62,113 commercial and multifamily projects from New York City’s building permit records (11,363 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 8, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 507 of 1243
- 125 Beach 19 Street QueensInstallation of suspended scaffold for facade inspection/repair.multifamilyBuilding· Titan Const Services LLC—Dec 24
- 80-21 164 Street QueensINTERIOR RENOVATION AT FIRST FLOOR (EXISTING OFFICE) ONLY OF 2-STORY COMMERCIAL BUILDING WITH CELLAR. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.commercialBuilding· David Constructing NY, In$126KDec 24
- 37-70 79 Street QueensReplace/register (2) HWH in the cellar with (1) A.O. Smith BT-100, and (1) Bradford White RG275H10N. No change in use, egress, or occupancy.multifamilyHVAC / Mechanical, Plumbing· J.G.C PLBG & HTG Inc$41.3KFeb 9
- 4731 Center Boulevard QueensTO INSTALL PARTITION WALLS FOR EXISTING RETAIL SPACE AT 001 FLOOR WITH GENERAL CONSTRUCTION AND MECHANICAL WORK TYPE AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR…multifamilyHVAC / Mechanical· Yax Home Improvement Corp$242KDec 24
- 30-30 Northern Boulevard QueensInterior renovation to expand an existing vacant tenant space to dental offices. No change in use, egress or occupancy.commercialBuilding, Fire protection, Plumbing· Absolute FBS Contracting$755KApr 9
- 71-17 Cooper Avenue Queensdemolition of dwellings at 71-17 & 19 Cooper AvemultifamilyDemolition· JV Fast Construction LLC$30KDec 24
- 614 Woodward Avenue QueensNEW STEEL COLUMNS AND BEAMS, AND NEW WOODEN BEAMS THROUGHOUT. APPLICATION TO SUPERSEDE APP # 421308427commercialBuilding· Dfe Contractor LLC$999KDec 24
- 71-19 Cooper Avenue Queensdemolition of dwellings at 71-17 & 19 Cooper AvemultifamilyDemolition· JV Fast Construction LLC$30KDec 24
- 75 Baxter Street ManhattanSUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE RESTORATION WORK AT 75 BAXTER STREET, MANHATTAN, NY 10013multifamily· A.Taher Contracting Co In—Dec 24
- 209 East 76 Street ManhattanReconstruction of sidewalk vault deck. Structural column and floor framing repairs at cellar & 1st floor levels.multifamilyBuilding· Urbanade Corp$75KDec 24
- 32 Avenue Of Americas ManhattanFiling to replace (5) CRAC Units and related pipingcommercialHVAC / Mechanical· Tishman Interiors Corp$260KDec 24
- 32 Avenue Of Americas ManhattanFiling for the Removal of Existing Crac Units on the 11th floor and remove and modify existing raised floor to accommodate New Floor stands and equipment Floor stands.commercialBuilding· Tishman Interiors Corp$244KDec 24
- 5030 Broadway ManhattanMINOR INTERIOR SCOPE OF WORK ON 2ND FLOOR. THE SCOPE OF WORK ON 2ND FLOOR INCLUDES CRAC REPLACEMENT IN PHASES. NO CHANGE IN EGRESS OR OCCUPANCY. EXISTING BUILDING CORE AND…commercialHVAC / Mechanical· Tishman Interiors Corp$830KDec 24
- 429 East 12 Street ManhattanINTERIOR RENOVATION TO EXISTING 4 RESIDENTIAL UNITS IN EXISTING 4 STORY PLUS PENTHOUSEcommercialBuilding· Badger Management Inc$292KDec 24
- 401 West 31 Street ManhattanInterior fit-out for new tenant including selective demolition of existing base building walls & doors; construction to include new open workspace, enclosed offices, accessory…commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Structure Tone, LLC$9.3MFeb 4
- 25 Beaver Street ManhattanOFFICE RENOVATION WORK (OFFICE OF COURT ADMINISTRATION) WORK TO INCLUDE PARTITION, CEILING AND DOOR MODIFICATIONS AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Nucor Construction Corp$2.7MDec 30
- 835 Riverside Drive ManhattanRENOVATE EXISTING APARTMENT, PARTITIONS, FLOORING, CABINETRY, CEILING, COUNTER, DOORS, FIXTURES & FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCYmultifamilyBuilding· Perfect Way LLC$104KDec 24
- 401 West 31 Street ManhattanModifications to existing SP system as shown on plans. No change in use, egress or occupancy.commercialFire protection· Sirina Fire Prot Corp$106KDec 24
- 1166 Avenue Of The Americas ManhattanStructural modifications (FDIC Office Build Out) as per plans filed herewith. No change to use, egress or occupancy.commercialBuilding· Verus Inc$100KDec 24
- 787 Seventh Avenue ManhattanModifications to the existing Standpipe System; Remove (1) FHC per floor, and Install one (1) new Fire Hose Cabinet and associated Standpipe Piping per floor on the 40, 41, 42,…commercialFire protection· Preferred Spklr And Mech$66KDec 24
- 787 Seventh Avenue ManhattanRemove existing sprinkler heads; Install temporary head and permanent heads and associated sprinkler piping on the 40-42nd and 47th Floors as per plans (WFG/ Phase 2 - Package…commercialFire protection· Preferred Spklr And Mech$857KDec 24
- 787 Seventh Avenue ManhattanInstall new fixtures: (2) HWH, (2) WC, (2) Lavs, (3) DF/BFs, (2) sinks, (1) CM, (1) DW, (1) IM and associated CW/sanitary piping on 40-42, 47th Floors as per plans (Willkie Farr…commercialPlumbing· Preferred Mechanical Inc$1MDec 24
- 361 West 21 Street ManhattanMINOR PARTITION WORK AND REPAIR FLOORING AS PER PLAN. NO CHANGE IN USE, EGRESS, OROCCUPANCY IN THIS APPLICATION.multifamilyBuilding· MBJ Clean Out Inc$25.2KDec 24
- 1845 7 Avenue ManhattanREPLACE TWO GAS BOILERS.multifamilyHVAC / Mechanical, Plumbing· Mccready & Rice Plumbing$163KDec 24
- 337 East 18 Street ManhattanAlteration Type 2 to combine two units on the 2nd floor as per TPPN 3/97 and renovate the apartments on the basement and 1st floor . All work as per plan. No change in use,…multifamilyBuilding· M&N Constr Services Inc$430KDec 24
- 455 West 37 Street ManhattanPROPOSED CO ALTERATION TO CONVERT EXISTING RETAIL SPACE INTO MEDICAL OFFICES INCLUDING INSTALLATION OF NEW NON-BEARING PARTITIONS, FIXTURES, FINISHES AND CASEWORK AND INCLUDING…multifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· US Levin GRP Corp$1.6MMay 14
- 716 Amsterdam Avenue ManhattanGeneral Construction removal of non-load bearing walls, installation of new non-load bearing walls, new floor, wall, and ceiling finishes, new plumbing fixtures, light fixtures,…multifamilyBuilding· Frazier & Sons Constructi$75.2KDec 24
- 55 Liberty Street ManhattanReplace 2 existing split air-cooled HVAC systems, modify existing ductwork, add new toilet exhaust ductwork, remove existing dryer exhaust, replace grills and registers,…multifamilyHVAC / Mechanical· Cow Bay Sprinkler Corp$100KDec 24
- 180 Central Park South Manhattan9th Cycle FISP Repairs, No Change to Use, Egress of Occupancy.commercialBuilding· Exo Industries Corp$978KDec 24
- 182 Hester Street ManhattanINSTALLATION OF PLUMBING FIXTURES AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION.multifamilyPlumbing· XH&RC PLBG And HTG Inc$50KDec 24
- 270 West 126 Street ManhattanFull Demolition of Existing two story Building.commercialDemolition· Dm80 Solutions LLC$25KDec 24
- 55rear Withers Street BrooklynInterior renovation as shown on plans filed herewith.multifamilyBuilding, Plumbing· Watson's PLBG, HTG, & BDG$78.7KJan 22
- 197 Meserole Street BrooklynInstallation, relocation and removal of plumbing fixtures as shown on plans filed herewith.multifamilyBuilding, Plumbing· Bee Constructions LLC$185KJan 26
- 3601 Surf Avenue BrooklynInstallation of suspended scaffold for facade inspection/repair.multifamilyBuilding· Titan Const Services LLC—Dec 24
- 1178 71 Street BrooklynPROPOSED INTERIOR RENOVATION OF CEL, 1ST AND 2ND FLOOR. REMOVE & INSTALL PARTITIONS, FLOOR, AND WINDOWS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.multifamilyBuilding· NY Building Associates In$374KDec 24
- 5 Metrotech BrooklynMechanical modifications as per plans.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· SPK/Lewis Construction LL$640KFeb 27
- 1406 Newkirk Avenue BrooklynMINOR INTERIOR RENOVATION TO THE FIRST FLOOR COMMERCIAL SPACE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.multifamilyHVAC / Mechanical· Iiemar LLC$25.3KDec 24
- 223 Van Brunt Street BrooklynREPLACE DAMAGED AND IMPROPERLY INSTALLED FIRST FLOOR JOISTS AT CELLAR CEILING AND REPLACE FIRE RETARDANT CEILING OF CELLAR IN ORDER TO RESOLVE VIOLATION #039164288M &…multifamilyBuilding· Everlast Custom Construct$71.3KDec 24
- 6208 8 Avenue BrooklynINSTALLATION OF TEMPORARY ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialHVAC / Mechanical· Core Scaffold Systems Inc—Dec 24
- 159 Bay 29 Street BrooklynTHIS APPLICATION IS BEING FILED FOR GENERAL CONSTRUCTION WORK TO RENOVATE & REPAIR EXISTING FIRE DAMAGED APARTMENT #3A, LIFT PARTIAL VACATE ORDER & OATH/ECB VIOLATIONS…multifamilyBuilding· J & R Contractors Service$33KDec 24
- 1941 59 Street BrooklynStructural work associated with Alt-CO #B01240383multifamilyBuilding, Plumbing· DGJ Contracting Inc$1.4MJan 2
- 99 27 Street BrooklynTHE INSTALLATION OF NEW ELECTRICAL EQUIPMENT SUPPORTS (i.e.: RELAY HOUSE ENCLOSURE, FEEDER TERMINATION, DISCONNECT SWITCH AND CCVT/SURGE ARRESTER SUPPORT STRUCTURES) AT CON…commercialBuilding· Con Edison Company Inc$1.3MDec 24
- 29 Cumberland Street BrooklynInstallation at air cooled VRF heat pump systems to provide heating and cooling for building. No change of use, egress or occupancy being filed under this mechanical application.commercialHVAC / Mechanical· MNC General Contr Corp$43KDec 24
- 24 Carlton Avenue BrooklynInstallation at air cooled VRF heat pump systems to provide heating and cooling for building. No change of use, egress or occupancy being filed under this mechanical application.commercialHVAC / Mechanical· MNC General Contr Corp$43KDec 24
- 25 Chapel Street BrooklynALT CO FILED TO CONVERT 4TH FLOOR FROM UG IX ADULT SCHOOL TO UG III SCHOOL (STUDENT AGES 5-21). SCOPE LIMITED TO REPLACEMENT OF LIGHTING FIXTURES.commercialBuilding, Plumbing· Ombrellino Construction &$325KJan 21
- 61 Halsey Street BrooklynInterior alteration and combination of the two 3rd floor units into a single unit per tppn3/97 as per plans filed herewith. Filed in conjunction with no work Alt 1 322118882. No…multifamilyBuilding, HVAC / Mechanical· Upstrate Inc$82KDec 24
- 61 Halsey Street BrooklynInterior alteration and combination of the two 2nd floor units into a single unit per tppn3/97 as per plans filed herewith. No change to use, egress or occupancymultifamilyBuilding· Upstrate Inc$88KDec 24
- 61 Halsey Street BrooklynInterior alteration and combination of the basement and first floor unit per tppn3/97 as per plans filed herewith, to be occupied by the building owner. Filed in conjunction with…multifamilyBuilding· Upstrate Inc$372KDec 24
- 199 34 Street BrooklynPROPOSED 4 STORY WITH PENTHOUSE NEW BUILDING FOR RESIDENTIAL USE. OBTAIN NEW CERTIFICATE OF OCCUPANCYcommercialBuilding· Wing Jay Construction Inc—Dec 24
- 78 Stagg Street BrooklynPROPOSED 4 STORY & CELLAR RESIDENTIAL BUILDING.TOTAL OF 8 UNITS.multifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· Success Developers LLC—Aug 25