New York City commercial construction projects
62,207 commercial and multifamily projects from New York City’s building permit records (11,501 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 9, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 452 of 1245
- 1568 Broadway ManhattanStructural modifications on floors 2-8 as per plans filed herewith. No changes in use, egress or occupancy.commercialBuilding· Finaly Genl Contr Corp$80.1KFeb 4
- 550 Madison Avenue ManhattanMechanical modifications as per plans filed herewith. No change to use, egress or occupancy .commercialHVAC / Mechanical· JT Magen & Company Inc$1.3MFeb 4
- 1155 6 Avenue ManhattanMechanical work for Liberty Mutual on 10th floorcommercialHVAC / Mechanical· Turner Construction Compa$900KFeb 4
- 51 West 52 Street ManhattanInterior Demo to existing 3rd floor office space as per plans submitted herewith. No Change to Use, Occupancy Group, or EgresscommercialBuilding, Fire protection, HVAC / Mechanical· DK Construction One, Corp$160KFeb 19
- 96 Orchard Street ManhattanPropose interior renovation at partial Basement commercial space of existing mixed use building with partitions and finishes work as per plan. No change in use, egress, or…multifamilyBuilding, HVAC / Mechanical, Plumbing· SLC Restoration Corp$70.9KJul 1
- 245 East 35 Street ManhattanINSTALLATION OF OUTRIGGERS FOR FACADE REPAIR AND INSPECTION.multifamilyBuilding· Canido Basonas Const. Cor—Feb 4
- 179 East 79 Street ManhattanApartment 14AM. Plumbing work in conjunction with new layout of exiting apartment. No change in egress, use or occupancy.multifamilyPlumbing· Metrotech Mechanical Corp$43.7KFeb 4
- 100 West 93 Street ManhattanREMOVAL AND INSTALLATION OF INTERIOR PARTITIONS, FLOORING AND CEILINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding· Arteco And Design Restora$113KFeb 4
- 12 West 72 Street ManhattanFILING TO SHOW AN APARTMENT COMBO/RENOVATION OF APARTMENT 10BC AND 10DmultifamilyBuilding, Plumbing· Da Project Management LLC$130KFeb 19
- 1009 5 Avenue ManhattanFILING FOR TEMPORARY STANDPIPE.multifamily· Five Borough FP, Inc$63.7KFeb 4
- 48 West 37 Street ManhattanSprinkler work on the 12th floor and part of the 13th floor (Culture Fly) as indicated on drawings.commercialFire protection· Ashlar Mechanical Corp$135KFeb 4
- 275 West 96 Street ManhattanInstallation of (3) air cooled split systems & (2) air cooled roof top units located on the 14th floor roof.multifamilyHVAC / Mechanical· Winter Cool Air Conditio$75KFeb 4
- 110 East 1 Street ManhattanRESTORE GAS TO BOILERS.multifamilyHVAC / Mechanical, Plumbing· Ace-Atlas Plbing & HTG$31KFeb 4
- 154 Bleecker Street ManhattanINTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE ON CELLAR LEVEL. NEW WALLS AND FIXTURES PER PLAN. NEW HVAC SYSTEM. NO CHANGE IN EGRESS, USE OR OCCUPANCY.multifamilyBuilding, HVAC / Mechanical, Plumbing· Green City Box Trans Inc$71KFeb 5
- 708 Greenwich Street ManhattanGENERAL CONSTRUCTION FOR THE COMBINATION OF APARTMENTS 6A & 6B AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding, Fire protection, Plumbing· Black Square Builders Cor$304KMar 11
- 500 5 Avenue ManhattanArchitectural scope associated with the renovation of the one-tenant office space on 34M/33C floor. No change of use, egress, or occupancy.commercialBuilding, HVAC / Mechanical, Plumbing· Aggressive Fire Prot LLC$989KFeb 6
- 4 East 66 Street ManhattanREPLACEMENT OF EXISTING PACKAGE UNIT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyHVAC / Mechanical· Momentas Inc$35KFeb 4
- 1120 Amsterdam Avenue ManhattanDemolition of existing ductwork, HW piping, FTR, Fans, Heat exchangers and pumps serving CU Hartley Hall as per plans filed herewith. No change of use, occupancy or egress.commercialHVAC / Mechanical· Skanska USA Building, Inc$253KFeb 4
- 311 Greenwich Street ManhattanRENOVATE KITCHEN AND BATHROOM ONLY. NEW FINISHES WITH NEW FLOOR OVER EXISTING. NO CHANGES TO USE, EXTERIOR, ENERGY, EGRESS, OR OCCUPANCY. 1968 CODE.multifamilyBuilding, Plumbing· A.R.E. Contracting NYC Co$101KFeb 17
- 56 Crosby Street ManhattanINTERIOR ALTERATIONS INCLUDE NEW PARTITIONS, DOORS, FLOORING, LIGHT FIXTURES, PLUMBING FIXTURES AND FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· Raf General Contracting C$456KMar 5
- 100 West 12 Street ManhattanINTERIOR RENOVATION OF APARTMENT 5G ON THE FIFTH FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.multifamilyBuilding, Plumbing· Clearcut Group Corp$65KFeb 5
- 1251 Third Avenue ManhattanAPPLICATION OF NEW INTERIOR FIREPROOFING ONLY TO EXISTING ELEMENTS & EXTERIOR MASONRY ALTERATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding· Modern Dynamic Assembly$148KFeb 4
- 150 Broadway ManhattanAir conditioning units replacement on the roof. All existing ductwork to remain. No change in use egress and occupancy.commercialHVAC / Mechanical· M & S Mechanical Services$100KFeb 4
- 630 2 Avenue ManhattanHEREWITH FILING STRUCTRUAL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialBuilding· Structure Tone, LLC$89.1KFeb 4
- 424 Fifth Avenue ManhattanFILING FOR MINOR INTERIOR RENOVATION OF 11TH FLOOR NEW YORK GLASS DOORS OFFICE AS PER PLANS SUBMITTED HEREWITH.commercialBuilding· Clune Construction Co LP$65KFeb 4
- 34 West 32 Street ManhattanExisting eating and drinking establishment seating layout will be revised to include induction units at each table, which are intended solely for warming pre-cooked food and not…commercialBuilding· Honest & Quality Corp$125KFeb 4
- 160 Central Park South ManhattanGeneral alterations to guestroom suite and corridor on portion of 37th floor (called 38th) as per plans filed herewith. No change in use, egress, or occupancy.multifamilyBuilding· Shawmut Woodworking & Sup$1MFeb 4
- 144 West 125 Street ManhattanAddition of non-rated, non-structural, partition in 3rd floor gallery general construction and finishes. No change in use, egress, or occupancy.commercialBuilding· Led Design Inc$85KFeb 4
- 409 Broome Street ManhattanRENOVATION OF EXISTING RETAIL SPACE TO CREATE A CAFE. WORK TO INCLUDE PARTITIONS, CEILING AND FLOORING FINISHES, AND DIFFUSER RELOCATION. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.commercialBuilding· Atlas Supreme Service Inc$263KFeb 4
- 130 Malcolm X Boulevard ManhattanReplacement of existing plumbning piping and pumps as shown on plansmultifamilyPlumbing· Harley Plumb & Heat Inc$1.4MFeb 4
- 130 Malcolm X Boulevard ManhattanReplacement of existing heating hot water circulation pumps, ventilation shaft cleaning and balancing.multifamilyHVAC / Mechanical· C C Controlled Combustion$375KFeb 4
- 9 West 57 Street ManhattanGENERAL CONSTRUCTION TAKING PLACE ON 25TH FLOOR CONSTRUCTION (26TH FLOOR MARKETING) FOR CHANGE OF USE - OFFICE WITH ACCESSORY EXERCISE ROOM AND COMMERCIAL KITCHENcommercialBuilding· JT Magen & Company Inc$33KFeb 4
- 55 Liberty Street ManhattanPLUMBING FIXTURE REPLACEMENT, RELOCATION & INSTALLATION AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, EGRESS OR FIRE PROTECTION.multifamilyPlumbing· WTC PLBG & Heating Corp$50KFeb 4
- 70 East 10 Street ManhattanINTERIOR RENOVATION IN 20H FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.multifamilyBuilding, Plumbing· Levy Interior Corp$182KMar 6
- 641 Fifth Avenue ManhattanRenovate (3) existing bathrooms in apartment #25D. No change in use, egress or occupancy.multifamilyBuilding· Brother K Inc$42KFeb 4
- 720 5 Avenue ManhattanExterior renovation including new stucco cladding, new storefront infills at the first floor, new signage and new structure as per plans filed herewith. No change to use, egress…commercialBuilding· JT Magen & Company Inc$450KFeb 4
- 72 West 126 Street ManhattanAPPLICATION FILED HEREWITH FOR INTERIOR RENOVATIONS AND INCREASE IN NUMBER OF DWELLING UNITS FROM 3 TO 10 WITHIN THE EXISTING BULK OF 3 STORY, BASEMENT AND CELLAR RESIDENTIAL…commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Ab Contracting USA Inc$881KOct 27
- 800 East 14 Street ManhattanUnsafe architectural repairs proposed for Con Edison's East River South Steam station. Repairs proposed as per drawing #s T-001.00, G-001.00, G-002.00, G-003.00, A-101.00,…commercialBuilding· Echostar Construction Inc$617KFeb 6
- 139 East 63 Street ManhattanHEREWITH FILING FOR THE INTERIOR RENOVATION OF ONE APARTMENT IN AN EXISTING 16 STORY, MIXED-USE BUILDING. NO OTHER WORK PROPOSED UNDER THIS APPLICATION.multifamilyBuilding· Redhead Painting$45KFeb 4
- 3736 10 Avenue ManhattanNYCHA Boilers: Dyckman: Building Building4: Mechanical work associated with boiler replacement as per plans filed herewith.multifamilyHVAC / Mechanical· Vital Plumbing Inc$100KFeb 4
- 195 Nagle Avenue ManhattanNYCHA Boilers: Dyckman Building3: Mechanical work in association with Boiler Replacement as per plans filed herewith. No change to use, egress or occupancy.multifamilyHVAC / Mechanical· Vital Plumbing Inc$100KFeb 4
- 3736 10 Avenue ManhattanNYCHA Boiler: Dyckman: Building 4: Architectural work to include Sealant, firestopping, patching, wall repairs in relation to Boiler replacement as per plans filed herewithmultifamilyBuilding· Vital Plumbing Inc$100KFeb 4
- 195 Nagle Avenue ManhattanNYCHA BOILER -Dyckman. Building3: Architectural work to include Sealant, firestopping, patching, wall repairs in rellation to Boiler replacement as per plans filed herewith.multifamilyBuilding· Vital Plumbing Inc$100KFeb 4
- 3736 10 Avenue ManhattanNYCHA BOILERS Dyckman Building 4: : Civil/Site work in relation to boiler replacement as per plans filed herewith.multifamilyBuilding· Vital Plumbing Inc$100KFeb 4
- 195 Nagle Avenue ManhattanNYCHA Boilers Dyckman: Building 3: Site/Civil work as per plans filed herewith. No change to use, egress or occupancy.multifamilyBuilding· Vital Plumbing Inc$100KFeb 4
- 537 West 59 Street ManhattanMechanical filing with Emergency Generator as scope of workcommercialHVAC / Mechanical· Broadway Builders LLC—Feb 4
- 296 West 10 Street ManhattanInterior renovation at Apt 7S with partition, floor, door, and finish changes as per plans. No change in use, egress, or occupancy under this application.multifamilyBuilding· Bluetec Cabinetry LTD$180KFeb 4
- 220 East 72 Street ManhattanMechanical work on 27th Floor and Roof as shown on plans.commercialHVAC / Mechanical· Shannon Contracting LLC$87KFeb 4
- 369 Washington Avenue BrooklynSuspended scaffold installation as per plans filed herewith.multifamily· Pedrol Contracting Inc—Feb 4
- 76 Saint James Place BrooklynSuspended scaffold installation as per plans filed herewith.multifamily· Pedrol Contracting Inc—Feb 4