New York City commercial construction projects
62,161 commercial and multifamily projects from New York City’s building permit records (11,354 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 10, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 308 of 1244
- 65-50 Kissena Boulevard QueensINSTALLATION OF NEW CHILLED WATER SUPPLY, RETURN PIPING AND CONNECTION FROM EXISTING CONNECTION IN STEAM TUNNEL TO KLAPPER HALL FOR FUTURE USE.commercialHVAC / Mechanical· Aks International Inc$738KMay 4
- 64-14 Kissena Boulevard Queensinstallation of new backup chilled water supply and return piping from existing manhole #6 (MH-6) near I-building to the colden complex service tunnel. Piping connection to king…commercialHVAC / Mechanical· Aks International Inc$2MMay 4
- 44-30 Douglaston Parkway QueensModification to existing T-Mobile site. Install 3 antennas, relocate 1 antenna, remove 3 RRUs, install 3 RRUs, replace 1 existing equipment cabinet and install 1 new cabinet on…multifamilyRoofing· Current Communications LL$28.4KMay 4
- 162-45 Cross Bay Boulevard QueensAT&T - Relocation and replacement of antennas with removal and installation of RRH units on roof. Removal and retrofit of cabinets with platform modifications per plans on roof.…commercialRoofing· United Network Communica$69.5KMay 4
- 207-19 Hillside Avenue QueensINTERIOR RENOVATION OF EXISTING APARTMENT AND HOME OFFICE ON THE 1ST FLOOR. ADD STUCCO TO FRONT FACADE.multifamilyBuilding· Wanhai Inc$77.2KMay 4
- 535 East 6 Street ManhattanINTERIOR RENOVATION OF APARTMENT 3multifamilyBuilding· Fatu, Inc$90KMay 4
- 260 Madison Avenue ManhattanInstallation of suspended scaffold for facade inspection/repair.commercialBuilding· Cerina General Contr. Inc—May 4
- 100 East 77 Street ManhattanNorthwell Lenox Hill Chiller # 2 and # 3 Replacement Project: rearrange interior, non-bearing partition(s), install hung ceiling, wall and floor finishes as per plans filed…commercialBuilding· L.F. Driscoll Company LLC$390KMay 4
- 969 5 Avenue ManhattanInstallation of suspended scaffold for facade inspection/repair.multifamilyBuilding· L & Z Restoration Corp—May 4
- 340 Madison Avenue ManhattanGeneral construction modifications taking place on the 9, 19, 20, 21 floors as per plans filed herewith. No change in use, egress or occupancycommercialBuilding, Fire protection, HVAC / Mechanical· Reidy Contracting Group$1.2MMay 11
- 528 West 123 Street ManhattanSuspended scaffold outrigger system for facade repair works.multifamilyBuilding· D And S Rest And Wtrprng—May 4
- 115 Hamilton Place ManhattanSuspended scaffold outrigger system for facade repair works.multifamilyBuilding· D And S Rest And Wtrprng—May 4
- 875 Sixth Avenue ManhattanFISP INSPECTION VIA INDUSTRIAL ROPE ACCESScommercial· Everlast Solutions Corp—May 4
- 500 West End Avenue ManhattanThis application is filed to supersede an expired BIS Alt-2 job (102788583) in 02/12/2001. All work completed and no new work to be done under this general renovation permit. No…multifamilyBuilding, Plumbing· Centauri Development Inc$111KMay 14
- 415 Greenwich Street ManhattanEXTERIOR FACADE CANOPY REMOVAL. NO CHANGE IN USE, EGRESS OR OCCUPANCYmultifamilyBuilding· Duprat Construction Corp$50KMay 4
- 415 Greenwich Street ManhattanREPLANTING EXISTING COURTYARD. NO CHANGE IN USE, EGRESS OR OCCUPANCYmultifamilyBuilding· Duprat Construction Corp$80KMay 4
- 45 East 53 Street ManhattanPROPOSE TO CONSTRUCT INTERIOR PARTITIONS, CEILINGS & DOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialBuilding· Muhan Space Corp$50KMay 4
- 530 Laguardia Place Manhattaninstall outrigger suspended scaffolding during facade repair workmultifamilyBuilding· Bay Restoration Corp—May 4
- 400 West 61 Street ManhattanFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolamultifamily· Structural Preservation S—May 4
- 226 East 26 Street ManhattanRENOVATION OF APARTMENT #3D. WORK INCLUDES NEW PARTITIONS AND FINISHES. PLUMBING WORK TO BE FILED AS SUBSEQUENT FILING. NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.multifamilyBuilding, Plumbing· Beach Lane Management Inc$60KMay 22
- 301 Park Avenue ManhattanINTERIOR RENOVATION OF UNITS 2805 & 2803 AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCPANCY.multifamilyBuilding, Plumbing· Almar Plumbing & HTG Corp$180KMay 4
- 845 Madison Avenue ManhattanGeneral construction inclusive of minor partitions modifications for store remodel. No change to use, egress, or occupancy.multifamilyBuilding· D Mark Construction Corp$125KMay 4
- 189 Columbus Avenue ManhattanNON-ILLUMINATED NON-ADVERTISING DOUBLE-FACE PROJECTING ACCESSORY SIGN APPROVED UNDER NYC LANDMARK PRESERVATION COMMISSION DOCKET# 26-07069 - NEUHAUS. NO CHANGE OF USE, EGRESS OR…multifamilySigns· Mad Signs Inc—May 4
- 544 West 110 Street ManhattanINSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT.commercial· New Roc Contracting Corp—May 4
- 243 East 39 Street ManhattanFACADE REPAIR WHICH INCLUDES RE- POINTING, WINDOW SILL BROWNSTONE REPAIR AND BROWNSTONE REPAIR AS PER PLANS @ EXPOSURE 1. SIDEWALK SHED FILED UNDER A SEPARATE APPLICATION.multifamilyBuilding· Sardar Restoration Corp$31.6KMay 4
- 280 Park Avenue ManhattanDemolishion of and interior build out including a convenience stair removal and slab infil.commercialBuilding· Tri-Star Construction Cor$124KMay 4
- 45 East 20 Street ManhattanPropose installation of (2) air cooled condensing units and (2) air handling units. No change to use, egress or occupancy.commercialHVAC / Mechanical· Ap Mechanical LLC$61.9KMay 4
- 115 West 86 Street ManhattanFILING FOR INTERIOR RENOVATION OF THE LOBBY AS PER PLANS SUBMITTED HEREWITH.multifamilyBuilding· King Rose Of NY, Inc$150KMay 4
- 211 Columbus Avenue ManhattanFILING FOR THE DEMOLITION OF EXISTING ROOFTOP HVAC UNITS. REPLA CEMENT WITH NEW UNITS ON EXISTING DUNNAGE IN SAME LOCATION. RECONNECT TO EXISTING ELECTRICAL AND GAS SERVICE.…commercialHVAC / Mechanical· Emcor Services NY/NJ Inc$65KMay 4
- 177 East 73 Street ManhattanApplication filed for structural emergency temporary shoring at the cellar level as per plans filed herewith. No change in use, egress or occupancycommercialBuilding· Skyway Rest. Services$30KMay 4
- 430 East 29 Street ManhattanOT-GC work as per plans filed herewith.commercialBuilding, HVAC / Mechanical· Evos LLC$485KMay 4
- 1886 3 Avenue ManhattanILLUMINATED NON-ADVERTISING DOUBLE-FACE PROJECTING ACCESSORY SIGN - BURGER KING. NO CHANGE OF USE, EGRESS OR OCCUPANCY.commercialSigns· Signstar NYC—May 4
- 165 East 118 Street ManhattanREPLACE ONE (1) DIRECT VENT GAS-FIRED BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyHVAC / Mechanical, Plumbing· Leema Plbng & Heating Inc$70KMay 15
- 200 Park Avenue South ManhattanINTERIOR RENOVATIONS AT 200 PARK AVE SOUTH SUITE 501 & 5TH FLOOR BATHROOM FOR INTERIOR PARTITIONS & LIGHTING. NO CHANGE INUSE, EGRESS, OR OCCUPANCY.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Sark Flooring LLC$671KMay 13
- 16 East 80 Street ManhattanInterior renovation to create new laundry closet, walk-in closet, and new interior stair railing.multifamilyBuilding, Plumbing· NYC Design & Reno LLC$40KMay 18
- 561 Broadway ManhattanFiling for interior renovations on the 6th floor, units 6 A/B and 6C - work to include installation of interior non-load bearing partitions and finishes. Plumbing work filed…commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Schimenti Construction Co$1.3MMay 8
- 767 5 Avenue ManhattanInfill of the plaza fountains; new waterproofing and stone pavers as shown on drawings. No change in use, egress or occupancy.commercialBuilding, Plumbing· Turner Construction Compa$595KMay 15
- 430 Park Avenue ManhattanHerewith file mechanical plans to replace existing a/c unit of interior floors of the building with a new water cooled unit of the same capacity, work on 7th floor. (unit is 35…commercialHVAC / Mechanical· Marlin Mechanical Inc$305KMay 4
- 535 Park Avenue ManhattanRENOVATION OF EXISTING DWELLING UNIT, APARTMENT 4AB AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY.multifamilyBuilding, HVAC / Mechanical, Plumbing· Coppermine Construction$2.1MJun 2
- 37 West 12 Street ManhattanINTERIOR RENOVATION OF A EXISTING APARTMENT, INCLUDING PARTITION CHANGES. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.multifamilyBuilding· Setanta Inc$816KMay 4
- 155 East 72 Street ManhattanINTERIOR ALTERATION WITHIN EXISTING TENANT SPACE UNIT 1N ON 1ST FLOOR IN EXISTING BUILDING: NEW NON-BEARING INTERIOR PARTITIONS, NEW INTERIOR FINISHES. NEW MILLWORK. NO CHANGE TO…multifamilyBuilding· Dve Construction Inc$252KMay 4
- 510 West 170 Street ManhattanInterior renovation of apartment 1B at cellar, no change in use, egress or occupancymultifamilyBuilding, Plumbing· Crossland Construction C$90KJul 6
- 506 West 170 Street ManhattanInterior renovation of apartment 1B at cellarmultifamilyBuilding, Plumbing· Crossland Construction C$90KJul 6
- 106 Central Park South ManhattanInstallation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.multifamilyBuilding· New Amsterdam Restoration—May 4
- 562 West 190 Street ManhattanFacade repairs as per plans; no change to use, egress, or occupancy.multifamilyBuilding· Pofi Construction Corp$104KSep 16
- 250 West 27 Street ManhattanMINOR WORK TO COMBINE UNITS #B & C ON THE 5TH FLOOR PER TPPN#3/97. REMOVAL OF A MINOR PORTION OF THE NON-LOAD BEARING PARTITION BETWEEN THE UNITS AS PER DRAWINGS FILED HEREIN. NO…multifamilyBuilding· V. Disalvo Contracting Co$50KMay 4
- 4300 Broadway ManhattanFACADE REPAIR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding· Tajco Construction Corp$65.8KMay 4
- 85 Barrow Street ManhattanAPPLICATION TO COMBINE APARTMENT UNITS 6N & 6M. THE WORK CONSISTS OF MINOR MODIFICATIONS TO THE INTERIOR LAYOUT OF THE SPACE. NO CHANGE IN USE OCCUPANCY OR EGRESS.multifamilyBuilding, Plumbing· Mksskr Consulting Service$97KJun 9
- 30 East 76 Street ManhattanINSTALL(1) NEW BOILER AND COMBINATION GAS/OIL BURNER. CON ED STEAM CONVERSION. (2) NEW 330 GALLON OIL TANKS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.multifamilyBuilding, HVAC / Mechanical, Plumbing· Champion Combustion Corp$575KMay 5
- 245 East 25 Street ManhattanCooling tower replacement as per plans. No change in use, egress, or occupancy.multifamilyBuilding, HVAC / Mechanical· New York Cooling Towers I$403KMay 4