New York City commercial construction projects
61,981 commercial and multifamily projects from New York City’s building permit records (11,164 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 7, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 1163 of 1240
- 139 East 57 Street ManhattanGROUND FLOOR RETAIL INTERIOR UPGRADES FOR ALTERATION TYPE 2. WORK LIMITED TO INTERIOR RETAIL WORK ONLY ON APPROXIMATELY 1,200 GSF OF IMPACTED RETAIL AREA.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Pristine Air Conditioning$350KApr 8
- 512 7 Avenue ManhattanGeneral construction modifications as per plans filed herewith. No change in use, egress or occupancy.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Dhi Construction SVCS Inc$862KDec 2
- 55 East 9 Street ManhattanREPLACEMENT (8) NEW ELECTRIC CHILLERS, (3) NEW PUMPS AND NEW ELECTRIC SERVICE UPGRADE. REMOVE EXISTING STEAM ABSORPTION CHILLER. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR…multifamilyHVAC / Mechanical· Crystal Comfort Inc$790KNov 27
- 885 2 Avenue ManhattanPARTIAL FLOOR TENANT INTERIOR IMPROVEMENTS TO THE 5TH FLOOR OF AN EXISTING 46 STORY BUILDING. SCOPE OF WORK INCLUDES UPDATING FIXTURES, EQUIPMENT AND FINISHES AT THE MEN'S…commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· A.W. & S. Construction Co$900KDec 3
- 1539 Lexington Avenue ManhattanFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Nov 27
- 1536 Lexington Avenue ManhattanFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Nov 27
- 28 Liberty Street ManhattanApplication filed herewith for Exterior stair renovation as per plans filed herewith. No change to use, egress or occupancy.commercialBuilding· John Gallin & Son, Inc$313KNov 27
- 60 Riverside Boulevard ManhattanInstallation of trellis on existing 19th Floor Roof Terrace (Apartment 2102) as per plans. No change to use egress or occupancy on this filing.multifamilyBuilding· Nicon Build LLC$55KNov 27
- 2750 Broadway Manhattancombine 2752 & 2750 into one space, make opening in wall and remove toilets. install new toilet in 2752 space, no change to use ,egress or occupancymultifamilyBuilding, Plumbing· HNL Construction Company$55KDec 11
- 218 West 10 Street ManhattanRENOVATE AND REMODEL THE EXISTING GROUND FLOOR COMMERCIAL RETAIL SPACE. INSTALL NEW DISPLAY UNITS. RELOCATE AND INSTALL NEW CEILING REGISTERS AND LIGHT FIXTURES. NO CHANGE IN…multifamilyHVAC / Mechanical· Valcourt Consulting And D$94.2KNov 27
- 846 6 Avenue ManhattanFiling herewith drawings indicating new and modified mechanical system. No change in use, egress, or occupancy under this application.multifamilyHVAC / Mechanical· TPG Contractors Corp$110KNov 27
- 399 Park Avenue Manhattanremoval and instillation of interior non load bearing partitions and related finishes. No changes to use, egress or occupancycommercialBuilding· Structure Tone, LLC$170KNov 27
- 119 Elizabeth Street ManhattanSELECTIVE INTERIOR RENOVATION OF 10 APT'S: #8, #11, #17 (FRONT); AND #3, #4, #27, #30, #36, #39, #44 (REAR) ON AN EXIST 6 STORY BLDG MIX-USE. & RESTORE TO PRE-EXIST. CONDITIONS…multifamilyBuilding, Plumbing· HT Plumbing & Heating Cor$302KDec 19
- 1 Penn Plaza ManhattanMechanical work on the 17th floor (Liuzzo) as indicated on drawings.commercialHVAC / Mechanical· Vanguard Construction And$34.2KNov 27
- 336 West End Avenue ManhattanGENERAL CONSTRUCTION RENOVATION OF APARTMENT 17AF ON THE 17TH FLOOR. AS PER PLANS FILED. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.multifamilyBuilding, HVAC / Mechanical, Plumbing· Renovyt, Inc$409KNov 27
- 215 West 98 Street ManhattanMODIFICATION OF HVAC SYSTEM.multifamilyHVAC / Mechanical· Peter Simon Restoration.C$120KNov 27
- 328 West 86 Street ManhattanKITCHEN RENOVATION; NEW WALL AND FLOOR FINISHES, AND NEW CABINETS, NO CHANGE TO USE, OCCUPANCY OR EGRESS.multifamilyBuilding· Raymond Romano Inc$65KNov 27
- 14 Elizabeth Street ManhattanINTERIOR RENOVATION OF THE OFFICE SPACE ON 3RD FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialBuilding, HVAC / Mechanical, Plumbing· Eurostruct Inc$455KMar 3
- 4660 Broadway ManhattanModification to interior partitions and finishes as per plans. Filed in conjunction with related fitout applications: M01108467-S1, S2, S3, S4.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Gdi Construction LLC$1.8MApr 1
- 1535 Broadway ManhattanMODIFICATION TO EXISTING MCHANICAL SYSTEM AND RELATED DUCT WORK AS SHOWN ON DRAWIGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.commercialHVAC / Mechanical· Capital Builders Group In$25KNov 27
- 1359 Broadway ManhattanDEMOLITION TAKING PLACE ON THE 12TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialBuilding· Finaly Genl Contr Corp$110KNov 27
- 222 East 64 Street ManhattanNorthwell New MEETH Emergency Generator & Quick Connect Project: installation of fuel oil piping at above premises, for new Emergency Generator @ Roof level, as per plans filed…commercialHVAC / Mechanical· Boilermatic Weldng Inds I$163KNov 27
- 366 Madison Avenue ManhattanREPLACE ONE (1) 15-TON WATER COOLED HEAT PUMP UNIT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialHVAC / Mechanical· Sound Refrigeration & Air$74KNov 27
- 301 6 Avenue ManhattanInstallation of new plumbing fixtures and new equipment to accommodate Carvel & Cinnabon. No change to bulk, use, egress occupancy or floor area under this application.multifamilyPlumbing· Accurate Mechanical Inc$60KNov 27
- 1316 2 Avenue ManhattanEXISTING COMMERCIAL SPACE, MECHANICAL SYSTEM IN CONJUNCTION WITH JOB #M01102757, OBTAIN MECHANICAL PERMIT FOR THE INSTALL NAIL SALON VENTILATION SYSTEM AND HVAC SYSTEM WORKS.multifamilyHVAC / Mechanical· Zhongshun Jianzhu Inc$27KNov 27
- 150 West 30 Street ManhattanAPPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 14TH FLOOR (SUITE 1400) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,…commercialBuilding· Brace Construction LLC$210KNov 27
- 1 Rockefeller Plaza ManhattanDemolition and interior renovations / modifications as per plans filed herewith. No change to use, egress or occupancy.commercialBuilding· A.W. & S. Construction Co$900KNov 27
- 237 Park Avenue ManhattanGENERAL CONSTRUCTION TAKING PLACE ON 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialBuilding· Spring Build LLC$250KNov 27
- 1016 5 Avenue ManhattanRENOVATION OF AN EXISTING APARTMENT. INTERIOR WORK TO INCLUDE RELOCATION OF INTERIOR PARTITIONS, RELOCATION/REFITTING OF ALL BATHROOMS & REFITTING OF KITCHEN. PLUMBING AND…multifamilyBuilding, HVAC / Mechanical, Plumbing· Meg II Design LLC$205KJan 8
- 125 West End Avenue ManhattanFiling for modifications to associated ducts and piping of existing mechanical system for fit-out of office and non-production laboratory as per plans filed herewith. No change…commercialHVAC / Mechanical· JRM Construction MGMT LLC$1.6MNov 27
- 529 5 Avenue ManhattanFILED HEREWITH NEW PARTIAL INTERIOR & EXTERIOR WORK, AS PER PLANS FILED ON THE 1ST & 2ND FLOOR LEVEL & FACADE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.commercialBuilding· A.W. & S. Construction Co$1.8MNov 27
- 131 Thompson Street Manhattansuspended scaffold installation as per plans filed herewith.multifamily· Pofi Construction Corp—Nov 27
- 115 5 Avenue ManhattanMODIFICATION TO EXISTING PLUMBING SYSTEM AS PER PLANS ARITZIA SPACE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. Tenant improvement for three levels of the building. Installation of…commercialPlumbing· A Plus Plumbing Corp$250KNov 27
- 1 Penn Plaza ManhattanConstruction work on the 44th floor (corridors and restrooms) as indicated on drawings.commercialBuilding· Benchmark Builders LLC$652KNov 27
- 119 East 54 Street ManhattanPlans filed herewith for facade repairs.commercialBuilding· Volmar Construction Inc$28.4KNov 27
- 63 East 9 Street Manhattancombine apt 6X and Y as one apt ,renovation as per plans , new bedroom . replace bathtub with sower , new kitchen , cabinet as per plans , no change in use, egress or occupancymultifamilyBuilding, Plumbing· GT Development Enterprise$102KDec 3
- 919 3 Avenue ManhattanPLUMBING MODIFICATIONS ON THE 3RD FLOOR PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialPlumbing· Mac Felder Inc$70KNov 27
- 919 3 Avenue ManhattanSPRINKLER AND STANDPIPE MODIFICATIONS ON THE 31ST - 32ND (32ND AND 33RD MARKETING) FLOORS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialFire protection· Par Fire Protection LLC$378KNov 27
- 919 3 Avenue ManhattanPLUMBING MODIFICATIONS ON THE 31ST - 32ND (32ND AND 33RD MARKETING) FLOORS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialPlumbing· Mac Felder Inc$540KNov 27
- 407 Lenox Avenue ManhattanProposed mechanical works for existing commercial as shown on plan in conjunction to general construction works. No change in use, egress and occupancy.multifamilyHVAC / Mechanical· D.P. Group General Contra$110KNov 27
- 919 3 Avenue ManhattanSPRINKLER AND STANDPIPE SYSTEM MODIFICATIONS ON THE 30TH FLOOR (31ST MKTG FL) PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialFire protection· Par Fire Protection LLC$236KNov 27
- 256 West 47 Street ManhattanREMOVE EXISTING COOLING TOWER. INSTALL 100 TON ROOFTOP UNIT WITH ASSOCIATED DUCTWOK, INSTALL A 20 TON AIR HANDLER CONNECTING TO TWO 10 TON CONDENSING UNITS,. INSTALL 2-5 TON…commercialHVAC / Mechanical· D&E Refrigeration & Air C$895KNov 27
- 60 West 125 Street ManhattanSUBSEQUENT FILING FOR JOB# M01049186-I1. INSTALL PLUMBING FIXTURES, COOKING EQUIPMENT & MODIFY EXISTING SPRINKLER SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyPlumbing· Tri State PLBG & HTG Inc$68.3KNov 27
- 411 9 Avenue ManhattanPROPOSED INTERIOR RENOVATION IN EXISTING 1ST FL COMMERCIAL SPACE, FOR DELICATESSEN WITH NEW COMMERCIAL KITCHEN. INSTALL NEW INLINE EXHAUST FAN FOR COMMERICAL HOOD. PLUMBING TO BE…multifamilyBuilding· Mamc Consulting Reps LLC$124KNov 27
- 965 5 Avenue ManhattanInstallation of new and relocated plumbing fixtures and associated piping for apartment novation in conjunction with GC #:: M01046416. No change in use, egress, or occupancy.multifamilyPlumbing· Orbit PLBG & HTG Inc$50KNov 27
- 965 5 Avenue ManhattanMechanical plans filed herewith to show new air conditioning and ventilation installation for apartment renovation in conjunction with GC #: M01046416. No change to use, egress,…multifamilyHVAC / Mechanical· Central Air Conditioning$120KNov 27
- 1 Madison Avenue ManhattanInstallation of interior non bearing partitions as per plans filed herewith. Exterior partial replacement of existing curtain wall with glass doors to terrace. No change in use,…commercialBuilding· JT Magen & Company Inc$16MNov 27
- 240 West 44 Street ManhattanRemove chimney as per plan . No other changes. No change to egress occupancy or use involved in this application.commercialBuilding· Nova Construction Service$99.7KNov 27
- 152 West 36 Street ManhattanREMOVAL OF STRUCTURAL ELEMENTS AND ADDITION OF CONCRETE REINFORCEMENT OF STRUCTURAL FRAMING PER PLANS. Application filed in conjunction with M01001558-I1 (GC), M0100158-S1 (MS)…commercialBuilding, HVAC / Mechanical· JRM Construction MGMT LLC$1.3MSep 29
- 250 West 23 Street Manhattanfull demolition of three story structure, using hand held and mechanical means to assistcommercialDemolition, HVAC / Mechanical· Titan Industrial SVC Corp$305KNov 27