New York City commercial construction projects
62,161 commercial and multifamily projects from New York City’s building permit records (11,246 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 10, 2026); Pro shows it the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 234 of 1244
- 35-50 85 Street QueensFILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.multifamily· Maspeth Contracting Corp—Jun 15
- 1607 Woodbine Street QueensSP WORK ON THE 2ND FLOOR. NO CHANGE TO USE , OCCUPANCY OR EGRESS.commercialFire protection· Ashlar Mechanical Corp$190KJun 15
- 87-22 134 Street QueensFILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.multifamilySolar· Sunrun Installation SVC$42.8KJun 15
- 55-60 Myrtle Avenue QueensMinor demo of non-load-bearing interior partitions and removal of Mechanical ductwork, air devices, supports and hangers. No change in occupancy, use or egress.commercialBuilding· Promethean Builders LLC$119KJun 15
- 37-59 81 Street QueensRESTORE ILLEGAL BAR AND CABARET TO THE PREVIOUS LEGAL CONDITION IN THE SUB-CELLAR AS PER THE PLANS FILED HEREWITH TO REMOVE VIOLATION #39169233H, 34J & 35L. NO CHANGE IN USE,…commercialBuilding, Plumbing· L&L Construction Develop$38KJun 16
- 196-40 67 Avenue QueensINSTALLATION OF DUCTLESS MINI SPLIT SYSTEM FOR HEATING AND COOLING AS PER PLANS FILED HEREWITH . NO CHANGE IN USE EGRESS OR OCCUPANCYmultifamilyHVAC / Mechanical· DVM Industries LLC$32KJun 15
- 196-38 67 Avenue QueensINSTALLATION OF DUCTLESS MINI SPLIT SYSTEM FOR HEATING AND COOLING AS PER PLANS FILED HEREWITH . NO CHANGE IN USE EGRESS OR OCCUPANCYmultifamilyHVAC / Mechanical· DVM Industries LLC$32KJun 15
- 196-56 67 Avenue QueensINSTALLATION OF DUCTLESS MINI SPLIT SYSTEM FOR HEATING AND COOLING AS PER PLANS FILED HEREWITH . NO CHANGE IN USE EGRESS OR OCCUPANCYmultifamilyHVAC / Mechanical· DVM Industries LLC$32KJun 15
- 196-48 67 Avenue QueensINSTALLATION OF DUCTLESS MINI SPLIT SYSTEM FOR HEATING AND COOLING AS PER PLANS FILED HEREWITH . NO CHANGE IN USE EGRESS OR OCCUPANCYmultifamilyHVAC / Mechanical· DVM Industries LLC$32KJun 15
- 196-15 69 Avenue QueensINSTALLATION OF DUCTLESS MINI SPLIT SYSTEM FOR HEATING AND COOLING AS PER PLANS FILED HEREWITH . NO CHANGE IN USE EGRESS OR OCCUPANCYmultifamilyHVAC / Mechanical· DVM Industries LLC$32KJun 15
- 80-01 Metropolitan Avenue QueensNew Steel platform in the depressed areaway for the air-cooled chiller at the Resurrection Mausoleum at St. John Cemetery.commercialBuilding· Traditional Air Cond Inc$150KJun 15
- 222-06 South Conduit Avenue QueensProposed alteration to exist. commercial building to create a new business and a new retail store, UG6 in exist. building. Modify exist. storefront at new retail store to an…commercialHVAC / Mechanical· Shine Construction Corp$168KJun 15
- 62-60 99 Street QueensPROPOSED EXTERIOR FACADE RESTORATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding· Teamwork Enterprises Inc$142KJun 15
- 260 West 44 Street ManhattanDIRECTLY REPLACE TWO CONDENSER UNIT ON THE EXISTING ROOF WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCYcommercialHVAC / Mechanical· 128 HVAC Inc$30KJun 15
- 124 West 30 Street ManhattanINTERIOR RENOVATION OF EXISTING COMMERCIAL STORE FOR NEW DROP-OFF CLEANING STORE AS PER PLAN. NO CHANGE OF USE, EGRESS AND OCCUPANCYcommercialBuilding· M.B.Kim,Architect,P.C$60KJun 15
- 1055 2 Avenue ManhattanINTERIOR RENOVATION @ PARTIAL 4TH FLOOR (APTS. #4A & 4D) IN AN EXISTING 4 STORY W/ CELLAR BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCYmultifamilyBuilding, Plumbing· Sabet Development Company$188KJul 7
- 225 Liberty Street ManhattanGENERAL CONSTRUCTION AS SHOWN ON PLANScommercialBuilding, Fire protection, HVAC / Mechanical· Creative Installations In$451KJun 23
- 135 West 52 Street ManhattanROPE ACCESS INSTALLATION FOR FACADE ACCESS AND INSPECTIONSmultifamily· Constructed Corp—Jun 15
- 57 East Broadway ManhattanRENOVATION OF EX. MIXED RESIDENTIAL & COMMERCIAL BUILDINGS WORK ON CELLAR, 2NED FLOOR, 3RD FLOOR AND 4TH FLOOR WITH , REPAIRING CEILING, STAIR, NEW PARTITIONS, DOOR, PAINTING ,…commercialBuilding, HVAC / Mechanical, Plumbing· American Standard P&H Cor$250KJun 17
- 490 Second Avenue ManhattanGeneral construction for interior renovation of Apartment 13A as shown on drawings filed herewith. No change in use, egress or occupancy.multifamilyBuilding· Super G Construction Corp$45KJun 15
- 54 Riverside Drive ManhattanINSTALLATION OF A SUSPENDED SCAFFOLD FOR FACADE INSPECTION AND REPAIR AS PER PLAN SUBMITTEDmultifamilyBuilding· Prat Enterpise, Corp—Jun 15
- 45 East 53 Street ManhattanREMOVAL AND CONSTRUCTION OF INTERIOR NON LOAD BEARING PARTITIONS, CEILINGS, DOORS & FLOORS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Rinnovo Construction, LLC$587KJun 23
- 745 Fifth Avenue ManhattanModifications to the existing sprinkler system on the 18th and 21st floors as per plans. No change to use, egress or occupancy.commercialFire protection· Armon Mechanical Inc$87KJun 15
- 408 East 78 Street ManhattanInstallation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.multifamilyBuilding· KLG Contracting Inc—Jun 15
- 745 Fifth Avenue ManhattanModifications to the existing plumbing system on the 18th and 21st floors as per plans. No change to use, egress or occupancy.commercialPlumbing· Armon Mechanical Inc$62KJun 15
- 261 5 Avenue ManhattanInterior renovation work on the first floor retail space. no change in use, egress and occupancy.commercialBuilding· Atrium Constructions LLC$175KJun 15
- 52 West 28 Street ManhattanFILING FOR FACADE WORK - REPLACE CRACKED BRICKS ON EXP #4, INSTALL STUCCO OVER BRICK FACADE EXP1 AND EXP4. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialBuilding· Metro NY Construction Inc$35KJun 15
- 140 Broadway Manhattaninterior demolition of non-load bearing partitions, finishes, fixtures for 40th floorcommercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Swinerton Builders$170KJul 2
- 201 West 77 Street ManhattanARTITION CHANGES, NEW APPLIANCES, NEW FLOORING AND FINISHES ACCORDING TO DRAWINGS. NO EXTERIOR WORK. NO CHANGES TO USE OR EGRESS.multifamilyBuilding, Plumbing· Freedom GS Inc$125KJun 23
- 259 West 15 Street ManhattanINTERIOR RENOVATION OF APT. 3F ON THIRD FLOOR AS INDICATED ON PLAN. NO CHANGE IN USE OCCUPANCY, EGRESS OR BUILDING BULK.multifamilyBuilding, Plumbing· LKR Construction Inc$65.1KJul 30
- 280 Park Avenue ManhattanRemoval/installation of interior non-bearing partitions & related finishes. no change in use, egress or occupancycommercialBuilding· J.A. Jennings, Inc$140KJun 15
- 155 West 68 Street ManhattanINTERIOR RENOVATION OF #618 ON 6TH FLOOR AT 155 EAST 68 STREET . WORK INCLUDES NON-LOAD-BEARING, NON-RATED PARTITION WITH DOORS. ARCHITECTURAL WORK WITH MINOR ELECTRICAL AND…multifamilyBuilding· SDC Contract Inc$50.1KJun 15
- 222 East 82 Street ManhattanRoofing membrane replacement as per plan. No change in use, occupancy or egress.multifamilyBuilding· LCS Restoration Corp$195KJun 15
- 1177 Avenue Of The Americas ManhattanINSTALLATION OF NON LOAD BEARING PARTITIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialBuilding· Skyline Restoration Inc$1MJun 15
- 315 East 68 Street ManhattanInstallation of a suspended scaffold for faade repairs and inspection as per plan submitted. No change to egress or occupancy.multifamilyBuilding· J&S Waterproofing LLC—Jun 15
- 57 West 57 Street ManhattanAPPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 16TH FLOOR (SUITE 1602) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,…commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· R G Contracting NY LLC$185KJun 24
- 404 Riverside Drive ManhattanPLUMBING WORKS AS SHOWN IN PLANS AT APT 8A ON THE 8TH FLOOR. NO CHANGE IN EGRESS, OCCUPANCY OR USE.multifamilyPlumbing· Ganic Plumbing & HTG Inc$30KJun 15
- 162 East 80 Street ManhattanUNIT 5B: INTERIOR RENOVATION AND CONSTRUCTION OF 2NON-LOAD BEARING WALLS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NO CHANGE TO BUILDING ENVELOPE / CHANGES SUBJECT TO…multifamilyBuilding· Preference Painting & Wal$133KJun 15
- 69 West 9 Street ManhattanINTERIOR RENOVATIONS OF EXISTING KITCHEN, BATHROOM, NEW FLOORING, AND MISC. CARPENTRY WORK IN UNIT 8E ON THE 008 FLOOR. NO CHANGE OF USE, OCCUPANCY, OR EGRESS.multifamilyBuilding, Plumbing· Marpro Construction Corp$62.5KJul 1
- 200 East 75 Street ManhattanGeneral Construction work as shown on plansmultifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· Steadfast Development And$307KJul 20
- 95 Cabrini Boulevard ManhattanSUSPENDED SCAFFOLD OUTRIGGER SYSTEM AT 95 CABRINI BOULEVARD, MANHATTAN, FOR FACADE RESTORATION WORK.multifamily· Al-Ghazali Construction—Jun 15
- 344 West 72 Street ManhattanHEREBY FILING FOR THE COMBINATION OF APARTMENTS 12G AND 12S, LOCATED ON THE 12THFLOOR. INSTALLATION OF AIR HANDLER TO BE CONNECTED TO EXISTING WATER TOWER SUPPLY AND RETURN…multifamilyHVAC / Mechanical, Plumbing· Real Deal Decoration LLC$143KJun 15
- 444 Madison Avenue ManhattanFACADE REPAIRcommercialBuilding· Royal Concrete And Mason$480KJun 15
- 240 Central Park South ManhattanHEREBY FILING APARTMENT RENOVATION, FIXTURE REPLACEMENT AT PRIMARY BATHROOM; RELOCATION OF WASHER DRYER TO WET BAR AREA; NEW MILL WORK AS NEEDED; NEW FINISHES. TO CHANGE TO USE…multifamilyBuilding, Plumbing· Upper Restoration Inc$324KJun 16
- 250 East 53 Street ManhattanInterior renovation of apartment 1402 that will include remodel of the existing bathrooms and kitchen. No change in use, egress or occupancy.multifamilyBuilding· Baba Construction Corp$84.9KJun 15
- 15 Hudson Yards ManhattanAPPLICATION HEREWITH FILED FOR INTERIOR RENOVATION TO EXISTING CLASS A APARTMENT 64E ON THE 41st FLOOR OF AN EXISTING MIXED USE BUILDING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.multifamilyBuilding· Baba Construction Corp$120KJun 15
- 450 West End Avenue ManhattanALTERATION OF SINGLE FLOOR APARTMENT 5B AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY.multifamilyBuilding· NYC Design & Reno LLC$247KJun 15
- 96 South Street ManhattanPLUMBING WORK TAKING PLACE ON THE 1ST, MEZZ 1, 2ND, AND MEZZ 2 FLOORS AND ON THE ROOF AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialPlumbing· Bluewater PLBG& HTG Inc$50KJun 15
- 200 West End Avenue ManhattanPharmacy expansion, non-load bearing walls, modify millwork and storage fixtures. New entrance landing wall, replace interior finishes. Modify checkout and display fixture layout…multifamilyBuilding, HVAC / Mechanical, Plumbing· Dimensional Inc$410KAug 6
- 595 Madison Avenue ManhattanMechanical work on the 20th floor (HVAC project) as indicated on drawings.commercialHVAC / Mechanical· Vanguard Construction And$58KJun 15