New York City commercial construction projects
62,207 commercial and multifamily projects from New York City’s building permit records (11,501 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 9, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 360 of 1245
- 153 2 Avenue ManhattanINTERIOR ALTERATIONS TO EXISTING GROUND FLOOR COMMERCIAL SPACE. NO CHANGE TO USE, OCCUPANCY OR EGRESSmultifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· Skyland Development Corp$295KMay 29
- 120 East 87 Street ManhattanStructural slab repairs and associated framing on 3nd floor as per plans filed herewith. No changes in use, egress or occupancy.multifamilyBuilding· Lakewood Group Corp$125KApr 2
- 75 Rockefeller Plaza Manhattanmechanical modifications on 11th floor as per plans filed herewith. no changes in use, egress or occupancy.commercialHVAC / Mechanical· JT Magen & Company Inc$123KApr 2
- 75 Rockefeller Plaza Manhattangeneral construction on the 11th floor as per plans filed herewith. no changes in use, egress or occupancy.commercialBuilding· JT Magen & Company Inc$1.1MApr 2
- 330 West 34 Street ManhattanSprinkler changes on the 7th, 8th & 9th floors as indicated on drawings.commercialFire protection· Psi Partners, LLC$557KApr 2
- 330 West 34 Street ManhattanMechanical changes on the 7th, 8th and 9th floors as indicated on drawings.commercialHVAC / Mechanical· Icon Interiors Inc$4.2MApr 2
- 42 Broadway ManhattanProvide new sprinkler heads for existing system in office space in conjunction with Alt #M01367407 as per plans filedcommercialFire protection· Firequest Corp$28KApr 2
- 250 Vesey Street ManhattanStructural work as shown on plans filed herewith.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Structure Tone, LLC$4.1MApr 14
- 66 Hudson Boulevard ManhattanHereby filing to construct interior partitions, ceilings and doors for tenant and elevator lobby build out as shown on plans filed herewith. NO change to use, occupancy or egress.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Sean Coakley P & H Inc$3.2MApr 2
- 133 East 58 Street ManhattanBRICK REPLACEMENT, LINTEL REPLACEMENT, PARAPET REBUILDING, BRICK CORNER REBUILDING, STEEL REINFORCEMENT, TERRA COTTA REPLACEMENT, GUARD RAIL AND RAILING INSTALLATION AT THE…commercialBuilding· Rally Restoration Corp$185KApr 2
- 240 East 38 Street ManhattanNYULH - ambulatory care centre Sprinkler renovation - Sprinkler modifications as shown on plans filed herewith. No change in egress, occupancy, or use.commercialFire protection· NYC Fire Sprinkler Corp$215KApr 2
- 1301 Avenue Of The Americas ManhattanMinor demolition with installation of new partitions on the 34th floor as per plans. No change to Use, Egress or Occupancy.commercialBuilding· JT Magen & Company Inc$3.5MApr 2
- 375 Park Avenue ManhattanINTERIOR RENOVAITION ON 27TH FLOOR OFFICE SPACE AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Tri-Star Construction Cor$677KMay 19
- 14 Wall Street ManhattanNON-ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN APPROVED AS PER NYC LANDMARK PRESERVATION COMMISSION DOCKET# 26-05161 - NY GIFTS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.commercialSigns· L.S. Sign Co., Inc—Apr 2
- 350 Fifth Avenue ManhattanPLUMBING WORK IN THE CELLAR (Concourse Marketing floor), 1ST AND 2ND FLOOR AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialPlumbing· A&A Plumbing Corp$50KApr 2
- 250 Park Avenue South ManhattanMechanical work as shown on plans filed herewith. No change in use, egress, or occupancy.commercialHVAC / Mechanical· Comfort Zone Mechanical$400KApr 2
- 88 Pine Street ManhattanInstall walls, doors, floor finishes and ceilings per planscommercialBuilding, Fire protection, HVAC / Mechanical· J. Lyons Contracting Inc$207KSep 14
- 132 West 31 Street ManhattanModifications to the existing HVAC system on the 8th floor (HITT - Office Buildout) as per plans. No change to use, egress or occupancycommercialHVAC / Mechanical· Americon Construction Inc$450KApr 2
- 11 Madison Avenue ManhattanModifications to existing HVAC System as per plans filed herewith. No change in use, egress, or occupancy.commercialHVAC / Mechanical· Structure Tone, LLC$149KApr 2
- 680 Broadway ManhattanPROPOSE TO CHANGE USE FOR RESIDENTIAL UNITS ON FLOORS 2 & 3, COMBINE UNITS TO MAKE SINGLLE UNITS ON FLOOR, AND REMOVE DUPLEX UNITmultifamilyBuilding, Plumbing· Bletsas P&H Corp$121KMay 27
- 50 Lexington Avenue ManhattanINTERIOR DEMOLITION OF THE EXISTING NON-BEARING WALLS AND PARTITIONS IN THE EXISTING 1ST FLOOR COMMERCIAL SPACE.multifamilyBuilding· Mo Contracting Inc$50KApr 2
- 192 6 Avenue ManhattanPROPOSED INTERIOR RENOVATION APT UNIT 6F .NO CHANGE TO USE, EGRESS OR OCCUPANCY.multifamilyBuilding, Plumbing· American Standard P&H Cor$56KApr 6
- 237 Lafayette Street ManhattanREMOVAL AND INSTALLATION OF INTERIOR PARTITIONS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.multifamilyBuilding· Think Construction LLC$100KApr 2
- 309 West 86 Street ManhattanApplication filed for interior renovation of apartment 11A including partitions, new shower, and new finishes. No change to use, egress, or occupancy under this application.multifamilyBuilding, Plumbing· Trojan Interiors Inc$39.9KApr 23
- 42 Broadway ManhattanProvide new sprinkler heads on existing sprinkler system for office space in conjunction with Alt #M01355130 as per plans filedcommercialFire protection· Firequest Corp$155KApr 2
- 975 Park Avenue ManhattanPERFORM INTERIOR PARTITION, HUNG CEILING DEMOLITION & CONSTRUCTION IN CONJUNCTION WITH APARTMENT RENOVATION #6A. REPLACE EXISTING PTAC UNITS IN SAME LOCATION AND CONVECTOR…multifamilyBuilding, Plumbing· Hibernia Construction Cor$144KApr 10
- 27 King Street ManhattanINSTALL REPLACEMENT BOILER/BURNER UNIT AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.multifamilyHVAC / Mechanical, Plumbing· Alklem Plumbing Inc$315KApr 20
- 2 Penn Plaza ManhattanMechanical work on the 17th floor (corridor/lobby/boardroom) as indicated on drawings.commercialHVAC / Mechanical· John Gallin & Son, Inc$89KApr 2
- 1880 Broadway ManhattanAT SUBCELLAR, INSTALLATION OF NEW PLUMBING FIXTURES AND ALL ASSOCIATED PIPING, NEW ELECTRIC WATER HEATER AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPNACY, OR EGRESS UNDER…multifamilyPlumbing· A Plus Plumbing Corp$364KApr 2
- 1880 Broadway ManhattanAT CELLAR AND 1ST FLOOR, INSTALLATION OF NEW SPRINKLER HEADS AND RELATED PIPING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPNACY, OR EGRESS UNDER THIS APPLICATION.multifamilyFire protection· A Plus Plumbing Corp$156KApr 2
- 1880 Broadway ManhattanAT CELLAR AND 1ST FLOOR, INSTALLATION OF NEW PLUMBING FIXTURES AND ALL ASSOCIATED PIPING, NEW ELECTRIC WATER HEATER AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPNACY, OR…multifamilyPlumbing· A Plus Plumbing Corp$546KApr 2
- 108 East 81 Street ManhattanRigging for Industrial Rope Accessmultifamily· Cerina General Contr. Inc—Apr 2
- 20 Sutton Place South ManhattanRENOVATION OF FIRST FL. LOBBY MAILROOM, AND OFFICE. WORK INCLUDES REMOVAL AND INSTALLATION OF PARTITIONS, DOORS, FINISHES, AND CONCIERGE DESK. NO CHANGE TO USE, EGRESS, OR…multifamilyBuilding· A101 Construction+design$154KApr 2
- 126 West 22 Street ManhattanHEREBY FILING FOR THE INTERIOR RENOVATION OF EXISTING APARTMENT 5N LOCATED ON THE FIFTH FLOOR. NO CHANGE TO USE OCCUPANCY OR EGRESS.multifamilyBuilding, Plumbing· O'malley Interiors Inc$402KApr 3
- 11 Charlton Street ManhattanROOF REPLACEMENT AS PER PLANS FILED HEREWITH, NO CHANGE TO USE, EGRESS OR OCCUPANCYmultifamilyBuilding· Jerrick Associates Inc$203KApr 2
- 360 West 22 Street ManhattanFacade Repairs and Roofing Membrane Replacement. No change in use, egress, or occupancy.multifamilyBuilding· Xinos Construction Corp$794KApr 2
- 15 West 12 Street ManhattanMINOR PARTITIONS INSTALLATION IN APT#6E ON THE 6TH FLOOR, AND FINISHES AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding, Plumbing· Bohemia J&P LLC$71KApr 24
- 420 East 72 Street ManhattanINTERIOR RENOVATION OF APARTMENT 11-J ON 11TH FLOOR AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE OF USE EGRESS OR OCCUPANCY.multifamilyBuilding, Plumbing· STM Interiors LLC$235KMay 5
- 60 East 42 Street ManhattanPLUMBING WORK TAKING PLACE IN CELLAR AND ON FLOORS 1 AND 2 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialPlumbing· A&A Plumbing Corp$140KApr 2
- 145 Delancey Street ManhattanTenant fit out for Chase bank. No change to use, egress or occupancy.multifamilyBuilding, HVAC / Mechanical, Plumbing, Signs· Vericon Construction Co$3.2MMay 27
- 290 West End Avenue ManhattanGENERAL CONSTRUCTION ARCHITECTURAL FOR THE RENOVATION OF APARTMENT 3D ON THE 3RD FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.multifamilyBuilding, Plumbing· Renovyt, Inc$221KApr 23
- 1075 1 Avenue ManhattanFACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.multifamilyBuilding· Jerrick Associates Inc$200KApr 2
- 57 Laight Street ManhattanPLUMBING WORK SHALL INCLUDE REMOVAL, RELOCATION, AND REPLACEMENT OF PLUMBING FIXTURES,APPLIANCES, EQUIPMENT, AND ASSOCIATED PIPING. MECHANICAL, SPRINKLER, AND ARCHITECTURAL SCOPE…multifamilyPlumbing· Tap Plumbing Corp$39KApr 2
- 418 West 21 Street ManhattanSEABURY HALL - STRUCTURAL WORK AS DESCRIBED ON DRAWINGS AND IN THE COMMENT BOX BELOW.commercialBuilding· Nova Construction Service$400KApr 2
- 143 Avenue B ManhattanLEGALIZATION OF EXISTINGAPARTMENT AT 14TH FLOOR. NO CHANGE IN USE,BULK, OR EGRESS PROPOSED IN THIS APPLICATION.multifamilyBuilding· Core Group Na Inc—Apr 2
- 432 West 49 Street ManhattanFiling to supersede job#M00317659; removal and relocation of plumbing fixtures on first floor apt #1W. Replace plumbing fixtures in apartment units #2W, 4W & 5WmultifamilyPlumbing· P.S.I. Mechanical$25.5KApr 2
- 1003 Madison Avenue ManhattanInstallation of mechanical HVAC system, ventilation duct work. Mechanical scope only.multifamilyHVAC / Mechanical· TMG Construction Corp$30KApr 2
- 375 Hudson Street ManhattanModification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.commercialFire protection· Bluewater P&H, Inc$28.6KApr 2
- 701 West 168 Street ManhattanAPPLICATION FILE FOR ROOFING REPLACEMENT AS PER PLAN. THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY FILED.commercialBuilding· Nicholson & Galloway, Inc$500KApr 2
- 171 Lexington Avenue ManhattanBOILER REPLACEMENT AND ASSOCIATED DUCTS AND PIPING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.multifamilyHVAC / Mechanical· RPC Mechanical Inc$297KApr 2