New York City commercial construction projects
62,199 commercial and multifamily projects from New York City’s building permit records (11,165 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 11, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 24 of 1244
- 52 Vanderbilt Avenue ManhattanDemolition & Installation of Partitions, Doors, Millwork, Patch Existing Wall & Floor Finishes & Suspended Ceiling and Renovate Existing Pantry on Part of 7th & 9th Floor. No…commercialBuilding$110KOct 22
- 127 Stanton Street ManhattanInterior renovation of apt. #7 as per the plans filed herewith. No change to the use, egress or occupancy.multifamilyBuilding, Plumbing$60.2KOct 23
- 200 East 69 Street ManhattanRemodel existing kitchen and suspended ceiling, no change in occupancy use or egressmultifamilyBuilding, Plumbing$100KOct 23
- 59 Warren Street ManhattanMODIFICATION OF TEMPORARY RAKER SHORING SYSTEM PREVIOUSLY FILED UNDER 123558159 TO ALLOW FOR NEW BUILDING CONSTRUCTION, FILED SEPARATELY UNDER 121190497.multifamilyBuilding$1MOct 22
- 161 West 16 Street Manhattaninterior renovation of apt 5CmultifamilyBuilding$30KOct 22
- 42 Broadway ManhattanNew HVAC system on portion of the 17 floor in conjunction with Alt # M01435016 as per plans filedcommercialHVAC / Mechanical$84KOct 22
- 225 West 71 Street ManhattanINDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS. NO CHANGES IN THE MEANS OF EGRESS.multifamily—Oct 22
- 23 West 116 Street ManhattanALTERATION FOR INTERIOR TENANT IMPROVEMENTS IN AN EXISTING PHYSICAL CULTURE ESTABLISHMENT ON THE FIRST FLOOR. AS PER PLANS. NO CHANGE IN BULK, USE, OCCUPANCY, OR EGRESS.multifamilyBuilding$550KOct 22
- 141 East 88 Street ManhattanInstallation of suspended scaffold for facade work or inspection.multifamily—Oct 22
- 365 South End Avenue ManhattanInstallation of suspended scaffold for facade repair & inspection.multifamilyBuilding—Oct 22
- 225 West 34 Street ManhattanAPPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 18TH FLOOR (T&M SECURITY) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,…commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing$1.1MNov 4
- 120 11 Avenue ManhattanREPLACE HVAC SYSTEM AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.multifamilyBuilding, HVAC / Mechanical$99KOct 22
- 51 Walker Street ManhattanFACADE REPAIRS, SCAFFOLD INSPECTIONS, THREE MEN LETTERmultifamilyBuilding—Oct 22
- 1501 Broadway ManhattanPROPOSED INTERIOR RENOVATION. ALL AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.commercialBuilding$80.1KOct 22
- 720 West 170 Street ManhattanINSTALLATION OF SUSPENDED SCAFFOLD FOR FACADE REPAIR & FACADE INSPECTIONS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS…multifamilyBuilding—Oct 22
- 1234 Lexington Avenue ManhattanProposed interior renovation of a take-out sushi store. Work on 1st floor only. No change to existing use, egress or occupancy.multifamilyBuilding, Plumbing$99KOct 22
- 39 Broadway ManhattanProvide HVAC on the 22 fl (marketed as 23) in conjunction with Alt #M01460307 as per plans filedcommercialHVAC / Mechanical$108KOct 22
- 1 Penn Plaza ManhattanMechanical work on the 42nd floor (Lutron) as indicated on drawings.commercialHVAC / Mechanical$135KOct 22
- 1 Penn Plaza ManhattanConstruction work on the 42nd floor (Lutron) as indicated on drawings.commercialBuilding$820KOct 22
- 150 Central Park South ManhattanInstallation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.multifamilyBuilding—Oct 22
- 168 Bleecker Street ManhattanTHE PROPOSED DEMOLITION WORK: PARTITION WALLS, CEILING,MECHANICAL, ELECTRICAL & PLUMBING, MILLWORK & FINISHES. NO STRUCTURAL ALTERATIONS ARE PROPOSED. NO CHANGE OF USE, EGRESS OR…multifamilyBuilding$51KOct 22
- 625 West 57 Street ManhattanInterior demolition for restaurant space on 1st floormultifamilyBuilding$88KOct 22
- 277 Park Avenue ManhattanInterior renovation of commercial Office SpacecommercialPlumbing$677KOct 27
- 165 East 66 Street ManhattanHEREWITH FILING FOR PLUMBING FIXTURE MODIFICATIONS IN UNITS 2J & 5J AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.multifamilyPlumbing$40KOct 22
- 42 Broadway Manhattanreplace existing ducts with new layout on existing existing HVAC system on the 15 floor (marketed as 16) in conjunction with Alt # M01456236 as per plans filedcommercialHVAC / Mechanical$87.7KOct 22
- 31 Jane Street ManhattanINTERIOR PARTITION CHANGES. INSTALLED FLOORING. NO EXTERIOR WORK. NO CHANGES TO LAYOUT, EGRESS, OR USE.multifamilyBuilding$105KOct 22
- 88 University Place ManhattanFiling for renovations at the 1st, 6th and 7th floors. Work includes removal interior non load bearing partitions, doors, finish work. No change to use, egress or occupancy.commercialBuilding, HVAC / Mechanical, Plumbing$1.1MOct 30
- 42 West 65 Street ManhattanFACADE REPAIRS - REBUILD SECTION OF PARAPET WALL AT NORTH FACADE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.multifamilyBuilding$50KOct 22
- 77 7 Avenue ManhattanINSTALLATION OF NEW NATURAL GAS SUPPLY PIPING FROM EXISTING NATURAL GAS SERVICE TO NEW GENERATOR AND NEW GAS BOOSTER. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.multifamilyPlumbing$182KOct 22
- 257 Park Avenue South ManhattanGeneral construction work for Interior renovation to include demolition of existing partitions and whitebox in existing office space. no change in use, egress, or occupancy.commercialBuilding$130KOct 22
- 140 West Street ManhattanInterior renovation for Unit K.multifamilyBuilding$80KOct 22
- 1 Penn Plaza ManhattanMechanical work on the 31st floor (KR Capital expansion) as indicated on drawings.commercialHVAC / Mechanical$135KOct 22
- 1372 Broadway ManhattanMECHANICAL MODIFICATIONS TAKING PLACE ON CEL, 1ST & 14TH FL ROOF BULKHEAD AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialHVAC / Mechanical$2.3MOct 22
- 575 Broadway ManhattanNON-ILLUMINATED NON-ADVERTISING DOUBLE-FACE PROJECTING ACCESSORY SIGN APPROVED AS PER NYC LANDMARK PRESERVATION COMMISSION DOCKET# 26-09745 - MASSIMO DUTTI. NO CHANGE OF USE,…commercialSigns—Oct 22
- 575 Broadway ManhattanNON-ILLUMINATED NON-ADVERTISING DOUBLE-FACE PROJECTING ACCESSORY SIGN APPROVED AS PER NYC LANDMARK PRESERVATION COMMISSION DOCKET# 26-09745 - MASSIMO DUTTI. NO CHANGE OF USE,…commercialSigns—Oct 22
- 188 East 78 Street ManhattanInterior alteration of existing apartment 9C, including construction of non load bearing walls, relocation of one bedroom door and installation of new light fixtures. No change…multifamilyBuilding$30KOct 22
- 1090 Amsterdam Avenue ManhattanINTERIOR RENOVATION, MECHANICAL & PLUMBING WORK FOR EXISTING COMMERCIAL SPACE ON THE 1ST FLOOR. PLUMBING WORK WILL BE FILED SUBSEQUENTLY.commercialBuilding$715KOct 22
- 257 Central Park West ManhattanAT 9TH FLOOR APT 9A- INTERIOR RENOVATION, REMOVAL AND INSTALLATION OF NON BEARING INTERIOR PARTITIONS AND RELATED ELECTRICAL WORK.multifamilyBuilding, Plumbing$570KOct 22
- 515 Audobon Avenue ManhattanINTERIOR RENOVATION OF OFFICE SPACE AS PER PLANS FILED HEREIWTH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialBuilding$250KOct 22
- 767 Fifth Avenue ManhattanModification to existing Sprinkler & plumbing system as per plans filed herewith. No change in use, egress or occupancy under this application.commercialFire protection$168KOct 22
- 211 East 79 Street Manhattan15-foot-wide curb cut as shown on plans. Note: This application is a refiling of Curb Cut Application M00002235. Approval has been secured for the curb cut serving the accessory…commercial—Oct 22
- 402 East 90 Street ManhattanFILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.multifamily—Oct 22
- 928 2 Avenue ManhattanCommercial space interior renovation. Update existing kitchen exhaust, add new kitchen equipment & interior renovation as mark on the proposed plans. Cellar not to be use for…multifamilyHVAC / Mechanical$130KOct 22
- 260 Madison Avenue ManhattanInstallation of non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.commercialBuilding$2.7MOct 22
- 1221 Avenue Of The Americas ManhattanGeneral contraction of interior partitions, doors, suspended ceilings, flooring and finishes on the 15th Floor (Dentons) as per plans No change to use, egress or occupancy.commercialBuilding$3.4MOct 22
- 57 East 55 Street ManhattanApplication being filed for interior demolition of non-loading partitions of approximately 14,000 square feet of business space. No change in use, egress, or occupancy.commercialBuilding, Plumbing$537KNov 4
- 600 Lexington Avenue ManhattanREPLACEMENT. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.commercialHVAC / Mechanical$360KOct 22
- 2526 Broadway ManhattanREPLACE FIVE (5) EXISTING GAS BOILERS (37624-01) WITH ONE (1) BOILER AND ONE (1) GAS BURNER. REPLACE THREE (3) HOT WATER GAS BOILERS (37624-02,03,04) WITH THREE (3) GAS-FIRED HOT…commercialBuilding, HVAC / Mechanical, Plumbing$429KNov 4
- 101 West 143 Street ManhattanModification of T-Mobile site - Relocation of 8 antennas and 4 RRU's on the roof. Installing 1 cabinet on the roof. Installing 4 antenna kickbacks on the roof.multifamilyRoofing$39.9KOct 22
- 342 East 8 Street Manhattanfiling herewith for facade repairs as per drawings. there is no change to use,egress or occupancymultifamilyBuilding$68.3KOct 22