New York City commercial construction projects
61,981 commercial and multifamily projects from New York City’s building permit records (11,164 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 7, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 1135 of 1240
- 328 West 86 Street ManhattanGENERAL PLUMBING MODIFICATIONS PER PLANS FILED, NO CHANGE IN OCCUPANCY USE OR EGRESSmultifamilyPlumbing· Odyssey Plmbg & HTNG Corp$32KDec 13
- 618 West 181 Street ManhattanHEREBY FILING FOR HVAC UNIT ON THE ROOF. NO CHANGE TO USE OCCUPANCY OR EGRESS.commercialHVAC / Mechanical· Metro Mechanical Group$35KDec 13
- 592 3 Avenue ManhattanAPPLICATION FILED FOR INTERIOR RENOVATION OF A EXISTING RESTAURANT AND TO INSTALL NEW HOOD AN EXHAUST SYSTEM AND HVAC SYSTEM ON AN EXISTING MIXED USE BUILDINGS AS PER PLANS…multifamilyBuilding· Valntino Construction Cor$98KDec 16
- 74 Grand Street ManhattanGENERAL CONSTRUCTION ASSOCIATED WITH THE RENOVATION OF EXISTING SPACE. MECHANICAL, ELECTRICAL, PLUMBING MODIFICATIONS TO BE FILED SUBSEQUENTLY. NO CHANGE IN EGRESS, OCCUPANCY,…multifamilyBuilding, Plumbing, Signs· Capital Improvement Servi$127KMay 8
- 180 Madison Avenue ManhattanReplacement of air conditioning units in the Bank area. No change in use egress and occupancy.commercialHVAC / Mechanical· Emcor Services NY/NJ Inc$30KDec 13
- 301 West 45 Street ManhattanCENTRAL PLANT RISER DIAGRAM- REPLACEMENT OF EXISTING PIPING RISERS, AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.multifamilyHVAC / Mechanical· Heat Inc$352KDec 23
- 1025 Fifth Avenue ManhattanPlumbing work for Apt 12EN, as per plans filed herewithmultifamilyPlumbing· A.M.N. Corporation$30KDec 13
- 176 East 71 Street ManhattanMODERATE INTERIOR RENOVATION OF UNIT 8C ONLY. NO CHANGE IN USE, OCCUPANCY OR EGRESSmultifamilyBuilding· D.P. & Son Painting Inc$68KDec 13
- 5 East 59 Street ManhattanPartial demolition of structural components, steel columns, beams, load bearing walls as per plans. Temporary shoring during partial demolition work as per planscommercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Volk Industrial Services$900KMar 31
- 170 East End Avenue ManhattanAPT 2D RPRS, INCLDS REMOVE & RPL EXTG FINISHES ON NOTED PARTITIONS & CEILINGS, REMOVE & RPL HARDWOOD FLRS, & INSTALL CABINETS AS PER PLANS. NO STRUCT WORK, NO CHANGE TO EXTG…multifamilyBuilding, Plumbing· Environmental Appraiser &$100KSep 23
- 575 Lexington Avenue ManhattanStructural modifications as per plans filed herewith. NO change in use, egress or occupancy.commercialBuilding· Petretti & Associates LLC$450KDec 13
- 525 West 22 Street ManhattanIn conjunction with Interior renovation of existing unit on the 5th Floor. Plumbing work only.multifamilyPlumbing· Arcon PLBG Solutions$202KDec 13
- 1251 6 Avenue ManhattanGeneral construction work related to restaurant fit-out. No change to use, egress or occupancy.commercialBuilding, HVAC / Mechanical, Plumbing· Certified Of N.Y. Inc$5.8MJan 2
- 229 East 42 Street ManhattanStructural work as shown on the plans for courtyard demo.multifamilyBuilding· MB Boro Construction Corp$950KJun 5
- 333 East 38 Street ManhattanNYU - Infrastructure Package - INFRASTRUCTURE MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH AND NEW ELEVATOR BULKHEAD. NO CHANGE TO USE, EGRESS OR OCCUPANCY.commercialBuilding· Tishman Construction Corp$6.5MDec 13
- 328 Albany Street ManhattanNEW PLUMBING WORK APT #T AN . IN CONJUNCTION WITH # M01059468multifamilyPlumbing· Hydrokinetic PLBG & HTG I—Dec 13
- 233 Water Street ManhattanGeneral construction to change existing use from school to office on the 1st floor and single family dwelling on the 2nd floor. Work to include interior partitions, storefront…commercialBuilding· Fine Craftsman Group LLC$400KDec 13
- 10 Vanderbilt Avenue ManhattanInstallation of new plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy.commercialPlumbing· CM Plumbing Inc$300KDec 13
- 980 6 Avenue ManhattanStorefront work on the ground floor as shown on the plans. NO CHANGE IN USE, EGRESS OR OCCUPANCYmultifamilyBuilding· VBG 990 Aoa LLC$100KDec 13
- 425 East 58 Street ManhattanFiling herewith for the design and documentation of structural modifications and support of the new vault and network protector room.multifamilyBuilding· C.A.C. Industries, Inc$745KDec 13
- 330 East 39 Street ManhattanCONSTRUCT AN ENCLOSED ADA LIFT SHAFT. WORK INVOLVE TO CREATE AN OPENING AT ROOF LEVEL ABOVE PH. M . AND CONSTRUCT THE ROOF ENCLOSURE . ALL AS PER PLAN . NO CHANGE IN USE EGRESS…multifamilyBuilding· Lawrence Exterior Restora$35KDec 13
- 145 West 45 Street ManhattanINTERIOR RENOVATION FOR OFFICE SPACEcommercialBuilding· Wharton Smith Constructi$728KDec 13
- 1065 Madison Avenue Manhattaninstallation of new commercial kitchen plumbing fixtures and related rough-in-piping. The installation of new grease interceptor. The installation ofnew public bathroom fixtures…multifamilyFire protection, Plumbing· Five Borough NYC LLC$227KApr 1
- 2650 Adam Clayton Powell Boulevard ManhattanINSTALLATION OF MECHANICAL EQUIPMENT AND ASSOCIATED DUCTWORK IN A 6-STORY NYCHA MULTIPLE DWELLING IN CONJUNCTION WITH BUILDING WIDE RENOVATIONS: NO CHANGE TO USE, EGRESS, OR…multifamilyBuilding, HVAC / Mechanical, Plumbing· River City Builders LLC$1.3MSep 23
- 63 Flushing Avenue BrooklynBuilding 542: Construction of elevated platform for exterior electrical load center and transformer.commercialBuilding· Luigi Caliendo & Sons,Inc$150KDec 13
- 490 Fulton Street BrooklynINSTALLATION OF TEMPORARY SUSPENDED SCAFFOLDS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS…commercialBuilding· Windham Restoration Corp—Dec 13
- 6804 20 Avenue BrooklynRENOVATION OF EXISTING CELLAR AND SECOND FLOOR WITH GENERAL CONSTRUCTION:NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS…multifamilyBuilding· Kale Construction Inc$100KDec 13
- 6512 Bay Parkway BrooklynINTERIOR RENOVATION OF AN EXISTING MIXED-USE BUILDING ONLY ON 1ST FLOOR AND CELLAR FOR THE EXISTING FOOD STORE, WITH PARTITIONING, FLOORING, CEILING TILE WORK AND REPLACING…multifamilyBuilding, HVAC / Mechanical· High Quality Construction$65.6KDec 13
- 180 Nassau Street BrooklynInstallation of suspended scaffold for facade inspection/repairmultifamilyBuilding· RSG Construction Corp—Dec 13
- 7500 5 Avenue BrooklynPLUMBING WORK FOR EXISTING COMMERICAL AND RESIDENTIAL USE BUILDING. NO CHANGE IN USE, EGRESS AND OCCUPANCY.commercialPlumbing· HP Services Inc$50.5KDec 13
- 7500 5 Avenue BrooklynINTERIOR RENOVATION FOR EXISTING RESIDENTIAL AND COMMERICAL BUILDING @ 3RD FLOOR ONLY. NO CHANGE IN USE, EGRESS AND OCCUPANCY.commercialHVAC / Mechanical· Zaq Construction Inc$75KDec 13
- 510 Driggs Avenue BrooklynINSTALLATION OF PLUMBING FIXTURES ON THE FIRST FLOOR AND CELLAR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.multifamilyPlumbing· A Plus Plumbing Corp$80KDec 13
- 510 Driggs Avenue BrooklynINSTALLATION OF HVAC EQUIPMENT ON THE FIRST FLOOR AND ROOF AS PER PLANS FILED. NO CHANGE TO USE EGRESS OR OCCUPANCY.multifamilyHVAC / Mechanical· Imperium Construction Se$150KDec 13
- 510 Driggs Avenue BrooklynINTERIOR RENOVATION WORK ON THE FIRST FLOOR AS PER PLANS FILED. NO CHANGE TO USE EGRESS OR OCCUPANCY. (BARRY'S BOOTCAMP) HEALTH & FITNESS ESTABLISHMENT USE CREATED UNDER NB #…multifamilyBuilding· Imperium Construction Se$400KDec 13
- 265 Metropolitan Avenue BrooklynINTERIRO RENOVATION EXISTING COMMERCIAL SPACE WITH PARTITION AND MECHANICAL WORK ON 1ST FLOOR AND CELLAR.multifamilyBuilding· Rong Maintenance Inc$53KDec 13
- 2001 Fulton Street BrooklynALT-GC APPLICATION FILED FOR INTERIOR MODIFICATION TO RESIDENTIAL SPACE. NO CHANGE IN USE, OCCUPANCY, EGRESS, CERTIFICATE OF OCCUPANCYmultifamilyBuilding· Island Interiors Design$108KDec 13
- 330 Frost Street BrooklynFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Dec 13
- 280 Frost Street BrooklynFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Dec 13
- 2678 Coney Island Avenue Brooklyninterior renovation including partitions and bathrooms as per plans filed. no change in use egress or occupancycommercialBuilding, Plumbing· Pasha USA Construction In$81KMay 23
- 357 Leonard Street BrooklynFILE JOB FOR EXISTING 3-STORY RESIDENTIAL BUILDING,TO OBTAIN 3 FAMILY DWELLING C Of O.multifamilyBuilding, HVAC / Mechanical, Plumbing· LT Pro Construction Inc$637KJun 11
- 1390 Willoughby Avenue BrooklynSupport of Excavationcommercial· Northeast Restoration Cor$30KDec 13
- 4421 6 Avenue BrooklynINTERIOR RENOVATION FOR EXISTING STORE INCLUDING INSTALLATION OF CERAMIC FLOOR, INTERIOR WALLS, CEILING, ELECTRICAL COOKING EQUIPMENT, AND MECHANICAL WORK AS PER PLANS. NO CHANGE…multifamilyBuilding, Plumbing· Acs Environmental & Const$105KJun 20
- 67 Metropolitan Avenue BrooklynReplace storefront units and upward acting overhead door at first floor, and window units floors 2 through 5 per drawings. No change in Use, Egress or Occupancy under this…commercialBuilding· Core Tech LLC$608KSep 29
- 184 South 2 Street BrooklynPlumbing plans filed herewith to show installation of new heat pump, hot water heater system, and duplex domestic booster pump system. No change to use, egress, or occupancy.multifamilyPlumbing· Ajc Plumbing & HTG Corp$1.1MDec 13
- 188 South 2 Street BrooklynPlumbing plans filed herewith to show installation of new heat pump, hot water heater system, and duplex domestic booster pump system.multifamilyPlumbing· Ajc Plumbing & HTG Corp$1.1MDec 13
- 686 Howard Avenue BrooklynAPPLICATION FILED HEREWITH TO CONVERT EXISITNG TWO STORY + BASEMENT TWO FAMILY BUILDING INTO AN EIGHT FAMILY RESIDENTIAL BUILDINGmultifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· Amok Inc$482KDec 23
- 917 Hart Street BrooklynApplication filed for alteration to convert two (2) story one (1) family dwelling into seven (7) class a dwelling units with work to include horizontal and vertical enlargement.multifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· Zone Plumbing & Heating C$1.4MMar 17
- 51 South 1 Street BrooklynPROPOSED ALT-CO/NB 6 STORY & MEZZANINE RESIDENTIAL BUILDING WITH EXISTING ELEMENTS TO REMAIN, COMBING TAX LOTS 35 & 36 AS SINGLE ZONING LOT/ COMPENSATED ZONING LOTmultifamilyBuilding, Fire protection· Avesta Builders Inc$3.4MJan 30
- 2757 Fulton Street BrooklynPROPOSE 8 DU 4-STY MIXED USE NB.multifamilyFire protection, Plumbing· Structure King Inc—Jul 14
- 480 Warren Street BrooklynNew Split System AC, New Bathroom Vent and Exhaust Fan, New Vent and duct for H.W.H.multifamilyHVAC / Mechanical· Northbridge Contracting L$35.5KDec 13