62,113 commercial and multifamily projects from New York City’s building permit records (11,363 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 8, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 497 of 1243
- 1355 Castleton Avenue Staten IslandINSTALLATION OF (3) THREE GAS-FIRED POWER VENTED UNIT HEATERS AS PER PLANS SUBMITTED HEREWITH.commercialPlumbing· Crown Plumbing Inc$45KJan 5
- 194 Gordon Street Staten IslandThe work Shall include installation of free-standing non-load bearing partitions NO CHANGE IN USE OCCUPANCY OR EGRESS This amendment is filed to eliminate Plumbing work and…commercialBuilding· T.Pericic Construction$102KJan 5
- 191 Vermont Avenue Staten IslandSELECTIVE REMOVAL: TOILETS, PARTITIONS, SINKS, FIXTURES CONVERTED TO ADA TOILET AND ONE NON ADA TOILET IN BOYS AND GIRLS BATHROOMS. INSTALL NEW ACCESSIBLE: MIRRORS, SINK, DOOR…commercialBuilding, Plumbing· Empire Control Abatement$167KFeb 18
- 60-68 60 Road QueensRENOVATION OF EXISTING CELLAR, 1ST AND 2ND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT REAR YARD. NO CHANGE IN…multifamilyBuilding· Kale Construction Inc$150KJan 5
- 140-46 Sanford Avenue QueensINSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.multifamilyHVAC / Mechanical· A & H Installation Inc$35KJan 5
- 31-85 Crescent Street QueensGARAGE REPAIRS AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCYmultifamilyBuilding· New Amsterdam Restoration$162KJan 5
- 46-09 30 Avenue QueensINTERIOR RENOVATION OF APARTMENTS (1R,1L,2R,2L,3L) AS PER PLANS;--REPLACEMENT OF SHEET-ROCK THROUGH OUT APARTMENT. --REMOVE AND REPLACE FLOOR FINISHES THROUGH OUT AND REPAIR…multifamilyBuilding, Plumbing· Custom Build 1 Inc$435KJan 29
- 136-47 Roosevelt Avenue QueensPROPOSED RENOVATION OF THE EXISTING STORE AND INSTALL THE NEW AIR CONDITIONER AND KTICHEN EXHAUST HOOD AT FIRST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.commercialBuilding, Plumbing· SJ Constr Design Inc$172KMar 9
- 80-21 164 Street QueensPLUMBING WORK IN CONJUNCTION WITH ALT-2 APPLICATION #Q01323022-I1NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATIONcommercialPlumbing· LG Elite Plumbing Inc$25.5KJan 5
- 1931 Mott Avenue QueensThe work Shall include installation of non-load bearing partitions NO CHNAGE IN USE OCCUPANCY OR EGRESScommercialBuilding· T.Pericic Construction$135KJan 5
- 230-79 Rockaway Boulevard QueensGeneral construction work as shown on plans.commercialBuilding, Fire protection, HVAC / Mechanical· Allertonfox Construction$895KJan 6
- 154-05 Northern Boulevard QueensINTERIOR ALTERATION OF COMMERCIAL SPACE AT 002 ONLY. CHANGE USE FROM EATING AND DRINKING ESTABLISHMENT (UG 6) TO RECREATION FACILITIES (BILLIARD PARLOR, INDOOR GOLF RECREATION,…commercialBuilding, HVAC / Mechanical, Plumbing· Seoul Interior & Build In$462KJan 7
- 42-62 Hunter Street QueensTO INSTALL PARTITION WALLS FOR EXISTING RETAIL SPACE WITH GENERAL CONSTRUCTION AND MECHMANICAL WORK TYPE AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF…multifamilyHVAC / Mechanical· Kale Construction Inc$300KJan 5
- 30-09 21 Street QueensINSTALL FIRE SPRINKLER SYSTEMS FOR 6-STORY WITH PENTHOUSE MIXED-USE BUILDINGmultifamilyFire protection· RRP Plumbing Corp$100KJan 5
- 135-06 Liberty Avenue QueensPROPOSED VERTICAL AND HORIZONTAL ENLARGEMENT, AND CONVERSION FROM TWO FAMILY AND STORE TO FOUR FAMILY AND STORE; TO OBTAIN NEW CERTIFICATE OF OCCUPANCY.commercialBuilding· Yafe Meod Corp$584KSep 14
- 103-18 Roosevelt Avenue QueensReplacement of existing non-emergency gas generator on the roof. Related gas piping filed under job # Q01040901-S1. No change in use, egress, or occupancy.commercialHVAC / Mechanical, Plumbing· Amp Communications LLC$115KMay 7
- 105-37 64 Avenue QueensINSTALL WASHER/DRYER MACHINES FOR BUILDING TENANT'S ACCESSORY USE AT CELLAR . WORK INCLUDES PLUMBING PIPING, SPRINKLER HEADS OFF GARAGE SP SYSTEM (FILED SEPARATE APP) ,AND DRYER…multifamilyFire protection, Plumbing· Advanced Plumbing Mech$26.5KJan 23
- 1740 Broadway ManhattanIndustrial Rope Access (IRA) Facade Inspectioncommercial· Superstars Contracting In—Jan 5
- 67 East 97 Street ManhattanFISP Inspection & RepairsmultifamilyBuilding· Specialty Constr Syst Inc—Jan 5
- 780 3 Avenue ManhattanINTERIOR ALTERATIONS TO EXISTING 30TH FLOOR OFFICE SPACE TO INCLUDE NON-LOAD BEARING DEMO, PARTITION AND FINISHES WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESScommercialBuilding, HVAC / Mechanical· Folor Inc$90KFeb 2
- 200 East 65 Street ManhattanSuspended Scaffold for Facade Restoration as Shown on Plansmultifamily· Colgate Restoration Corp—Jan 5
- 450 Lexington Avenue ManhattanInterior demolition and installation of non-bearing partitions, doors and finishes related to tenant fit out. No change in use, egress or occupancy.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· JT Magen & Company Inc$7.8MFeb 5
- 1633 Broadway ManhattanFILING TO REMOVE MECHANICAL EQUIPMENT & PIPING AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.commercialHVAC / Mechanical· Prime Mechanical Contract$403KJan 5
- 111 Mulberry Street ManhattanPROPOSED PLUMBING PLANS FOR AN EATING & DRINKING ESTABLISHMENT ON 1ST FLOOR & MEZZANINE. INSTALLATION OF NEW KITCHEN BAR SINKS. INSTALL NEW COOKING APPLIANCES AND TOILET ROOM…multifamilyPlumbing· S & L Plumbing Inc$58KJan 5
- 810 7 Avenue ManhattanModifications to the existing HVAC system on the 36th floor (Suite 3601) as per plans. No change to use, egress or occupancy.commercialHVAC / Mechanical· Finaly Genl Contr Corp$100KJan 5
- 810 7 Avenue ManhattanMinor demolition with installation of new interior partitions, doors, ceilings and finishes on the 36th floor (Suite 3601) as per plans. No change to use, egress or occupancy.commercialBuilding· Finaly Genl Contr Corp$275KJan 5
- 1411 Broadway ManhattanINTERIOR RENOVATIONS ON 26TH AND 27TH FLOORS AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Tri-Star Construction Cor$4.6MJan 27
- 133 West 21 Street ManhattanINITIAL CD5 FISP. INSPECTION, REPAIRS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ADDING NEW DROPS WITH NEW TIE BACK LOCATIONS OPTION.commercialBuilding· Sato Construction Co. Inc—Jan 5
- 30 Hudson Yards ManhattanRENOVATION OF THE EXISTING 68TH FLOOR PHASE 1 OF AN EXISTING BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· C&A Seneca Construction$1.4MFeb 6
- 205 West 76 Street ManhattanMinor replacement of finishes at bathrooms and like for like replacement of plumbing fixtures. Removal of existing wall tile shall require potential replacement of existing…multifamilyBuilding· Besa Restoration, LLC$45KJan 5
- 35 East 35 Street ManhattanInstallation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.multifamilyBuilding· New Amsterdam Restoration—Jan 5
- 100 Wall Street ManhattanINTERIOR RENOVATION OF OFFICE FLOOR FOR NON LOAD BEARING PARTITIONS AND RELATED FINISHES (Manning&Kass)multifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· Reidy Contracting Group$292KJan 20
- 1626 Third Avenue ManhattanINSTALL REPLACEMENT BOILER/BURNER UNIT AS PER PLANS. FILED IN CONJUNCTION WITH LAA# M01322818-I1-LA. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.multifamilyHVAC / Mechanical, Plumbing· Standard PLBG SVS LLC$80KJan 5
- 230 Riverside Drive ManhattanInterior renovation of Apt 12CC including bathroom remodel, replacement of finishes, fixtures, and millwork, and minor non-structural partition modifications. No change to use,…multifamilyBuilding· Freedom GS Inc$80KJan 5
- 100 Wall Street ManhattanINTERIOR RENOVATION OF OFFICE FLOOR FOR NON LOAD BEARING PARTITIONS AND RELATED FINISHESmultifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· Reidy Contracting Group$199KJan 20
- 110 East 60 Street ManhattanMECHANICAL MODIFICATIONST TAKING PLACE ON THE 12TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialHVAC / Mechanical· Synergy Construction Inc$225KJan 5
- 110 East 60 Street ManhattanGENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 12TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialBuilding· Synergy Construction Inc$990KJan 5
- 10 East 40 Street ManhattanDemolition and general construction work on partial 4th floor as per plans. No change to use, egress or occupancy.commercialBuilding· Cross Management Corp$350KJan 5
- 152 Franklin Street ManhattanRooftop steel dunnage alterations to support (2) mechanical units, maintenance platform, and applicable railings/ ladder.multifamilyBuilding· Dutchess Cabinets Of NY$63KJan 5
- 58 Bowery ManhattanUPDATES TO 2ND FLOOR BANK PER PLANS FILED HEREWITH. INCLUDES MINOR UPDATES TO NON BEARING PARTITION WALLS, UPDATED FINISHES, FURNITURE AND FIXTURES.commercialBuilding· Legacy Builders/Developer$118KJan 5
- 430 Park Avenue ManhattanREMOVAL AND INSTALLATION OF WALLS, DOORS, FLOOR FINISHES AND CEILINGS AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Clune Construction Co LP$1.6MFeb 25
- 501 East 87 Street ManhattanFLOOR PL FIRST LEVEL ABOVE PENTHOUSE BELOW POOL ) DEMOLISHING NON BEARING WALLS AND PARTITIONS IN EXISTING MENS AND LADIES LOCKER ROOM INCLUDING TOILET LAVS AND SHOWERS .multifamilyBuilding, Plumbing· JW Development Holdings L$85KMay 19
- 1333 Broadway ManhattanSTRUCTURAL MODIFICATIONS ON THE 6TH AND 7TH FLOORS AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialBuilding· Turner Construction Compa$114KJan 5
- 400 Madison Avenue ManhattanPLUMBING UPDATES FOR CHOPT CAFE PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.commercialPlumbing· QPR Mechanical Inc$35.1KJan 5
- 400 Madison Avenue ManhattanMECHANICAL UPDATES FOR NEW CHOPT CAFE PER PLANS FILED HEREWITH. NO CHANGE IN OCCUPANCY, USE OR EGRESS.commercialHVAC / Mechanical· Cooper Works Inc$59.2KJan 5
- 275 West 96 Street ManhattanInstallation of (2) water cooled air handlers located in the 12th floor mechanical equipment room.multifamilyHVAC / Mechanical· Winter Cool Air Conditio$65KJan 5
- 45 East 89 Street ManhattanRENOVATION OF EXISTING APARTMENT #37E. GENERAL CONSTRUCTION WORK. NO CHANGE OF USE, OCCUPANCY OR EGRESS.multifamilyBuilding, Plumbing· Cape Plumbing Inc$252KJan 9
- 290 West End Avenue ManhattanGENERAL CONSTRUCTION ARCHITECTURAL FOR THE INTERIOR RENOVATION OF APARTMENT 16B ON THE 16TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.multifamilyBuilding, Plumbing· Buildops Inc$203KJan 23
- 1333 Broadway ManhattanPLUMBING WORK ON THE 6TH AND 7TH FLOORS AS PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialPlumbing· A&A Plumbing Corp$411KJan 5
- 1333 Broadway ManhattanGENERAL CONSTRUCTION ON THE 6TH AND 7TH FLOORS AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialBuilding· Turner Construction Compa$3.5MJan 5