New York City commercial construction projects
62,207 commercial and multifamily projects from New York City’s building permit records (11,501 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 9, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 414 of 1245
- 65 East 55 Street ManhattanRENOVATION OF EXISTING OFFICE SPACES ON THE 8TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE TO USE, OCCUPANCY, OR EGRESScommercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Par Plumbing Co., Inc$745KMar 9
- 1133 6 Avenue ManhattanStructural work for Steptoe on marketing floors 43,44 & 45 (construction floors 42,43 & 44)commercialBuilding· Clune Construction Co LP$295KMar 3
- 30 East 76 Street ManhattanINTERIOR WORK TO AN EXISTING OFFICE SPACE. REMOVAL OF NON-LOAD BEARING PARTITION WALLS, DOORS, CABINETRY, CARPET FINISH, AND ONE BATHROOM. RELOCATE ONE BATHROOM. PLUMBING WORK…multifamilyBuilding, HVAC / Mechanical, Plumbing· Astoria P & H Corp$148KMar 20
- 75 Rockefeller Plaza Manhattansprinkler modifications on 18th floor as per plans filed herewith. no changes in use, egress or occupancy.commercialFire protection· MJH Energy Consulting Inc$37.5KMar 3
- 200 West 79 Street ManhattanINTERIOR RENOVATION:REMOVAL OF NON-STRUCTURAL PARTITIONS, INSTALLATION OF NEW NON-STRUCTURAL PARTITIONS, NEW DROPPED GB CEILINGS & REPLACEMENT OF INTERIOR LIGHTING THROUGHOUT THE…multifamilyBuilding· South Pacific General$160KMar 3
- 427 Broadway Manhattanmodification of existing sprinkler systems. no change in use to egress or exits under this appliactaion.commercialFire protection· Plumbing Works Corp$25KMar 3
- 101 Central Park West ManhattanGeneral construction work as shown on plansmultifamilyBuilding· Penta Restoration Corp$55.4KMar 3
- 100 Maiden Lane ManhattanSPRINKLER MODIFICATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY.multifamilyFire protection· Go Pro Fire Protection C$35KMar 3
- 40 East 9 Street ManhattanAPPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS AND FINISHES ON THE 4TH FLOOR (APT 4J) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS,…multifamilyBuilding, Plumbing· Authentic PLBG Corp$117KMar 4
- 159 2 Avenue ManhattanTO PROPOSE PLUMBING WORK FOR EXISTING RETAIL SPACE AT 001 FLOOR IN CONJUNCTION WITH GC WORK TYPE M01313871 AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF…multifamilyPlumbing· Amc PLBG, HTG & CLNG, Inc$32.1KMar 3
- 2829 Broadway ManhattanINTERIOR FIT-OUT BANK BULDING SCOPE INCLUDE EXTERIOR BUILDINGCOMPONENTS, INTERIOR SPACES, NEW FINISHESPARTITIONS,MECHANICAL,ELECTRICAL,AND PLUMBING EQUIPMENT.commercialBuilding, HVAC / Mechanical, Plumbing· Custom Commercial Constru$886KMar 9
- 167 East 33 Street ManhattanINTERIOR RENOVATION OF EXISTING EATING & DRINKING ESTABLISHMENT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.multifamilyBuilding· King's USA Group Inc$480KMar 3
- 358 West 45 Street ManhattanFACADE REPAIRS AND WINDOW SEAL REPLACEMENT. NO CHANGE IN USE EGRESS OR OCCUPANCYmultifamilyBuilding· Lema And Sons Corporation$950KMar 3
- 1065 Park Avenue ManhattanRENOVATION OF APT 9B. TO CREATE WALK IN CLOSET AND UPDATE BATHROOM. NO CHANGE TO USE, OCCUPANCY OR EGRESS.multifamilyBuilding, Plumbing· Peter Di Natale & Assoc I$75.3KMar 16
- 740 3 Avenue ManhattanHVAC removals (Early Demo- Package 1) as per plans. No change to use, egress or occupancy.commercialHVAC / Mechanical· New Line Structures & Dev$179KMar 3
- 417 West 44 Street ManhattanINTERIOR RENOVATION AT COMMERCIAL SPACE AT 1ST AND 2ND FLOORS AS PER PLANS FILED HEREWITHmultifamilyBuilding, Plumbing· 2323 Development Corp$149KMar 6
- 750 Third Avenue ManhattanStructural modifications (Early Demo- Package 2) as per plans. No change to use, egress or occupancy.commercialBuilding· New Line Structures & Dev$1.9MMar 3
- 750 Third Avenue ManhattanSlab infill to existing floor opening (Early Demo Package 2) as per plans. No change to the existing building envelope, use, egress or occupancy.commercialBuilding· New Line Structures & Dev$71.8KMar 3
- 245 East 54 Street ManhattanINTERIOR RENOVATION IN APT 20MN FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.multifamilyBuilding, Plumbing· Ivenko Inc$222KMar 12
- 750 Third Avenue ManhattanSelective demolition of interior non-bearing partitions, related finishes, removal and reinstallation of column fireproofing and tenant layouts (Early Demo Package 1) as per…commercialBuilding· New Line Structures & Dev$2.5MMar 3
- 575 Madison Avenue ManhattanGENERAL CONSTRUCTION MODIFICATIONS ON THE 19C/20M FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS OR OCCUPANCY.commercialBuilding, Fire protection, Plumbing· Variant Services Inc$1.7MApr 15
- 345 East 93 Street ManhattanFacade repairs as shown on the drawings filed herewith. No change in use, egress, or occupancy.multifamilyBuilding· Skyline Restoration Inc$117KMar 3
- 603 West 45 Street ManhattanFull demolition to a four story buildingcommercialDemolition, HVAC / Mechanical· Dm80 Solutions LLC$135KApr 21
- 617 11 Avenue ManhattanFull demolition to a two story buildingcommercialDemolition, HVAC / Mechanical· Dm80 Solutions LLC$390KMar 5
- 600 West 116 Street ManhattanFacade repairs. No change in egress, use or occupancy.multifamilyBuilding· Tribute Restoration Inc$2MMar 3
- 251 West 19 Street ManhattanOutriggers system installation for facade repairs, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.multifamilyBuilding· Xinos Construction Corp—Mar 3
- 39 West 27 Street ManhattanINTERIOR REPAIR OF FIRST FLOOR CEILING AT EXISTING FRONT TO ADDRESS VIOLATION 23-00535. INTERIOR RENOVATION OF 1ST FLOOR REMOVE NON-BEARING PARTITION AND UPGRADE THE…commercialBuilding· Dyker Solutions Inc$443KMar 3
- 35 Claremont Avenue ManhattanFacade repairs as shown on drawings submitted herewith for LL11/98 compliance.multifamilyBuilding· New Roc Contracting Corp$106KMar 3
- 234 East 2 Street ManhattanPropose to install mechanical equipment as per plans filed herewith. No change in use egress or occupancy is proposed under this application.multifamilyHVAC / Mechanical· FPS Contracting Inc$50KMar 3
- 114 East 18 Street BrooklynINSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.commercialSolar· Brooklyn Solarworks LLC$75.5KMar 3
- 402 President Street BrooklynMINOR INTERIOR RENOVATION TO INCLUDE NEW PARTITIONS, DOORS, FLOORS, FINISHES, AND REPLACE STAIRS AS PER PLAN. NO CHANGE TO THE BULK, USE, EGRESS, AND OCCUPANCY UNDER THIS…multifamilyBuilding· Lian Construction Group L$40KMar 3
- 8422 13 Avenue BrooklynRENOVATION OF EXISTING APARTMENT #1R ON 1ST FLOOR WITH GENERAL CONSTRUCTION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.multifamilyBuilding· Robert Michael Design & C$48KMar 3
- 9323 Shore Road BrooklynINTERIOR RENOVATIONS OF UNITS 1D, 2H, 3M AND 6A ON THE 1ST, 2ND, 3RD, AND 6TH FLOORS. WORK INCLUDES NEW NON-STRUCTURAL INTERIOR PARTITIONS, REPLACEMENT OF PLUMBING FIXTURES, AND…multifamilyBuilding, Plumbing· Vaggelas Construction GR$267KOct 28
- 9323 Shore Road BrooklynINTERIOR RENOVATIONS OF SUB-CELLAR AND CELLAR COMMON AREAS INCLUDING NEW INTERIOR COMMUNICATING STAIR, NEW INTERIOR NON-STRUCTURAL PARTITIONS AND FINISHES, AND REPLACEMENT OF…multifamilyBuilding, Plumbing· Vaggelas Construction GR$275KSep 28
- 445 Albee Square West BrooklynApplication filed for interior renovation of existing restaurant space. No change to use, egress, or occupancy.multifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· Iddc LLC$675KMar 19
- 390 Court Street BrooklynGeneral construction associated with renovations to existing apartments on the 3rd fl. No change in occupancy, use or egress.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Harrow NY Inc$361KJul 14
- 25 Elm Place BrooklynINSTALL PERMANENT STEEL SHORING FOR ONE-STORY SETBACK AND RETAINING WALLS AS INDICATEDON DRAWINGS.commercialBuilding· Vici Interiors Inc$125KMar 3
- 869 57 Street BrooklynPROPOSED CONVERT EXISTING ADULT DAY CARE USE ON PARTIAL FIRST FLOOR TO COMMUNITY CENTER, OBTAIN NEW C/O. NO CHANGE IN EGRESS, NO WORK ON OTHER FLOORS.multifamilyBuilding· Winway Development LLC$60KMar 3
- 19 Clay Street BrooklynTO FILE FOR A TEMORARY STRUCTURE IN THE OPEN SPACE TO DO SITE WORK. NO CHANGE IN USE, OCCUPANCY OR EGRESS.commercialBuilding· Onng Inc$260KMar 3
- 247 Smith Street BrooklynINTER. RENOV. OF EXTG. COMMERCIAL SPACE: REMOVAL OF GWB, FLR, CLG & WALL FINISHES & LIGHT FIXTS. INSTALL NEW GWB, FLR, CLG & WALL FINISHES. INSTALL REPLACEMENT LIGHT FIXTS. NO…multifamilyBuilding· NYC Painting Contracting$65KMar 3
- 2101 West 12 Street BrooklynINTERIOR/EXTERIOR RENOVATIONS AS PER LANS FILED HEREIWHT NO CJANGE IN USE, EGRESS OR OCCUPANCY.commercialBuilding· Tishman Interiors Corp$197KMar 3
- 95 Prospect Park West BrooklynLOWER VALE-EXTERIOR LANDSCAPING/SITEWORK IMPROVEMENTS AT PROSPECT PARK-VALE OF CASHMERE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. INSTALL LOW PICKET FENCE, PAVERS, RESTORE…commercialBuilding, Plumbing· Galvin Brothers Inc$6.7MAug 27
- 773 Neptune Avenue BrooklynSuperstructure in conjunction with NB.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Rybak Development Corp—Aug 4
- 1248 White Plains Road BronxPROPOSED NEW BUILDING FOR A HOUSE OF WORSHIP AND ACCESORIEScommercialBuilding· HF Contracting Corp$3.7MMar 3
- 30 Richman Plaza BronxEmergency Suspended scaffold installation as per plans filed herewith.multifamily· Esg Inc—Mar 2
- 3410 De Reimer Avenue BronxSuspended scaffold in order to perform exterior facade repairs and close-up inspections. Sidewalk shed filed under separate application. No change in use, occupancy or egress…multifamilyBuilding· Sha Home Improvement Inc—Mar 2
- 943 Teller Avenue BronxINSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.multifamilySolar· American Solar Partners,$135KMar 2
- 1825 Eastchester Road BronxWEILER - Selective removal of existing ceiling systems throughout various areas of the hospital to allow for the installation of new sprinkler piping, sprinkler heads, and…commercialBuilding· Turner Construction Compa$7.4MMar 2
- 2455 Bathgate Avenue BronxHEREWITH FILING MECHANICAL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCYcommercialBuilding, HVAC / Mechanical, Plumbing· Glynn Group LLC$514KJun 4
- 1309 Castle Hill Avenue BronxMinor renovation to existing bank branch including partial removal of non-load bearing, new partition work, new lighting at ceiling and associated finish work. No change in use,…commercialBuilding· BNF Contractors Inc$62.4KMar 2