egress or…commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Turner Construction Compa$1.8MFeb 10
- 277 Park Avenue ManhattanREMOVAL OF INTERIOR NON-LOAD BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.commercialBuilding· Accord Contr And MGMT Cor$1.4MDec 11
- 178 East 70 Street ManhattanGENERAL CONSTRUCTION TO APARTMENT 2F AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.multifamilyBuilding, Plumbing· All City Remodeling, Inc$45KFeb 9
- 1188 6 Avenue ManhattanFiling plans herewith for the interior renovations to an existing McDonalds restaurant. No change to use, egress, or occupancy.commercialBuilding· Rasco Contracting Corp$60KDec 11
- 12 West 18 Street ManhattanInterior renovation at existing ground floor commercial space only. No change in use, occupancy and egress.multifamilyBuilding· Gold Street Const GR Inc$80KDec 11
- 340 East 51 Street ManhattanHEREWITH FILING FOR INTERIOR RENOVATIONS IN APT 5E AS PER PLANS. NO CHANGE TO USE OCCUPANCY OR EGRESS.multifamilyBuilding· Emprise Construction Inc$40KDec 11
- 500 5 Avenue ManhattanArchitectural scope associated with the renovation of the office space on 21M/20C floor. No change of use, egress, or occupancy.commercialBuilding, HVAC / Mechanical, Plumbing· Stepping Stone Construct$1.2MJan 21
- 120 Elizabeth Street ManhattanINTERIOR RENOVATION OF A CELLAR WITH REMOVE PARTITION, DOOR. REPAIR FLOOR, PARTITION, CEILING, PAINTING AS PER PLAN. ADDRESS ECB VIOLATION 39160594M, 39160595Y, 39160597H,…multifamilyBuilding· High Quality Construction$39KDec 11
- 10 East 53 Street ManhattanMinor demolition with installation of new partitions, doors, ceilings and finishes on the 4th floor (PJ Mechanical) as per plans. No change to use, egress or occupancy.commercialBuilding· Desimone Builders LLC$710KDec 11
- 11 Madison Avenue ManhattanModifications to existing HVAC System as per plans filed herewith. No change in use, egress, or occupancy.commercialHVAC / Mechanical· Structure Tone, LLC$60KDec 11
- 65 Bleecker Street ManhattanBALENCIAGA-- MECHANICAL MODIFICATIONS AND INSTALLATIONS FOR RETAIL BUILD OUT PER PLANS FILED.commercialHVAC / Mechanical· Apb Consulting & Construc$51KDec 11
- 1 Madison Avenue ManhattanINSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES ON THE 7TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialBuilding· Structure Tone, LLC$12.8MDec 11
- 155 West 20 Street ManhattanExterior facade repairs and reconstruction as necessary and per plans submitted. No change in use, occupancy or egress proposed under this application.multifamilyBuilding· Adelphi Restoration Corp$149KDec 11
- 48 East 13 Street ManhattanGENERAL CONSTRUCTION FOR LIMITED EXTERIOR FACADE & ROOF REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding· Juno Contracting Corp$42.8KDec 11
- 39 Claremont Avenue ManhattanINTERIOR RENOVATION IN APT. 101, 102.multifamilyBuilding· Apolon Construction Corp$180KDec 11
- 1 Penn Plaza ManhattanPlumbing work on the 38th floor (restrooms) as indicated on drawings.commercialPlumbing· Bluewater PLBG& HTG Inc$94.8KDec 11
- 1 Penn Plaza ManhattanSprinkler work on the 53rd floor (restrooms) as indicated on drawings.commercialFire protection· Full Capacity Fire Corp$37KDec 11
- 1 Penn Plaza ManhattanMechanical work on the 53rd floor (corridor) as indicated on drawings.commercialHVAC / Mechanical· Mass Contracting Corp$32KDec 11