New York City commercial construction projects
62,207 commercial and multifamily projects from New York City’s building permit records (11,501 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 9, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 384 of 1245
- 28-44 31 Street QueensDUE TO NEW TENANT EXISTING INTERIOR RENOVATIONWORK INCLUDING KITCHEN SETUP REPAIR WORK WILL TAKEPLACE AT 1ST FLOOR. NO CHANGE USE EGRESS OROCCUPANCY, SUBSEQUENT PLUMBING JOBS…multifamilyBuilding, Plumbing· Ark Design & Build Inc$54KMar 25
- 42-03 35 Street QueensINTERIOR RENOVATION OF EXISTING OFFICE SPACE AT 1ST FLOOR & EXTERIOR FACADE REPAIR AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialBuilding, Plumbing· LNM Construction LLC$1.7MApr 24
- 148-27 Liberty Avenue QueensPropose to remove kiosk, canopy and footing. No change to use, egress or occupancy.commercialBuilding· Gemstar Construction Corp$25KMar 19
- 148-27 Liberty Avenue QueensPropose to remove former (5) 4,000 gallon & (1) 600 gallon underground tanks. No change in use, egress or occupancy.commercialBuilding· Gemstar Construction Corp$133KMar 19
- 43-17 49 Street QueensFACADE RENOVATION AND REPAIR AS PER PLANS FILED HEREWITH.multifamilyBuilding· Boulis Construction Corp$34.5KMar 19
- 123-26 135 Street QueensPROPOSED PLUMBING WORK IN CONJUNCTION WITH NB#Q01286676.commercialPlumbing· Bt's Plumbing And Heating$29.5KMar 19
- 70-38 72 Place QueensMINOR INTERIOR RENOVATIONS IN EXISTING CELLAR, REMOVE & LEGALIZE PARTITIONS AS NEEDED; AND RESOLVE VIOLATIONS. EXISTING TOILET TO BE LEGALIZED. ASSOCIATED PLUMBING WORK TO BE…multifamilyBuilding, Plumbing· 3gs Construction LLC$65KMar 26
- 214-33 35 Avenue QueensREPURPOSING EXISTING SPACES, NECESSITATING ADA UPGRADES ON PATHS OF TRAVEL & AUDITORIUM, UPGRADE WATER SERVICES INSTALLATIONS, PROVIDE ASSISTIVE LISTENING SYSTEM, UPGRADE LOW…commercialBuilding, HVAC / Mechanical, Plumbing· CVM Construction Corp$1.9MAug 31
- 6 Claremont Avenue ManhattanFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolacommercial· Structual Presv System—Mar 19
- 232 Sherman Avenue ManhattanINSTALLATION OF OUTRIGGER AND MATERIAL HOIST FOR THE FACADE REPAIR WORK ASPER PLAN SUBMITTED.multifamilyBuilding· Apex Group NY Corp—Mar 19
- 381 Park Avenue South ManhattanFILING PL FOR INSTALLATION OF NEW PLUMBING FIXTUREScommercialPlumbing· PFL Mechanical Corp$35KMar 19
- 250 Park Avenue ManhattanIRA Rope Access Facade Inspectioncommercial· Superstars Contracting In—Mar 19
- 312 East 95 Street ManhattanInstallation of suspended scaffold for facade work or inspection.commercial· Skyline Restoration Inc—Mar 19
- 235 East 9 Street ManhattanBOILER AND BURNER REPLACEMENT .multifamilyHVAC / Mechanical· A. HTG And PLBG Works Inc$165KMar 19
- 218 West 50 Street ManhattanFacade Inspection via Industrial Rope Access as shown on planscommercial· M & L Signs, Inc—Mar 19
- 1 Fifth Avenue ManhattanINSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT.multifamily· Central Construction MGMT—Mar 19
- 575 West End Avenue ManhattanINSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT.multifamily· Central Construction MGMT—Mar 19
- 215 West 125 Street ManhattanINTERIOR DEMOLITION OF NON-LOADING PARTITIONS ON THE 3RD FLOOR OFFICE SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialBuilding, Fire protection· Bern Companies Inc$498KMay 7
- 611 Broadway ManhattanPLUMBING MODIFICATIONS TAKING PLACE ON 1ST AND 2ND FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialPlumbing· Fulton PLBG & HTG Corp$26.7KMar 19
- 537 West 121 Street ManhattanFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolacommercial· Structural Preservation S—Mar 19
- 150 Fifth Avenue ManhattanMinor demolition with installation of new partitions on the 1st floor (Security Office Expansion) as per plans. No change to Use, Egress or Occupancy.commercialBuilding· FMG General Contracting$26.7KMar 19
- 225 West 34 Street ManhattanAPPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 15TH FLOOR (TECHNO) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS,…commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Darby Construction SVC LL$510KMar 20
- 350 Fifth Avenue ManhattanMECHANICAL WORK IN THE CELLAR (Concourse marketing floor), 1ST AND 2ND FLOOR AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialHVAC / Mechanical· J. Phelan Construction Co$100KMar 19
- 30 Rockefeller Plaza ManhattanSuspended Scaffold for Facade Restoration as Shown on Planscommercial· Pullman SST Inc—Mar 19
- 399 Park Avenue ManhattanModification to Mechanical systems as per plans filed herewith.commercialHVAC / Mechanical· JRM Construction MGMT LLC$159KMar 19
- 350 Fifth Avenue ManhattanMECHANICAL WORK ON THE 3RD FLOOR AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialHVAC / Mechanical· James E Fitzgerald Inc$922KMar 19
- 350 Fifth Avenue ManhattanGENERAL CONSTRUCTION ON THE 3rd FLOOR AS PLANS FILED FOR HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialBuilding· James E Fitzgerald Inc$4.9MMar 19
- 11 Greene Street ManhattanINSTALLATION OF ONE SPLIT HEAT PUMP SYSTEM AC UNITS FOR 1ST FLOOR COMMERICAL SPACE.multifamilyHVAC / Mechanical· Countrywide Home Improvem$30KMar 19
- 350 Fifth Avenue ManhattanMechanical work from the 56th to the 58th floor as plans filed herewith. No change in use, egress or occupancy.commercialHVAC / Mechanical· Reidy Contracting Group$210KMar 19
- 350 Fifth Avenue ManhattanGeneral construction from the 56 thru the 58th floor as plans filed herewith. No change in use, egress, or occupancy.commercialBuilding· Reidy Contracting Group$5.9MMar 19
- 26 West 67 Street ManhattanINTERIOR DEMOLITION IN PREPARATION FOR FULL DEMOLITION OF 14-STORY COMMERCIAL BUILDINGcommercialBuilding, HVAC / Mechanical· Titan Industrial SVC Corp$455KJun 18
- 277 Park Avenue ManhattanNew Sink/hwh, SP modificationcommercialFire protection· Sirina Fire Prot Corp$40KMar 23
- 730 Fifth Avenue ManhattanSprinkler modifications taking place on the 3rd floor as per plans filed herewith. No change in use, egress or occupancy._multifamilyFire protection· Metro Fire Prot HLDG Corp$50KMar 19
- 730 Fifth Avenue ManhattanPlumbing modifications taking place on the 3rd floor as per plans filed here with. no change in use, egress or occupancy.multifamilyPlumbing· A Plus Plumbing Corp$110KMar 19
- 401 West 31 Street ManhattanGeneral construction works as shown on plans filed herewith. No Change in use, egress, or occupancy.commercialBuilding, HVAC / Mechanical· Structure Tone, LLC$610KMar 19
- 1500 Broadway ManhattanMinor Interior Demolition on Cellar,1-5 floors as per plans. No change to use, egress or occupancy.commercialBuilding· Cauldwell Wingate Co LLC$335KMar 19
- 299 Broadway ManhattanINTERIOR RENO OF EXISTING OFFICE SPACE ON 17TH FL AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialBuilding· Interior Building Service$300KMar 19
- 65 East 55 Street ManhattanSprinkler modifications to take place on the 25th floor as shown on plans submitted herewith. No change in use, egress or occupancy.commercialFire protection· Preferred Spklr And Mech$160KMar 19
- 538 West 150 Street ManhattanOil to gas conversion for heat. Repair gas piping due to a gas shutdown. Install (1) gas water heater and (1) Steam boiler.multifamilyHVAC / Mechanical, Plumbing· Junior Carter Mech. Corp$28KAug 7
- 595 Madison Avenue ManhattanMechanical work on the 10th floor (Dublin & Co.) as indicated on drawingscommercialHVAC / Mechanical· JT Magen & Company Inc$300KMar 19
- 215 East 23 Street ManhattanREPLACE (2) GAS FIRED BOILERScommercialHVAC / Mechanical, Plumbing· Bell Fuel Oil, LLC$60KMar 19
- 450 West 33 Street ManhattanGeneral Construction as shown on plans filed herewith. No change to use, egress or occupancy.commercialBuilding, Fire protection· Structure Tone, LLC$126KMar 19
- 200 East 63 Street ManhattanInterior Renovation of existing apartment 1F. Under this application, there is no change of use, egress, or occupancy.multifamilyBuilding· NY Best Painting Corp$50.4KMar 19
- 305 West 98 Street ManhattanKITCHEN, BATHROOM AND ONE BEDROOM INTERIOR RENOVATION OF APT. #5F. NO CHANGE OF USE, EGRESS OR OCCUPANCY.multifamilyBuilding, Plumbing· Nice Plumbing Corp$35KMar 25
- 650 West 168 Street ManhattanApplication filed for Roof Replacement as per plan herewith. No change in use, egress or occupancy.commercialBuilding· The Grenadier Corporation$623KAug 7
- 1880 Broadway ManhattanAT SUBCELLAR, INSTALLATION OF NEW AC UNITS AND ASSOCIATED DUCTWORK AND PIPING, SUPPLEMENTAL AC UNIT TO SERVE IT ROOM, AND NEW OUTSIDE AIR AND EXHAUST FANS AS PER PLANS FILED…multifamilyHVAC / Mechanical· JRM Construction MGMT LLC$1.3MMar 19
- 1880 Broadway ManhattanAT SUBCELLAR, REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS, CEILINGS, FINISHES, MILLWORK, AND INTERIOR CONVENIENCE STAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE,…multifamilyBuilding· JRM Construction MGMT LLC$3.1MMar 19
- 1425 Madison Avenue ManhattanMECHANICAL MODIFICATIONS TO INCLUDE REMOVAL OF EXISTING DUCTWORK AND ADDITION OF NEW DUCTWORK.commercialFire protection, HVAC / Mechanical, Plumbing· J & N Remodeling Inc$256KApr 9
- 249 East 30 Street ManhattanInstallation of outrigger for facade repair & inspection.multifamilyBuilding· Rapid Masonry Rest. Corp—Mar 19
- 315 West 106 Street ManhattanMINOR INTERIOR RENOVATION AT APT 10B INCLUDING PARTITIONS, CABINETS, FIXTURES AND FINISHES. NO CHANGE TO BUILDING OCCUPANCY, EGRESS OR FLOOR AREA.multifamilyBuilding· JSD Construction Group In$60KMar 19