New York City commercial construction projects
62,161 commercial and multifamily projects from New York City’s building permit records (11,246 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 10, 2026); Pro shows it the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 294 of 1244
- 1 Battery Park Plaza ManhattanFILING FOR INTERIOR RENOVATION OF 4TH FLOOR IBO OFFICE SPACE AS PER PLANS SUBMITTED HEREWITH.commercialBuilding, HVAC / Mechanical, Plumbing· On-Trac Construction Asso$892KMay 21
- 1411 Broadway ManhattanINSTALLATION OF NON LOAD BEARING PARTITIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialBuilding· JT Magen & Company Inc$6.1MMay 12
- 15 Watts Street ManhattanINTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE ON 2ND AND 3RD FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.commercialBuilding, Fire protection, Plumbing· I-Resolve Construction GR$456KSep 14
- 50 Madison Avenue ManhattanINTERIOR RENOVATION OF AN EXISTING APARTMENT APT. 7U 8th FLOOR IN AN EXISTING RESIDENTIAL BUILDING. ARCHITECTURAL WORK ONLY. NO CHANGE IN USE, OCCUPANCY, OR EGRESSmultifamilyBuilding, Plumbing· Uberto, LTD$2.5MMay 14
- 1134 1 Avenue ManhattanLimited work to remove and discontinued damaged light weight ornamental cornice, install copper coping at exist. parapet wall and reinstall railing. ECB # 39180631K violation to…multifamilyBuilding· LM Creative Construction$30KMay 12
- 1998 Broadway ManhattanHVAC Unit Replacement on the 7th floor MER. All existing ductwork to remain as is. No change in use egress and occupancy.multifamilyHVAC / Mechanical· Arista Air Conditioning C$50KMay 12
- 61 Broadway ManhattanINSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT.commercial· New Roc Contracting Corp—May 12
- 1540 Broadway ManhattanConstruction modifications taking place on the 6th floor (8th floor Marketing) as indicated on the drawings.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Benchmark Builders LLC$1.4MJun 8
- 100 East 77 Street ManhattanNorthwell Lenox Hill: minor Structural scope in conjunction with Central Sterile HVAC upgrades.commercialBuilding· L.F. Driscoll Company LLC$25KMay 12
- 220 West 26 Street ManhattanSELECTIVE REPAIRS, INCLUDING: BRICK REPLACEMENT, REPOINTING, CONCRETE PATCHING AS PER PLANS FILED HEREWITHmultifamilyBuilding· Skyline Restoration Inc$28.8KMay 12
- 40 West 86 Street ManhattanFILING FOR INTERIOR RENOVATION OF EXISTING FIRST FLOOR MAIN LOBBY AS PER PLANS SUBMITTED HEREWITH.multifamilyBuilding· Ibx Emergency,LLC$200KMay 12
- 1000 10 Avenue ManhattanMSW -10C ADMIN OFFICE RENO - GENERAL CONSTRUCTION INCLUDING CEILING, FLOOR, PARTITION & DOOR MODIFICATIONS AS PER PLANS FILED HEREWITH. SCOPE INCLUDES NEW SLAB CUT ON ROOF TO…commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Unity Constr. SVCS Inc$2MJun 3
- 32 Spring Street ManhattanRenovation (General Construction) of existing first floor eating and drinking establishment with cellar storage and low roof terrace as per plans. There is no increase in size or…multifamilyBuilding, HVAC / Mechanical, Plumbing· Nicon Build LLC$500KAug 25
- 1 Rockefeller Plaza ManhattanAlterations to sprinkler system on 1st and 2nd floor as plans. No change to use, egress or occupancy.commercialFire protection· Full Capacity Fire Corp$41.5KMay 12
- 2 West Street ManhattanHEREWITH FILING FOR INTERIOR MODIFICATIONS IN THE CELLAR, 3RD- 13TH FLOORS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.multifamilyBuilding· Hidden Hill Hospitality C$300KMay 12
- 330 Madison Avenue ManhattanInterior work to include minor non-structural demolition and construction of interior partitions as shown on plans. Work to include lighting upgrades, column covers, and new…commercialBuilding· L&K Partners, Inc$978KMay 14
- 424 West End Avenue ManhattanINTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE IN THE BASEMENT. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.multifamilyBuilding, Plumbing· Gaudioso Contracting Inc$111KJul 15
- 9 West 57 Street ManhattanSuspended Scaffold for Facade Restoration & Inspection as Shown on Planscommercial· M & L Signs, Inc—May 12
- 1 Madison Avenue ManhattanRemoving of existing workstations and constructing an office as per plans filed herewith. No change in use, egress, or occupancy.commercialBuilding· JT Magen & Company Inc$600KMay 12
- 410 10 Avenue ManhattanModifications to the existing plumbing system on the basement level (BOA) as per plans. No change to use, egress or occupancy.commercialPlumbing· Lab PLBG & HTG Co Inc$86.7KMay 12
- 299 West 12 Street ManhattanINSTALLATION OF MECHANICAL UNIT OPENINGS, AND HVAC UNITS AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.multifamilyBuilding· Major Air Service Corp$42KMay 12
- 200 West 79 Street ManhattanRENOVATION OF EXISTING DUPLEX FILED IN CONJUNCTION WITGH DOB NOW PL, ST AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.multifamilyBuilding, HVAC / Mechanical, Plumbing· Home Solutions Inc$305KMay 15
- 200 East 57 Street ManhattanAPARTMENT INTERIOR RENOVATION INCLUDING PLUMBING FIXTURES, CEILING SOFFITS, KITCHEN COUNTERTOP, AND WALL PAINTS. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.multifamilyBuilding· Durgun Home Improvements$80KMay 12
- 2406 Frederick Douglas Boulevard ManhattanRemove & replace existing boiler feed pumps & provide boiler feed piping, reconnection to existing headers. Relocate existing boiler feed pump control & provide power, control…multifamilyBuilding, Fire protection, HVAC / Mechanical· WDF Inc$400KOct 5
- 1042 Madison Avenue ManhattanREPLACEMENT OF HVAC UNITS IN THE BASEMENT, FLOOR 001, AND ROOF WITH A TOTAL CAPACITY OF 272,000 BTU/h. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.commercialHVAC / Mechanical· KSW Mechanical,LLC$80.5KMay 12
- 197 Henry Street ManhattanINTERIOR DEMOLITION ONLY TO EXISTING 3 STORY BUILDING. NO EXTERIOR WORK. NO CHANGE TO USE, OCCUPANCY, EGRESS, ORBUILDING ENVELOPEmultifamilyBuilding· Redirecting Lic Inc$45.9KMay 12
- 315 East 80 Street ManhattanCOMBINATION OF ADJACENT APARTMENTS 2A AND 2B ON THE SECOND FLOOR. REMOVAL OF NON LOAD-BEARING WALLS AND MINOR LAYOUT MODIFICATIONS. FINISH AND LIGHTING UPGRADES THROUGHOUT. NO…multifamilyBuilding, Plumbing· The Foundry Interiors GR$166KJun 5
- 99 Park Avenue ManhattanSLAB OPENING FOR STAIR, STAIR DESIGN, SHORING AND RECONNECTION OF EXISTING STAIR AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.commercialBuilding· Alba Group Inc$130KMay 12
- 514 West 49 Street ManhattanSTRUCTURAL WORK ASSOCIATED WITH garage repair. No changes to occupancy, egress or use.commercialBuilding· Russco ,Inc$500KMay 12
- 100 Park Avenue ManhattanMechanical changes as indicated on plans.commercialFire protection, HVAC / Mechanical, Plumbing· A.W. & S. Construction Co$205KJun 22
- 120 Wooster Street ManhattanMechanical specifications filed for the replacement of 2 rooftop unitscommercialHVAC / Mechanical· Modphy Mechanical LLC$75KMay 12
- 99 Park Avenue ManhattanREMOVAL AND INSTALLATION OF DUCTWORK, DIFFUSERS, FANS, CONDENSING AC UNITS AND RELATED MECHANICAL PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.commercialHVAC / Mechanical· Alba Group Inc$600KMay 12
- 99 Park Avenue ManhattanREMOVAL AND INSTALLATION OF PARTITIONS, CEILINGS, DOORS AND FINISHES AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.commercialBuilding· Alba Group Inc$600KMay 12
- 308 West 103 Street ManhattanFacade repairs, including helical tie replacement, as shown on the drawings filed herewith. No change in use, egress, or occupancy.multifamilyBuilding· Xinos Construction Corp$341KMay 12
- 250 Vesey Street ManhattanRelocation of conduitcommercialBuilding· JRM Construction MGMT LLC$100KMay 12
- 1 Penn Plaza ManhattanConstruction work on the 38th floor (Nuvation Bio) as indicated on drawingscommercialBuilding· Clune Construction Co LP$1MMay 12
- 590 Madison Avenue ManhattanMinor demolition with installation of new partitions, doors, suspended ceilings and finishes on the Sub-cellar level 4, 10th & 11th floors (Apollo Global Management) as per…commercialBuilding· Structure Tone, LLC$11.8MMay 12
- 400 Broome Street ManhattanAlteration is being filed for the renovation of the existing 11th floor to covert accessory residential spaces to dwelling units.commercialBuilding· Forkosh Construction Co$295KMay 12
- 375 Hudson Street ManhattanINSTALLATION OF INTERIOR NON-BEARING PARTITIONS TO REFLECT THE CHANGE OF THE USE AND OCCUPANT LOAD WITH A NEW PLACE OF ASSEMBLY MEETING ROOM ON THE 16TH FLOOR AS PER DRAWINGS…commercialBuilding· Clune Construction Co LP$94KMay 12
- 500 5 Avenue ManhattanINTERIOR REMOVALS WORK AT 51M/50C PARTIAL FLOOR INCLUDING PARTITION, CEILING AND DOOR REMOVALS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialBuilding· Omara Organization Inc$32.7KMay 12
- 401 South End Avenue ManhattanFiling for Structural/Foundation work for Reach 5 - Construction of a flood barrier system for the BPCA North/West Battery Park City Resiliency project. No change to use, egress…commercialBuilding, HVAC / Mechanical, Plumbing· Turner Ee Cruz A Joint$250MJun 25
- 165 West 91 Street ManhattanCYCLE 9 FISP REPAIRS, INCLUDING BRICK REPLACEMENT, RAILING REPLACEMENT,RAILING HEIGHT ADJUSTMENT, MASONRY REPOINTING, SILL REPLACEMENT,PARTIAL ROOF REPLACEMENT & WOOD FENCE…multifamilyBuilding· New Roc Contracting Corp$159KMay 12
- 25 East 17 Street ManhattanTHIS WORK INVOLVES THE REMOVAL OF A PORTION OF INTERIORMASONRY WALLS, REPAIR OF DAMAGED FLOOR JOISTS, AND REFRAMINGFOR A FUTURE ELEVATOR.commercialBuilding· Aspen Truss Inc$80KMay 12
- 145 Central Park West ManhattanInterior renovation to unit 1B. Plumbing and mechanical work to be filed separate. No change to occupancy use or egress.multifamilyBuilding· Sync Construction LLC$150KMay 12
- 20 North Moore Street ManhattanLimited facade restorations as per plans filed. No change on occupancy, use or egress.multifamilyBuilding· West New York Restoration$100KMay 12
- 225 Broadway ManhattanInstallation of new sprinkler heads on Basement, Ground fl, Mezzanine, 005, 007, 009, 010, 012, 014, 015, 017, 034 floors. No change in use, egress or occupancy.commercialFire protection· Firequest Corp$1.8MMay 12
- 237 Madison Avenue ManhattanFILE ALTERATION-CO FOR CHANGE OF USE OF THE CELLAR FLOOR AND ADD EATING AND DRINKING IN CONJUNCTION WITH GROUND FLOOR RESTAURANT OF EXISTING 17 STORY APARTMENT HOTEL AS PER CO…commercialBuilding· To Sharp Construction Co$239KMay 12
- 213 East 83 Street ManhattanSupport of excavation for proposed new residential 7 story buildingcommercialBuilding, Fire protection, Plumbing· Omni Build Inc—Oct 8
- 450 Riverside Drive ManhattanFacade repairs as shown on drawings submitted herewith for LL11/98 compliance.multifamilyBuilding· Tribute Restoration Inc$115KMay 12
- 448 Riverside Drive ManhattanFacade repairs as shown on drawings submitted herewith for LL11/98 compliance.multifamilyBuilding· Tribute Restoration Inc$66KMay 12