62,207 commercial and multifamily projects from New York City’s building permit records (11,501 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 9, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 394 of 1245
- 283 Nelson Avenue Staten IslandINSTALLATION OF BESS UNITS ,ESS TAXcommercialBuilding· Gi Endurant LLC$400KMar 13
- 200 Huguenot Avenue Staten IslandREPLACEMENT OF WINDOWS THROUGHT OUT AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialBuilding· Maximum Contracting Inc$50KMar 13
- 57 Cedar Grove Avenue Staten IslandModification to existing Verizon site on roof. Replace 4 antennas and 4 RRH units. Remove 1 equipment cabinet. Install 2 new antennas and 2 new equipment cabinets. No change in…multifamilyRoofing· Rc3 Electric, LLC$34.5KMar 13
- 1221 Forest Hill Road Staten IslandINSTALLATION OF SPRINKLER SYSTEM FOR ENTIRE BUILDING IN CONJUNCTION WITH APPLICATION #S00882049. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyFire protection, Plumbing· Rom Piping & HTG Inc$134KMar 13
- 220-18 Horace Harding Expressway QueensRenovate existing 1st floor retail store for a new Buffalo Wild Wing-Go eating & drinking establishment. Install interior wall, finishes, flooring, ceiling, hvac system & kitchen…commercialBuilding, HVAC / Mechanical, Plumbing· All American Construction$283KMar 26
- 37-05 79 Street QueensHEREBY FILING THIS APPLICATION TO PROPOSE A NEW LAUNDRY ROOM LOCATED IN THE CELLAR AS AN ACCESSORY USE TO THE BUILDING AS PER PLANS SUBMITTED. THIS APP DOES NOT REQUIRE A NEW OR…multifamilyHVAC / Mechanical, Plumbing· Advanced Plumbing Mech$28KApr 9
- 42-01 Queens Boulevard QueensTHE PURPOSE OF THIS FILING IS TO REFURBISH EXISTING 1ST FLOOR COMMERCIAL SPACE AS PER DRAWINGS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.multifamilyHVAC / Mechanical· LV Contracting Solutions$70KMar 13
- 48-27 40 Street QueensALT-1 FILED TO PARTIAL RENOVATION TO EXISTING 2-FAMILY DWELLING AND OBTAIN NEW CERTIFICATE OF OCCUPANCYmultifamilyBuilding, Plumbing· JMW Plumbing, Inc$132KMay 27
- 56-65 Rust Street QueensFiling to create a new opening in the existing building wall with some minor interior renovation. No change to use, egress or occupancycommercialBuilding· New V&B Power Corp$304KMar 13
- 141-15 78 Avenue Queensgeneral construction interior demising walls, partitions, toilet room, doors, ceiling, light fixtures for tenant space #6 (77-39 Vleigh Place)multifamilyBuilding, HVAC / Mechanical, Plumbing· QBH Construction Corp$140KMar 13
- 59-06 Laurel Hill Boulevard QueensReplacement of personnel doors and the upgrade of overhead garage door controls and the replacement and installation of new windows in designated areas as per plans filed herewith.commercialBuilding· Boilermatic Welding Indus$300KMar 13
- 71-63 161 Street QueensSUB-SEQUENCE FILE BOILER APPLICATION FOR PLUMBING JOB # Q00863714.multifamilyHVAC / Mechanical· Amc PLBG, HTG & CLNG, Inc$96KApr 6
- 65-20 Parsons Boulevard QueensApplication to be reviewed with the Development HUB. Site Yard work and new 8'-0 high aluminum fence as per plans filed herewith. No change to use, egress or occupancy.multifamilyBuilding· JCC Construction Corp$3.4MMar 13
- 48-53 38 Street QueensProposed 3-Story, 3-Family, Residential Building with Two Parking Spaces Carport at Cellar and One Parking Space.multifamilyBuilding· United Industries & Const$1.5MMar 13
- 250 West 103 Street ManhattanInstallation of suspended scaffold for facade inspection/repair.multifamilyBuilding· A W R Group Inc—Mar 13
- 200 East 94 Street ManhattanInstallation of IRA during facade inspection.multifamily· JC Santana Contracting Co—Mar 13
- 1851 3 Avenue ManhattanINSTALLATION OF SUSPENDED SCAFFOLD AND MATERIAL HOIST FOR FACADE REPAIRS AND FACADE INSPECTION. SUSPENDED SCAFFOLD AND MATERIAL HOIST SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC…multifamilyBuilding· Zoria Housing LLC—Mar 13
- 536 Broadway ManhattanInstallation of suspended scaffold for facade work or inspectioncommercial· Skyline Restoration Inc—Mar 13
- 245 Park Avenue ManhattanModifications to the existing HVAC system on the 1st floor (Property Management Office) as per plans. No change to use, egress or occupancy.commercialHVAC / Mechanical· JT Magen & Company Inc$150KMar 13
- 22 East 49 Street ManhattanInterior demolition of non-load-bearing partitions and furniture; no change to use, egress, occupancy, or bulk.commercialBuilding· Marick Contracting Corp$33.4KMar 13
- 260 West End Avenue ManhattanInspection and Facade RepairsmultifamilyBuilding· Brend Restoration LLC—Mar 13
- 399 Park Avenue ManhattanInterior renovation as per plans filed herewith.commercialBuilding· JRM Construction MGMT LLC$1.7MMar 13
- 148 Duane Street ManhattanPlumbing worktype in conjunction with Alt I application 122193223. NEW GAS / ELECTRIC / INDIRECT WATER HEATER, NEW SANITARY / STORM HOUSE TRAP, NEW PLUMBING INFRASTRUCTURE, NEW…multifamilyFire protection, Plumbing· Ap Plumbing & HVAC LLC$250KApr 2
- 393 5 Avenue ManhattanInterior renovations to the existing office space including removal and installation of non-load bearing partitions and related finishes. No change in use, egress or occupancy.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· I & G Group, Inc$500KOct 20
- 401 5 Avenue ManhattanInterior renovations to the existing office space including removal and installation of non-load bearing partitions and related finishes. No change in use, egress or occupancy.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· I & G Group, Inc$500KOct 21
- 45 East 20 Street ManhattanINSTALLATION OF NEW PANTRY FIXTURES AND RELOCATION OF SPRINKLER HEADS FOR A NEW OFFICEcommercialFire protection· J. Caiazzo PLBG & HTG Cor$48.5KMar 13
- 44 East 32 Street ManhattanINTERIOR RENOVATION AT 4TH, 5TH AND 6TH FLOOR INCLUDING INSTALLATION OF CONVENIENCE STAIR BETWEEN FLOORS 4 AND 5 FLOOR, REMOVING AND INSTALLING NEW INTERIOR NON-LOAD BEARING…commercialBuilding· Harrow NY Inc$175KMar 13
- 345 7 Avenue ManhattanAPPLICATION FILE TO INTERIOR RENOVATION EXIST. STORE AS REMOVE &REMOVE MINOR PARTITION, CEILING, FLOOR TILES AT 1st FLOOR FOR HAAGEN-DAZS ICE CREAM STORE AS PER PLAN. PLUMBING…commercialBuilding, Plumbing· Khawaja Restoration Inc$32.6KMar 20
- 450 West 42 Street ManhattanRenovation of Elevator Lobbies. No change to Use, Occupancy, or Egress.multifamilyBuilding· Aventador Construction In$150KMar 13
- 2 West 130 Street ManhattanDECOMMISSION OF EXISTING TMO SITE REMOVE EQUIPMENT PLATFORM AND DUNNAGE, 9 ANTENNAS, 6 RRH FROM ROOF. REMOVE CABLES FROM CELLAR, FACADE AND ROOF. NO CHANGE IN USE, EGRESS OR…multifamilyRoofing· Watch Hill Wireless Solu$67KMar 13
- 31 West 52 Street ManhattanModifications to the existing plumbing system on the floors 11 through 15 (CWNY) as per plans. No change to use, egress or occupancycommercialPlumbing· Preferred Mechanical Inc$1.1MMar 13
- 114 East 72 Street ManhattanFiling herewith for the renovation to existing residential unit #2/3B as per plans. There is no change to use, egress, or occupancymultifamilyBuilding, Plumbing· Sami Construction & Remod$300KMar 30
- 280 Park Avenue ManhattanAddition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy.commercialHVAC / Mechanical· JT Magen & Company Inc$1.8MMar 13
- 140 West Street ManhattanFILED IN CONJUNCTION WITH PAA DOC. 23 TO ALT1 JOB NO. 121830439 AND CHANGE OF USE ON CELLAR AND SUB CELLAR FROM MERCANTILE TO HEALTH & FITNESS ASSEMBLY; PARTIAL DEMOLTION AND…multifamilyBuilding· Volk Industrial Services$60KMar 13
- 545 West 125 Street ManhattanDECOMMISSION OF EXISTING TMO SITE. REMOVE EQUIPMENT PLATFORM, AND DUNNAGE 12 ANTENNAS, 6 RRH, AND 1 GPS FROM ROOF. REMOVE CABLES FROM BASEMENT FACADE AND ROOF. NO CHANGE IN USE,…multifamilyRoofing· Squan Construction Servic$71KMar 13
- 1185 Avenue Of The Americas ManhattanModifications and minor interior demolition of the existing HVAC system, including removals of ducts and piping on Floors 9, 34, 35, 37, as per plans. No change to use, egress,…commercialHVAC / Mechanical· Concept Construction Serv$99.7KMar 13
- 1185 Avenue Of The Americas ManhattanMinor interior demolition of existing office space including interior partitions, doors, suspended ceilings on Floors 9, 34, 35, 37, as per plans. No change to use, egress, or…commercialBuilding· Concept Construction Serv$800KMar 13
- 800 Third Avenue ManhattanInterior demo of non load bearing partitions, walls, doors, frames, ceiling and finishes as indicated on plans.commercialBuilding· Versatile Services LLC$60KMar 13
- 111 Eighth Avenue ManhattanNEW ELECTRICAL ROUTING FOR FUTURE KITCHEN AREAS. NEW PIPING CONNECTIONS TO BE MADE ON UPPER FLOORS WITHIN THE BUILDING, UNDER SEPERATE APPLICATION. THERE IS NO CHANGE IN USE,…commercialBuilding· Structure Tone, LLC$120KMar 13
- 345 Hudson Street ManhattanADDITION OF NEW MER EQUIPMENT FOR PER ROOM AS PER PLANScommercialBuilding· Cross Management Corp$200KMar 13
- 345 Hudson Street Manhattaninstall new whsp supporting heating and future tenant cooling and install hydronic heating system as per planscommercialHVAC / Mechanical· Cross Management Corp$1.5MMar 13
- 1411 Broadway ManhattanFiling herewith plumbing work to existing 7th floor space. No change in use, egress or occupancy.commercialPlumbing· Geoffrey A. Lagas & Assoc$68.1KMar 13
- 223 East 14 Street ManhattanTO PROPOSE INTERIOR RENOVATION FOR EXISTING STORE AT 001 FLOOR WITH GENERAL CONSTRUCTION AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.multifamilyBuilding, Plumbing· Kale Construction Inc$74.1KMay 18
- 9 Times Square ManhattanDISMANTLE & REMOVE EXISTING WALL STRUCTURE AND ASSOCIATED SIGNS AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialBuilding· North Shore Neon Sign LLC$75KMar 13
- 175 West 87 Street ManhattanRemoval of interior CMU wall for APTmultifamilyBuilding· Expert CM NY Inc$717KMar 13
- 1 Centre Street ManhattanSprinkler work as shown on plans submitted herewith. No changes to use occupancy or egress as of right.commercialFire protection· WDF Inc$115KMar 13
- 1 Centre Street ManhattanPlumbing work as shown on plans submitted herewith. No change to use, occupancy or egress as of right.commercialPlumbing· WDF Inc$185KMar 13
- 1 Centre Street ManhattanHVAC WORK AS SHOWN ON PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGREES, OR OCCUPANCY AS OF RIGHT.commercialHVAC / Mechanical· Awl Industries Inc$362KMar 13
- 1 Centre Street ManhattanStructural Work as shown on plans submitted herewith. No change to use, egress or occupancy as of right.commercialBuilding· Contract & Hospitality$92KMar 13
- 1 Centre Street ManhattanINTERIOR RENOVATION AND CONVERSION OF OFFICE SPACE TO DAYCARE FACILITY. INSTALLATION OF NON-LOAD BEARING PARTITIONS, NEW FINISHES, NEW DOORS. INSTALLATION OF ASSOCIATED…commercialBuilding· Contract & Hospitality$1.5MMar 13