New York City commercial construction projects
62,199 commercial and multifamily projects from New York City’s building permit records (11,246 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 10, 2026); Pro shows it the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 200 of 1244
- 43-70 Kissena Boulevard QueensGarage repairs as per plans no change in use, egress, or occupancy.multifamilyBuilding· Skyline Restoration Inc$196KJul 6
- 33-09 Broadway QueensNEW GAS SERVICE AND GAS METER TO BE INSTALLED AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.multifamilyPlumbing· Liquid Tech PLBG&HTG,Inc$58.5KJul 6
- 35-13 76 Street QueensFILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.multifamily· WKR Construction Inc—Jul 6
- 25-24 48 Street QueensHEREWITH FILING PLUMBING SCOPE FOR NEW FITXTURES TO BE INSTALLED (NEW DISHWASHERS, NEW SHOWER STALLS) AND THE RELOCATION OF EXISTING FIXTURES. WATER SANITARY PIPING TO BE…multifamilyPlumbing· Arco PLBG And HTG Inc$45KJul 6
- 22-60 31 Street QueensHEREWITH FILE TO RESTORE THE FIRE DAMAGED RETAIL STORE INCLUDES THE REPLACEMENT OF FIRE-DAMAGED BEARING WALLS AND ROOFING, FLOORING REPAIRS, NEW PAINT, AND GENERAL CONSTRUCTION.…commercialBuilding, HVAC / Mechanical, Plumbing· Zhongshun Jianzhu Inc$65KSep 11
- 123 East 37 Street ManhattanFILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.multifamily· Tribute Restoration Inc—Jul 6
- 7 East 35 Street ManhattanInstallation of suspended scaffold for facade work or inspection.multifamily· Tower Services Inc—Jul 6
- 600 West 111 Street ManhattanInstallation of suspended scaffold for facade inspection.multifamily· A W R Group Inc—Jul 6
- 55 Water Street ManhattanStructural work including concrete repair.commercialBuilding· Structural Preserv System$336KJul 6
- 33 West 138 Street ManhattanINSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT FOR FACADE INSPECTIONS AND REPAIRS.multifamilyBuilding· Central Construction MGMT—Jul 6
- 91 5 Avenue ManhattanSuspended Scaffold out rigger installation for Facade restoration workscommercial· M.G.R. Restoration Inc—Jul 6
- 50 Greene Street ManhattanInterior office renovation to the third floor office space. No change in use, egress, or occupancy.commercialBuilding· Ariel Consultants LLC$150KJul 6
- 161 West 61 Street ManhattanTO PROPOSE INTERIOR RENOVATION IN UNIT #3F WITH GENERAL CONSTRUCTION AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.multifamilyBuilding· Kale Construction Inc$40KJul 6
- 245 Park Avenue ManhattanModifications to the existing HVAC system on the 29th and 30th floors (Day 2 TradeWeb) as per plans. No change to use, egress or occupancy.commercialHVAC / Mechanical· JT Magen & Company Inc$66KJul 6
- 479 1 Avenue ManhattanThis application is to remove existing ceiling tiles and non bearing partition walls and wall finishes to verify the siteconditionsmultifamilyBuilding· Ljpy Corp$30KJul 6
- 100 Claremont Avenue ManhattanREPLACE PARKING STACKERS ON 2ND FLOOR. NEW STACKERS WILL BE LOCATED IN EXACT SAME LOCATION OF THE EXISTING STACKERS BEING REPLACED. NO CHANGE IN TOTAL NUMBER O FSTACKERS OR TOTAL…multifamilyBuilding· Lendlease(US)Construction$980KJul 6
- 325 West 16 Street ManhattanINSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT FOR FACADE INSPECTIONS AND REPAIRS. NO CHANGES IN EGRESS.multifamilyBuilding· SPD Construction Corp—Jul 6
- 1418 Lexington Avenue ManhattanEXISTING COMMERCIAL SPACE, INTERIOR RENOVATION MODIFY PARTITION FOR PROPOSED AT FIRST FLOOR, FINISH PAINTING THROUGHOUT, PLUMBING AND MECHANICAL WORK AT DOB NOW APPLICATION; NO…multifamilyBuilding, HVAC / Mechanical, Plumbing· Zhongshun Jianzhu Inc$117KAug 13
- 1155 6 Avenue ManhattanInterior demolition on 28th marketing floor (27th construction)commercialBuilding· JT Magen & Company Inc$80.3KJul 6
- 233 East 88 Street ManhattanGENERAL INTERIOR RENOVATIONS OF AN APARTMENT 2W. MINOR PARTITION REMOVAL. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding, Plumbing· Deni International Inc$81KJul 13
- 10 Hudson Yards ManhattanBCG-- INTERIOR DEMOLITION INCLUSIVE OF NON-LOADBEARING PARTITIONS AS PER PLANS FILED. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.commercialBuilding· Structure Tone, LLC$135KJul 6
- One Rockefeller Plaza ManhattanInterior reno of non-load bearing partitions, walls, door, ceiling and finishes as indicated on plans.commercialBuilding· JT Magen & Company Inc$603KJul 6
- 67 Wall Street ManhattanFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolamultifamily· Structural Preservation S—Jul 6
- 31 Second Avenue ManhattanREMOVAL OF SOME NON-LOAD BEARING PARTITION WALLS AND CONSTRUCTION OF A NEW SOUND PROOF CEILING.multifamilyBuilding· Vera Forma LLC$50KJul 6
- 180 Park Row ManhattanMinor Interior renovation of existing apartment #2b on the 2nd floor. Architectural / Construction work only.multifamilyBuilding· Lit Group, Inc$36KJul 6
- 140 Broadway ManhattanRemoval and installation of interior non bearing partitions and related finishes as per plans filed for 41st floor.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Swinerton Builders$150KAug 18
- 401 West 31 Street ManhattanSelective demolition and interior alteration for new office tenant. Work to include new non-loading bearing partitions, finishes opening protectives and fixtures. No change in…commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Structure Tone, LLC$6MJul 28
- 1633 Broadway ManhattanRemoval of plumbing and sprinkler fixtures and installation of temporary sprinkler heads. No change in use, egress, or occupancycommercialFire protection, Plumbing· Ashland Plumbing Corp$34.5KJul 10
- 179 East 70 Street ManhattanInterior alteration of existing apartment 11A as shown on submitted plans. No change in occupancy, use or egress.multifamilyBuilding, HVAC / Mechanical· New Amsterdam Builders LL$375KOct 15
- 548 Riverside Drive ManhattanFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolamultifamily· Structural Preservation S—Jul 6
- 1275 York Avenue ManhattanBOBST 4 CARDIOLOGY: PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE THE CARDIOLOGY SUITE RENOVATION THE EXISTING HOSPITAL BUILDING. NO CHANGE TO ZONING, USE, EGRESS OR…commercialFire protection, HVAC / Mechanical· Sirina Fire Prot Corp$450KJul 16
- 500 5 Avenue ManhattanINTERIOR REMOVALS WORK AT 58M/57C PARTIAL FLOOR INCLUDING PARTITION, CEILING AND DOOR REMOVALS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialBuilding· Easy Group Contracting In$45KJul 6
- 214 East 32 Street Manhattaninterior renovation replacement of sheetrock and finishes throughout. combination of two apartments at basement level as per TPPN #3/97multifamilyBuilding· Core Renovation LLC$476KJul 6
- 590 Madison Avenue ManhattanGENERAL CONSTRUCTION WORK TAKING PLACE ON 40TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialBuilding· RXR Construction Serv LLC$34.7KJul 6
- 2 West 45 Street ManhattanProposed interior demolition including bearing and non-bearing partitions, slab openings, convenience stairs, fixtures, finishes, cabinetry, casework, piping and electrical of…commercialBuilding· Premier Interiors NY LLC$280KJul 6
- 712 Fifth Avenue ManhattanModifications to the existing sprinkler system on the 19th floor (Marketing Floor 21) as per plans. No change to use, egress or occupancy.commercialFire protection· Stalwart Plumbing Corp$26KJul 6
- 712 Fifth Avenue ManhattanInstallation of new plumbing fixtures and associated piping on the 19th floor (Marketing Floor 21) as per plans. No change to use, egress or occupancy.commercialPlumbing· Stalwart Plumbing Corp$57KJul 6
- 129 East 69 Street ManhattanINTERIOR RENOVATION OF APARTMENT 10A/11A AS PER PLANS FILED HEREWITH. RELATED PLUMBING WORK FOR THE BATHROOMS FILED UNDER SUBSEQUENT APPLICATION. NO CHANGE TO USE, EGRESS OR…multifamilyBuilding, Plumbing· Copper Plumbing Inc$487KJul 10
- 675 Avenue Of The Americas ManhattanPropose installation of three (3) ADA restrooms and modification & relocation of existing five (5) sprinkler heads & one (1) sprinkler head removal. No change in use, egress or…commercialFire protection· Anesis Mechanical Corp$25.5KJul 6
- 788 Riverside Drive ManhattanInterior renovation for two existing apartments, units 1E & 6D. No apartment combination proposed. No change in use. egress or occupancy.multifamilyBuilding· Vema Core LLC$50KJul 6
- 20 Sutton Place South ManhattanAPPLICATION FILED FOR INTERIOR RENOVATION &RELATED PLUMBING WORK OF APT 20B ON 19THFLOOR. NO CHANGE IN USE, EGRESS OROCCUPANCY UNDER THIS APPLICATION.multifamilyBuilding, Plumbing· Manhattan Cabinets, Inc$200KJul 6
- 230 East 30 Street ManhattanFILING FOR STRUCTURAL WORK FOR THE REPAIR OF THE PARKING GARAGE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding· Mid-State Construction C$132KJul 6
- 67 Wall Street ManhattanPlumbing work for 1st floor tenant fit-out, including new hand sink, 3-compartment sink, mop receptor, undercounter grease interceptor, domestic water, sanitary/waste and vent…multifamilyPlumbing· Reliable PLBG & HTG Corp$25KJul 6
- 67 Wall Street ManhattanMechanical work for 1st floor tenant fit-out, including HVAC ductwork modifications, diffuser/thermostat relocation, air cleaner installation, toilet exhaust connection, air…multifamilyHVAC / Mechanical· Darby Construction SVC LL$65KJul 6
- 407 West 206 Street ManhattanINSTALL EXTERIOR NON-ILLUMINATED D/F BLADE SIGN ON WALL (THE PEOPLE'S THEATRE)multifamilySigns· Active Signs Inc—Jul 6
- 888 Seventh Avenue ManhattanJS Capital / One Madison Prebuild - Structural work on the 39th & 40th floors to remove convenient stair and infill slab as indicated on drawings.commercialBuilding· Clune Construction Co LP$38KJul 6
- 208 East 35 Street ManhattanINTERIOR RENOVATION INCLUDING REPLACEMENT OF ALL INTERIOR NON-LOAD BEARING SHEETROCK WALLS & JOISTS WITHIN EXISTING LOCATIONS. NO CHANGE TO BUILDING LAYOUT. NO CHANGE TO ENVELOPE…multifamilyBuilding, Plumbing· Ross & Associates LLC$130KJul 13
- 206 East 35 Street ManhattanINTERIOR RENOVATION INCLUDING REPLACEMENT OF ALL INTERIOR NON-LOAD BEARING SHEETROCK WALLS & JOISTS WITHIN EXISTING LOCATIONS. NO CHANGE TO BUILDING LAYOUT. NO CHANGE TO ENVELOPE…multifamilyBuilding, Plumbing· Ross & Associates LLC$130KJul 13
- 210 Riverside Drive ManhattanINTERIOR RENOVATION IN APT 2F FILED IN CONJUNSTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.multifamilyBuilding, Plumbing· Bluestone Construction An$184KJul 7
- 888 Seventh Avenue ManhattanJS Capital / One Madison Prebuild - Construction work on the 39th floor as indicated on drawings.commercialBuilding· Clune Construction Co LP$1.6MJul 6