61,981 commercial and multifamily projects from New York City’s building permit records (11,164 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 7, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 1153 of 1240
- 190 6 Avenue ManhattanPROPOSE INTERIOR RENOVATION OF APT#2FN,2FS ON EXISTING BUILDING, CONSTRUCTIONS WORKS AS PER PLAN. NO CHANGE ON EGRESS USE OR OCCUPANCY.multifamilyBuilding, Plumbing· Badger Management Inc$27KDec 5
- 200 East 94 Street ManhattanInstallation of suspended scaffold for facade work or inspectionmultifamily· Citiline Restoration LLC—Dec 4
- 300 East 34 Street ManhattanREPLACE VENTING SYSTEM FOR EXSTING WATER HEATERS.multifamilyBuilding· Ariston Chimney LLC$35KDec 4
- 101 Post Avenue ManhattanREPLACE BOILER AND GAS/OIL BURNER.multifamilyHVAC / Mechanical, Plumbing· Approved Oil Co Of Bklyn$310KDec 5
- 200 Varick Street ManhattanFILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.commercial· Tribute Restoration Inc—Dec 4
- 240 West 75 Street ManhattanInstallation of suspended scaffold for facade work or inspectionmultifamily· Dna Contracting LLC—Dec 4
- 250 West 19 Street ManhattanInstallation of suspended scaffold for facade work or inspectionmultifamily· Lawrence Exterior Rest Co—Dec 4
- 850 7 Avenue ManhattanInstallation of suspended scaffold for facade work or inspectioncommercial· Preserv Building Restorat—Dec 4
- 340 East 29 Street ManhattanInstallation of suspended scaffold for facade work and/or inspection. Amend #1, added scaffold dropmultifamily· Preserv Building Restorat—Dec 4
- 31 West 27 Street ManhattanFiling for General construction modifications including installation of interior non-load-bearing partitions, doors, and related finishes and ceiling modifications to the 6th…commercialBuilding, HVAC / Mechanical· Savcon Construction LLC$178KDec 4
- 165 West 66 Street ManhattanFiling for minor interior renovation of the Apt#14A. Remove and install non-load bearing partition, finishes etc. No change in use, egress or occupancy.multifamilyBuilding· Techcrew Inc$102KDec 4
- 1177 Avenue Of The Americas ManhattanRemoval of HVAC duct work as per plans filed herewith.commercialHVAC / Mechanical· Structure Tone, LLC$62.2KDec 4
- 1177 Avenue Of The Americas ManhattanRemoval of non load bearing partitions as per plans filed herewith.commercialBuilding· Structure Tone, LLC$250KDec 4
- 1177 Avenue Of The Americas ManhattanRemoval of non load bearing partitions as per plans filed herewith.commercialBuilding· Structure Tone, LLC$119KDec 4
- 51 Astor Place ManhattanInterior demolition for 4th floorcommercialBuilding· Verus Inc$250KDec 4
- 407 East 61 Street ManhattanInstallation of suspended scaffold for facade work or inspectioncommercial· Dna Contracting LLC—Dec 4
- 17 East 89 Street Manhattanrenovation of existing apt# 3B with interior removal, new partitions and interior finishes; new openings to install a/c sleeves. no change in use, egress or occupancy.multifamilyBuilding, HVAC / Mechanical, Plumbing· S & T Construction Inc$136KJan 15
- 31 West 27 Street ManhattanFiling for General construction modifications to the 10th floor as per plans filed herewith. No change in use, egress, or occupancy.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Savcon Construction LLC$726KDec 11
- 168 Mercer Street ManhattanColumn Replacement, Footing Expansion, Wall Lateral Bracing, Slab Opening, Minor Pit design, Stair ReframingmultifamilyBuilding· TMG Construction Corp$140KDec 4
- 50 West 57 Street ManhattanStructural repairs on the Cellar, 1st floor, Mezzanine and Mezzanine Ceiling as indicated on drawings.commercialBuilding· John Gallin & Son, Inc$469KDec 4
- 55 East 99 Street ManhattanFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Dec 4
- 183 East 98 Street ManhattanFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Dec 4
- 237 Park Avenue ManhattanMECHANICAL MODIFICATIONS TAKING PLACE ON BASEMENT & 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialHVAC / Mechanical· Spring Build LLC$100KDec 4
- 180 West 58 Street ManhattanInterior renovation of existing class A apartment. No change of use, egress or occupancy under this application.multifamilyBuilding· Telia Contracting Corp$100KDec 4
- 125 Park Avenue ManhattanModifications to the existing sprinkler system on the 18th floor (TD Bank Offices) as per plans. No change to use, egress or occupancy.commercialFire protection· Psi Partners, LLC$75KDec 4
- 425 Park Avenue ManhattanGENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 28TH CONSTRUCTION FLOOR (34TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialBuilding· JRM Construction MGMT LLC$803KDec 4
- 601 West 26 Street Manhattansprinkler modifications on floors MZ2 and 7 as per plans filed herewith. no changes in use. egress or occupancy.commercialFire protection· KG Sprinkler Corp$185KDec 4
- 601 West 26 Street ManhattanGeneral plumbing modifications on floors 5-7 as per plans filed herewith. No changes in use, egress or occupancy.commercialPlumbing· Donato Plumbing, Inc$160KDec 4
- 541 East 68 Street ManhattanGP 7 Backfill: PLUMBING AND SPRINKLER REMOVALS TO ACCOMMODATE THE GP7 RENOVATION, GREENBERG PAVILION IN THE EXISTING HOSPITAL BUILDING.commercialFire protection, Plumbing· Sirina Fire Prot Corp$273KDec 16
- 274 3 Avenue ManhattanRenovate First Floor commercial space. Remove non-structural walls and fit out space for grocery store. No change in use, occupancy, bulk or egress.multifamilyBuilding· Iiemar LLC$95KDec 4
- 505 5 Avenue Manhattaninstallation of sprinkler fixtures along with related piping.commercialFire protection· Midnight Express Mech CRP$91KDec 4
- 167 West 23 Street ManhattanREMOVAL/ ALTERATION OF INTERIOR WALL AS PER PLANSmultifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· The Cloone Group Inc$28.5KFeb 18
- 611 West 156 Street ManhattanFACADE RESTORATION WORK AS PER INDICATED ON PLAN AND ADDRESS THE ECB VIOLATION NUMBER: 35682239K, 35685417H, 35683963X. THERE WILL BE NO CHANGE IN THE USE, EGRESS OR OCCUPANCY…multifamilyBuilding· Eden General Constr Inc$40KDec 4
- 322 East 59 Street ManhattanREAR PARAPET REBUILD. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATIONmultifamilyBuilding· I G H Restoration LLC$51KDec 4
- 153 East 87 Street ManhattanINTERIOR RENOVATION TO UNIT 7C. NO CHANGE TO OCCUPANCY, USE GROUP, OR EGRESS.multifamilyBuilding, Plumbing· Stonecore LLC$272KDec 10
- 180 Maiden Lane ManhattanGeneral Construction taking place on the 29th, 30th and 31st floors as per plans filed herewith. No change in Use, Egress or Occupancy.commercialBuilding· C&M Drywall & Acoustic Co$801KDec 4
- 113 Spring Street ManhattanSprinkler modifications to the Cellar and 1st floor as per plans filed herewith. No change in use, egress, or occupancy.commercialFire protection· Real Plumbing Corp$65KDec 4
- 113 Spring Street ManhattanPlumbing modifications to the cellar and 1st floor as per plans filed herewith. No change in use, egress, or occupancy.commercialPlumbing· Real Plumbing Corp$125KDec 4
- 205 West End Avenue ManhattanFILING FOR COMBINATION OF CO-OP APT. 29R&29P ON 29TH FLR. WORK INCLUDES REMOVAL OF NON-STRUCTURAL INTERIOR WALLS. CHANGES TO LAYOUT OF KITCHEN. RELOCATING PLUMBING FIXTURES.…multifamilyBuilding, HVAC / Mechanical, Plumbing· Tbro's Renovation Inc$760KDec 12
- 305 East 72 Street ManhattanREMOVE INTERIOR PARTITIONS IN UNIT 2A, AND CREATE TWO NEW BEDROOMS, THREE NEW BATHROOMS, AND A NEW KITCHEN.multifamilyBuilding, HVAC / Mechanical, Plumbing· Zcrew Construction Corp$172KDec 19
- 28 East 28 Street ManhattanDemolition of all existing ductwork serving the area of scope.commercialBuilding· Schimenti Construction Co$50KDec 4
- 28 East 28 Street ManhattanDemolition of interior non-bearing partitions, ceilings flooring and finishescommercialBuilding· Schimenti Construction Co$275KDec 4
- 8 Stone Street ManhattanREPLACE EXISTING BOILERS WITH TANKLESS WATER HEATERS IN ROOF MECHANICAL ROOMcommercialPlumbing· Pa Mechanical SVCS LLC$80KDec 4
- 11 East 26 Street ManhattanGENERAL CONSTRUCTION MODIFICTIONS ON THE 2ND AND 3RD FLOORS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialBuilding· James E Fitzgerald Inc$2MDec 4
- 615 West 131 Street ManhattanLimited interior renovation to the 6th floor and roof in Studebaker to include new partitions, doors, flooring lightning, and finishes as indicated on the plans filed herewith.…commercialBuilding, HVAC / Mechanical, Plumbing· Structure Tone, LLC$15.9MApr 21
- 132 Greene Street Manhattan#8736 - Plumbing modifications in existing use group 6 space. no change in egress, use, or occupancy.multifamilyPlumbing· Sean Coakley P & H Inc$200KDec 4
- 225 East 45 Street ManhattanEQUIPMENT USE: INSTALLATION OF DUAL 7000# CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE,…multifamilyHVAC / Mechanical· Rockledge Scaffold Corp$31KMay 23
- 240 West 44 Street Manhattanrevised beam geometry due to field conditions as per plans . No other changescommercialBuilding· Nova Construction Service$115KDec 4
- 250 West 81 Street ManhattanFILING HEREWITH PARTITION MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding· Gotham GC Corp$60KDec 4
- 10 Monroe Street ManhattanTEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD FOR FACADE INSPECTION & REPAIR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Cesar QuitomultifamilyBuilding· Structual Presv System—Dec 4