New York City commercial construction projects
62,161 commercial and multifamily projects from New York City’s building permit records (11,246 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 10, 2026); Pro shows it the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 304 of 1244
- 1 Rockefeller Plaza ManhattanInterior alteration work within an existing office space, including removal and installation of interior non-bearing partitions and associated architectural finishes, as per…commercialBuilding· JRM Construction MGMT LLC$1.4MMay 6
- 550 Madison Avenue ManhattanInstallation of suspended scaffold for facade work or inspectioncommercial· Superstars Contracting In—May 6
- 1 East 57 Street ManhattanDEMO AND REMOVAL OF EXISTING NON LOAD BEARING PARTITIONS, MILLWORK, FINISHES AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Sciame Construction LLC$174KJul 15
- 99 Park Avenue ManhattanAT 11TH FLOOR ROOF SETBACK, REPLACEMENT OF ROOF AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.commercialBuilding· Phoenix Sutton STR Inc$175KMay 6
- 1500 Broadway ManhattanModification to the existing mechanical system on the 20th floor (SNA Displays) as per plans. No change to use, egress or occupancycommercialHVAC / Mechanical· W.J. Regan & Company LLC$80KMay 6
- 160 5 Avenue ManhattanSELECTIVE DEMOLITION OF EXISTING PARTITIONS,DOORS,FLOORFINISHES,CEILING FINISHES,AND LIGHTING FIXTURES.CONSTRUCTION TO INCLUDE PARTITIONS,DOORS,CEILINGS, LIGHTING,AND ASSOCIATED…commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· John Gallin & Son, Inc$1MJun 18
- 420 Park Avenue South ManhattanSTRUCTURAL FRAMING WITH STEEL ON 18TH AND 19TH FLOORS. NO CHANGE IN OCCUPANCY, USE OR EGRESS.commercialBuilding· L&K Partners, Inc$100KJun 11
- 204 East 23 Street ManhattanRemove existing roof, brick parapets, select masonry surfaces and replace with new. Work includes but is not limited to demolition, scaffolding, roof replacement, HVAC…commercialBuilding· Structure Tone, LLC$1.6MMay 6
- 3 East 77 Street ManhattanRENOVATION OF AN EXISTING APARTMENT 15B. DEMOLITION AND CONSTRUCTION OF PARTITIONS, INTERIOR RENOVATION OF KITCHEN, AND BATHROOM. ALL WORK IS INTERIOR. PLUMBING WORK FILED UNDER…multifamilyBuilding, Plumbing· S. Donadic Inc$1.3MMay 11
- 112 9 Avenue ManhattanINSTALL EXTERIOR NON-ILLUMINATED WALL SIGN (GLOWBAR)multifamilySigns· A.M.A Holdings Inc—May 6
- 199 Water Street ManhattanPlumbing work for office renovation for Cohen Milstein Toll on 21st marketing level (20th construction)commercialPlumbing· William C. Gerakaris P&H$70KMay 6
- 330 7 Avenue ManhattanPropose to perform interior renovations. No change in use, egress or occupancy.commercialBuilding· Marick Contracting Corp$134KMay 6
- 542 West 112 Street ManhattanInstallation of voluntary Sprinkler system and Plumbing work, as per plans filed herewith. No change to use, egress or occupancy.commercialFire protection· Archer Consultants Group$1.3MMay 7
- 245 Park Avenue ManhattanInstallation of plumbing fixtures and associated piping on the 32nd floor (EQT Partners) as per plans. No change to use, egress or occupancy.commercialPlumbing· Par Plumbing Co., Inc$479KMay 6
- 157 East 37 Street ManhattanRenovation of kitchen & bathrooms, new light fixtures on existing ceilings. No change in use, occupancy or egress.multifamilyBuilding· David Turner Architect,PC$60KMay 6
- 541 West 29 Street ManhattanAPPLICATION FILED FOR LL 11/87 FACADE REPAIRS AS PER PLANS HERE WITHIN. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.commercialBuilding· Tower Services Inc$292KMay 6
- 1114 Madison Avenue ManhattanPROPOSED TO RENOVATE THE 1ST FLOOR RETAIL STORE, WORK WILL INCLUDE: NEW PARTITIONS, FINISHES, CABINETS, CASEWORK & STORE FIXTURES. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER…multifamilyBuilding· Fabrizzio Construction In$123KMay 6
- 25 Sutton Place South ManhattanRENOVATION WORK AT APT 6F (6TH FLR) INCLUDING REMOVAL & INSTALLATION OF NON-LOAD BEARING PARTITIONS, DOORS, CEILING, NEW FINISHES & RELATED CONSTRUCTION AS PER PLANS. NO CHANGE…multifamilyBuilding, Plumbing· C N M Construction Inc$285KMay 13
- 1219 3 Avenue ManhattanINTERIOR RENOVATION TO EXISTING RETAIL SPACE ON THE FIRST FLOOR, CONSTRUCT NEW NON BEARING PARTITIONS, ALL AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY.multifamilyBuilding· JK NY Interior Inc$75KMay 6
- 22 Reade Street ManhattanCity Planning Bldg. Exterior Partial Roof Replacement/Repairs and associated flashings & abatement, deck repairs, drains, gutter, leader, masonry and sealant. Railing repairs &…commercialBuilding· Contract & Hospitality$1.7MMay 6
- 21 East 15 Street ManhattanFiling herewith general construction to include interior renovation and minor demo as per planscommercialBuilding, Fire protection, HVAC / Mechanical· Tristate PLBG SVCS Corp$387KMay 12
- 22 East 16 Street ManhattanFiling herewith general construction to include interior renovation and minor demo as per planscommercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Structure Tone, LLC$451KMay 7
- 200 Park Avenue ManhattanFILING HEREWITH SPRINKLER AND STANDPIPE WORK AS PER PLANS.commercialFire protection· Abco-Peerless Sprklr Corp$221KMay 6
- 301 East 69 Street ManhattanLOCALIZED FACADE REPAIRS, INCLUDING REPLACEMENT OF DEFECTIVE BRICKS, REPLACEMENT OF SHELF ANGLES, MORTAR JOINT CUTTING & POINTING & SEALANT REPLACEMENT. RECONSTRUCT PARAPETS AS…multifamilyBuilding· Tower Services Inc$372KMay 6
- 89 South Street ManhattanSTRUCTURAL WORK TAKING PLACE ON FLOORS 1 AND 2 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialBuilding· G Builders III LLC$500KMay 6
- 473 Fdr Drive ManhattanCOMBINE APTS. K1502 & K1503 AS PER TPPN 3/97, WORK IS GENERAL CONSTRUCTION, RENOVATION WILL HAVE NO EFFECT ON THE EXISTING BUILDING UTILITY SYSTEMS OR STRUCTURE. NO CHANGE IN…multifamilyBuilding, Plumbing· Lower East Side Const Inc$166KMay 6
- 50 West 17 Street ManhattanMODIFICATION OF MECHANICAL DUCTWORK AND INSTALLATION OF AC UNITS.commercialHVAC / Mechanical· Techcrew Inc$230KMay 6
- 1411 Broadway ManhattanModifications to the existing HVAC System: Remove ductwork, piping and equipment back to building core on the 30th Floor as per plans (Hines - Full Floor Demo & Whitebox.) No…commercialHVAC / Mechanical· Nycan Builders LLC$30.5KMay 6
- 701 7 Avenue ManhattanWelding of rebar splicing where applicable during selective concrete balcony patch repairs as per plans filed herewith.commercialBuilding· Skyline Restoration Inc$132KMay 6
- 32 Gramercy Park South ManhattanCOMBINE APARTMENT 3K AND 3L PER TPP 3/97, GENERAL CONSTRUCTION TO INCLUDE LIMITED REMOVAL AND CONSTRUCTION OF NON-STRUCTURAL PARTITIONS, NEW LIGHTING THROUGHOUT, REPLACEMENT OF…multifamilyBuilding, Plumbing· Clearcut Group Corp$214KMay 8
- 550 Washington Street ManhattanStandpipe modifications taking place on the 11th floor as per plans filed herewith. No change in use, egress or occupancymultifamily· Abco-Peerless Sprklr Corp$110KMay 6
- 375 Madison Avenue ManhattanFiling herewith general construction scope for elevators lobbies at 3rd thru 6th floor as per plans. No change in use, occupancy, or egress under this application.commercialBuilding, Fire protection, HVAC / Mechanical· Structure Tone, LLC$3.6MJun 24
- 171 West 83 Street ManhattanFile application to amend changes to approved and permitted ALT 991/87. Minor plumbing replacements and relocations. New washer in cellar. No change of use or occupancy.multifamilyBuilding, Plumbing· G.B. & Son, Inc$26KMay 6
- 2367 2 Avenue ManhattanFull demolition to a one story buildingcommercialDemolition· BSC Services LLC$50KMay 6
- 415 West Broadway ManhattanGeneral construction alterations on the 5th floor for proposed commercial tenant fit-out; related work as per plans. No proposed change in building use, egress, or occupancy.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· G Builders III LLC$319KSep 16
- 35 West 67 Street ManhattanHerewith filing for interior renovation of cellar and basement for Macaulay College to update the number of allowed occupancy, including restroom renovations on cellar, 2, 3 and…commercialBuilding, Fire protection, HVAC / Mechanical· A.B.C.D. Construction Cor$4.4MJun 1
- 139 East 94 Street ManhattanGeneral construction proposed in existing unit #6C on the 6th floor. Subsequent plumbing application to be filed. All per submitted plans. No changes to use, egress, or occupancy.multifamilyBuilding· Euro Group Design Group$25.1KMay 6
- 151 East 83 Street ManhattanINTERIOR RENOVATION OF APT 8E, PREVIOUSLY COMBINED FROM 7E, 8E, AND 8F UNDER ALT 984-87 & M00537623 - NEW KITCHEN AND MINOR PARTITION WORK. NO CHANGE TO USE, EGRESS, OR OCCUPANCYmultifamilyBuilding, Plumbing· Premier Interiors Inc$79KJun 4
- 500 Park Avenue ManhattanRenovation of kitchen (existing pl; plumbing fixtures and new electric stove) and Restoration of bathroom. Partial lighting modifications and painting.commercialBuilding, Plumbing· A&S Construction Group.In$75KMay 11
- 222 East 64 Street ManhattanNorthwell Health New MEETH: minor Architectural scope in conjunction with sprinkler upgrades throughout building on floors indicated, as per plans filed herewith. No change to…commercialBuilding· The Whiting-Turner Contra$60KMay 6
- 217 West 57 Street ManhattanRENOVATION OF EXTERIOR BALCONY ON THE 71TH FLOOR, APT 109.multifamilyBuilding· Brook Landscape Inc$50KMay 6
- 854 5 Avenue ManhattanREMOVE HVAC EQUIPMENT ON FLOOR 06 AND ROOF. NO CHANGE TO USE, EGRESS OR OCCUPANCY.commercialHVAC / Mechanical· JRM Construction MGMT LLC$44.2KMay 6
- 161 West 13 Street ManhattanStructural drawings for renovation of existing multi-family 4 story building for new single family 4 Story building with roof top addition. Super structure of building will…multifamilyBuilding, Plumbing· LBL Improvement SRVC Inc$829KSep 24
- 25 Avenue D ManhattanIt is proposed to renovate existing space for the tenant on the 1FL. No Change of use, egress or occupancy. Application filed in conjunction with M01146812-S1 (MS) and…commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· LK Builder Management Inc$240KMay 13
- 343 1/2 West 12 Street ManhattanPlumbing Modification of 1st and 2nd floors as per plans filed herewith.multifamilyPlumbing· Vertex P & H Corp$30KMay 6
- 2683 Atlantic Avenue BrooklynSleeve and pipe for sewermultifamilyPlumbing· Just PLBG & HTG Inc—May 6
- 1726 Mcdonald Avenue Brooklynexterior &interior of commercial space partial work on cellar, 1st floor and mezzanine with repair ceiling, floor, new partition, door, painting and install new AC units, no…commercialBuilding, HVAC / Mechanical, Plumbing· Mercury Building Asso Inc$399KMay 6
- 1764 71 Street BrooklynPROPOSED INTERIOR ALTERATION AT CEL, 1ST & 2ND FLR OF EXISTING TWO (2) STORY BUILDING. WORK INCLUDES REMOVAL & REPLACEMENT OF FLR FINISHES,NEW CEILING & PAINTING THROUGHOUT,NEW…multifamilyBuilding, Plumbing· Cube Builders Group NY$142KMay 7
- 404 5 Avenue BrooklynREMOVE EXISTING NON-BEARING INTERIOR PARTITION AND FINISH WITHIN AT CELLAR STORAGE, 1ST AND 2ND FL TENANT SPACE. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.commercialBuilding· L&Y Development Group Inc$30KMay 6
- 567 Ocean Avenue Brooklyn#505 - Water damage restoration of existing apartment. Plumbing to be filed subsequently. No change to use egress or occupancy.multifamilyBuilding, Plumbing· Oz Contracting LLC$41.5KMay 18