New York City commercial construction projects
61,981 commercial and multifamily projects from New York City’s building permit records (11,164 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 7, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 1185 of 1240
- 720 St Marys Street BronxBuilding rehabilitation of 42 apts, new kitchen and bathrooms, new windows, refinishing apt. floors, scrape, patch & paint apt. walls/ceiling, new build entry/vest. doors, new…multifamilyBuilding· Shamas Contracting Co.Inc$1.9MNov 15
- 90 Bay Street Landing Staten IslandAPPLICATION FILED HEREWITH FOR INTERIOR RENOVATION OF EXISTING APARTMENT # 1E. APPLICATION TO INCLUDE THE ADDITION OF 1 BEDROOM, STUDY AND RENOVATION/RELOCATION OF PLUMBING…multifamilyBuilding· Maximum Contracting Inc$29KNov 15
- 4401 Victory Boulevard Staten Islandinstallation of piles and grade beamscommercialBuilding· Gi Endurant LLC$700KNov 19
- 200 Gulf Avenue Staten IslandApplication filed for structural modification/additional which includes trenching and installing footings and concrete pads for electrical charging stations at exterior parking…commercialBuilding· R.W. Dake & Co.,Inc$350KNov 15
- 40a Willow Avenue Staten IslandREPLACEMENT OF ROOFING AND DOORS OF UNCONDITIONED CLIFTON GATE BOILER BUILDING FOR NATIONAL GRID. PER SECTION 28-105-4.3 OF NYC AC, PUBLIC UTILITY GAS WORK SHOWN IN THE DRAWING…commercialBuilding· Persi Contracting Corp$102KNov 15
- 60 Bay Street Staten IslandHEREWITH FILING INTERIOR RENOVATIONS ON THE 5TH FLR PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.commercialBuilding, HVAC / Mechanical, Plumbing· PFL Mechanical Corp$1.3MNov 15
- 56-50 Myrtle Avenue QueensALTERATION OF EXISTING SPRINKLER SYSTEM IN THE CELLAR, 1ST, 2ND, 3RD, FLOORScommercialFire protection· PLBG P & H Inc$30KNov 15
- 86-70 Francis Lewis Boulevard QueensExterior masonry facade repairs, brick replacement, window sill and lintel replacement, partial roof top parapet replacement.multifamilyBuilding· Sky Tech Rest Corp$601KNov 15
- 65-61 Saunders Street QueensFILING FOR GARAGE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.multifamilyBuilding· LCS Restoration Corp$900KNov 15
- 42-93 Hampton Street QueensRENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER, DRYER, BOILERS AND HOT WATER HEATERS IN…multifamilyPlumbing· Catman Plumbing Inc$40KNov 15
- 15-78 Bell Boulevard QueensMINOR INTERIOR ALTERATION. NEW SPLIT SYSTEM HVAC, RENOVATE KITCHEN AND BATHROOMS,PARTITIONS, KITCHEN CABINETS, DOORS, TRIM AND FINISHES AS PER PLAN. NO CHANGE TO USE, EGRESS OR…multifamilyBuilding, Plumbing· Jana Builders Corp$116KSep 23
- 73-44 Austin Street QueensINSTALLING A BETA MAX HOIST IN ORDER TO PERFORM EXTERIOR REPAIRS. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.multifamilyBuilding· Lucky K. Contracting Co—Nov 15
- 18-01 20 Avenue QueensAlteration to the water supply piping within city water meter houses A and B toinclude backflow prevention (BFP) to comply with NYC DEP code requirements.commercialPlumbing· Richmond PLBG & HTG Co In$600KNov 15
- 12-36 31 Drive QueensPROPOSED FOUNDATION AND EXCAVATION WORK FOR A 3-STORY BUILDING INTERIOR RENOVATION.multifamilyBuilding· Royalty Const Group Inc$39KNov 15
- 37-20 Prince Street QueensRENOVATION OF EXISTING COMMERCIAL SPACE IN THE FIRST FLOOR UNIT #1A ONLY:INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES.REPLACE ADA RESTROOM AS PER PLAN. NO CHANGE IN USE, EGRESS OR…multifamilyBuilding· Kale Construction Inc$32KNov 15
- 141-30 Pershing Crescent QueensREGISTER FIXTURES &EQUIPMENT IN TWO (2) LAUNDRY ROOMS.multifamilyPlumbing· Maxwell Plumb Mech. Corp$32KNov 15
- 66-60 Fresh Pond Road QueensSUPPORT OF EXCAVATION FOR UTILITY AND WATER PROOFINGINSTALLATIONS.commercial· Concept Construction Serv$35KNov 15
- 35-25 34 Street QueensREPLACE BOILER AND BURNER.multifamilyBuilding, HVAC / Mechanical· G. Bauer, Inc$150KApr 1
- 129 Beach 118 Street QueensBRICK POINTING AND REPLACEMENT ON FACADE. REPLACE LINTEL, WINDOW SILL AND CAULKING OF EXISTING WINDOWS. SCRAPE OFF FLAKING PAINT, PRIME, REPAINT ALL EXISTING FIRE ESCAPE AND THE…multifamilyBuilding· KNS Building Rest. Inc$609KNov 15
- 35-02 35 Street QueensREPLACE BOILER AND BURNER AND CHANGE GRADE OF FUEL OIL FROM #4 TO #2.multifamilyBuilding, HVAC / Mechanical· G. Bauer, Inc$160KApr 1
- 144-44 Sanford Avenue QueensREPLACE BOILER AND GAS/OIL BURNER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.multifamilyHVAC / Mechanical· Cam Energy HTG And Mech$120KNov 15
- 33-00 Northern Boulevard QueensFILING PL FOR INTERIOR TENANT FIT OUT ON THE 1ST AND 5TH FLOORS ALONG WITH INSTIALLATION OF GAS RISER AND 2 GAS GENERATORScommercialPlumbing· Aspro Plumbing, Inc$155KNov 15
- 6-38 Nasby Place QueensRENOVATION OF REAR FACADE AND RAMP IN REAR TO RESOLVE VIOLATION #34713545L.multifamilyBuilding· R.N.K. Romeo Const Inc—Nov 15
- 67-71 Yellowstone Boulevard QueensREPLACEMENT OF GAS LINES AND REPLACEMENT OF APPLIANCE VALVES IN RESIDENTIAL APARTMENTS 3A, 4A, 6A, 7A, 2B, 3B, 4B, 6B, 3C, 4C, 5G, 7G, 3H, 4K, & 3T. THIS APPLICATION IS IN…multifamilyBuilding, Plumbing· Demar Mechanical Inc$135KNov 27
- 47-05 Newtown Road QueensINSTALLATION OF SOLAR PANELS ON ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.multifamilySolar· Sunco Capital LLC$31.9KNov 15
- 122-02 Roosevelt Avenue QueensNew mechanical/hvac system for existing building including heating systems, air condition and ventilating systems and energy efficiencycommercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Sirina Fire Prot Corp$245KMay 7
- 220-25 147 Avenue QueensDUCT WORK AND LEGALIZATION OF EXISTING HVAC UNIT ON THE ROOF AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.commercialHVAC / Mechanical· J.V.S. Sprint Enterprises$123KNov 15
- 587 Onderdonk Avenue QueensInterior renovation as shown on plans filed herewith.multifamilyBuilding· Bee Constructions LLC$94.9KNov 15
- 41-35 45 Street QueensReplacement of the existing entryway portico assembly including the decking, parapet, roofing and ornament. No structural concrete work. No change to egress of occupancy. No…multifamilyBuilding· A W R Group Inc$141KNov 15
- 66-60 Kissena Boulevard QueensSCIENCE BUILDING: ALTERATION OF EXISTING LABS ON 2ND FLOOR WING E: NEW PARTITIONS AND DOORWAYS FOR NON-PRODUCTION LAB. NEW FURNITURE/CASEWORK. NEW INTERIOR FINISHES. NO CHANGE TO…commercialBuilding· Cauldwell Wingate Co LLC$1.8MNov 15
- 130-29 Merrick Boulevard QueensExterior plumbing only for water and sewer as per the approved Site connectioncommercialPlumbing· NYC Mainman Corp$50KNov 15
- 144-06 135 Avenue QueensHEREBY FILING FOR NEW 14 STORY R-1 HOTEL BUILDINGcommercialBuilding· LGTB Management Inc$1MNov 15
- 2690 Frederick Douglass Boulevard ManhattanInstallation of new fire sprinkler system in the space as per plans. NO CHANGE IN USE OR EGRESS UNDER THIS APPLICATION.multifamilyFire protection· Sirina Fire Prot Corp$777KNov 15
- 351 West 38 Street ManhattanSUSPENDED SCAFFOLD AS PER DRAWINGS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.commercial· S&E Bridge & Scaffold LLC—Nov 15
- 643 Park Avenue ManhattanINSTALLATION OF TEMPORARY AUDIENCE SEATING TIERS.commercialBuilding· Premier Stagehands, Inc$73.1KNov 15
- 1250 Broadway ManhattanAT 15TH FLOOR TENANT SPACE, INSTALLATION OF INTERIOR NON BEARING PARTITIONS, CEILING, AND FLOORING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.commercialBuilding· Art + 1, Inc$94KNov 15
- 110 West 90 Street ManhattanINSTALLATION OF TEMPORARY MATERIAL HOIST EQUIPMENT (COUNTERWEIGHTED SYSTEM)..multifamily· Central Construction MGMT—Nov 15
- 787 Seventh Avenue ManhattanModifications to the existing HVAC system on the (37th Floor- WTF Mockup) as per plans. No change to use, egress or occupancy.commercialHVAC / Mechanical· James E Fitzgerald Inc$34.5KNov 15
- 1211 Avenue Of Americas ManhattanSprinkler demolition and relocates as per plans filed herewith. No change in use, egress, or occupancycommercialFire protection· Abco-Peerless Sprklr Corp$175KNov 15
- 125 East 74 Street ManhattanInstallation of a suspended scaffold for the penthouse terrace roof replacement, as per plans. No change to egress or occupancy.multifamilyRoofing· Prat Enterprises, Corp—Nov 15
- 17 Chittenden Avenue ManhattanSuspended Scaffold Installation For Facade Restoration And Inspectionmultifamily· Peaq Restoration, LLC—Nov 15
- 1535 Third Avenue ManhattanERECT AN ILLUMINATED BUSINESS ACCESSORY BLADE SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.multifamilySigns· Going Sign & Svcng Co,Inc—Nov 15
- 104 West 29 Street ManhattanGeneral construction modifications for interior demo work to the 12th floor as per plans filed herewith. No change in use egress or occupancy.commercialBuilding, Plumbing· Arista Electric Corp$27.5KApr 17
- 1370 Avenue Of The Americas ManhattanMechanical modifications taking place on the 18th floor (19th floor marketing) as per drawings filed herewith. No change in use, egress or occupancy.commercialHVAC / Mechanical· Rinnovo Construction, LLC$85.1KNov 15
- 80 Nassau Street ManhattanTO INSTALL A MOVABLE SUSPENDED SCAFFOLDING SYSTEM AT THE ROOFmultifamilyRoofing· Quintuna Service Corp—Nov 15
- 15 Dutch Street ManhattanTO INSTALL A MOVABLE SUSPENDED SCAFFOLDING SYSTEM AT THE ROOF.multifamilyRoofing· Quintuna Service Corp—Nov 15
- 131 Barrow Street ManhattanINTERIOR RENOVATION IN AN EXIST'G. APT 1A: KITCHEN AND BATHROOM RENOVATION, REPLACEMENT WINDOWS IN EXIST'G. OPENING, INSTALL (5) TONS SPLIT HEAT PUMP (3) ZONES HVAC UNIT, FLOOR…multifamilyBuilding, HVAC / Mechanical, Plumbing· Acs Environmental & Const$75.7KNov 21
- 1225 1 Avenue ManhattanRENOVATION OF AN EXISTING DUNKIN' DONUTS STORE ON 1ST FLOOR OF AN EXISTING BUILDING. REPLACE EXISTING CEILING & FLOOR TILES, LIGHTING FIXTURES, & WALL FINISHES AS NEEDED.INSTALL…multifamilyBuilding, Plumbing· All American Construction$140KNov 18
- 45 East 72 Street ManhattanPartition alterations; new cabinetry; new finishes. No change of use, egress or occupancy.multifamilyBuilding· Interiors By Glen LLC$25KNov 15
- 125 Park Avenue ManhattanMinor demolition with installation of new partitions, doors, ceilings and finishes on the 18th floor (TD Bank Offices) as per plans. No change to use, egress or occupancy.commercialBuilding· JT Magen & Company Inc$1.7MNov 15