New York City commercial construction projects
61,981 commercial and multifamily projects from New York City’s building permit records (11,164 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 7, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 1131 of 1240
- 321 East 153 Street BronxFISP INSPECTION (Facade Inspection Safety Program)INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSSEE ATTACHED PLANSDesignated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Dec 16
- 92 Van Cortlandt Park South BronxFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Dec 16
- 100 Van Cortlandt Park South BronxFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Dec 16
- 120 Gale Place BronxFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Dec 16
- 421 East 168 Street BronxFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Dec 16
- 2550 Boston Road BronxJob filed existing commercial store to install commercial kitchen hood and fire suppression system . No change of use, egress or occupancy under this application.commercialHVAC / Mechanical, Plumbing· All Pro PLBG & HTG Inc$70KJan 30
- 1363 Franklin Avenue BronxEXTERIOR RESTORATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.multifamilyBuilding, HVAC / Mechanical, Plumbing· JV Construction & Consult$3.3MMay 21
- 4200 Herkimer Place BronxFacade repairs to address FISP SWARMP conditions. Cracked brick replacement, brick repointing, stone sill replacement, stone repalcement at front entry.multifamilyBuilding· Sadhia Contracting GRP$74.3KDec 16
- 1650 Grand Concourse Bronx14th FLOOR INTERIOR RENOVATION: RENOVATE THE EXISTING 14th FL INTERIOR SPACE TO UPGRADE IN-PATIENT MEDICAL & SURGICAL BED UNIT, PER APPROVAL OF THE DEPARTMENT OF HEALTH, NEW YORK…commercialBuilding· Tri-State Contracting Gro$3.7MDec 16
- 141 Van Cortlandt Avenue West BronxMECHANICAL WORK FOR DRY COOLER SUPPORT A AMALGAMATED HOUSING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCYmultifamilyHVAC / Mechanical· Aks International Inc$170KDec 16
- 322 Bruckner Boulevard BronxApplication file for GC work in conjunction with a Temporary Use Permit (TUP) for asylum seeker respite center pursuant to emergency executive order #230. Interior renovation at…commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· HF Group Plmbg & Spnkler$800KFeb 10
- 3542 Tiemann Avenue BronxHEREWITH TO PROPOSE PLUMBING WORK RELATED TO THE PROPOSED 3-STORY, 5-FAMILY DWELLING WITH CELLAR.multifamilyPlumbing· Horbridge Plumbing & Heat$102KDec 16
- 1353 Castle Hill Avenue BronxMechanical work filed in conjunction with NB#:220706369multifamilyHVAC / Mechanical· Lod Construction LLC$260KDec 16
- 200 Lafayette Avenue Staten IslandINTERIOR RENOVATION OF A NURSING HOME. NEW RCP.commercialBuilding· Fairways Management LLC$250KDec 16
- 68-19 Woodhaven Boulevard QueensEQUIPMENT USE: DUAL 6000 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS…multifamilyHVAC / Mechanical· Rockledge Scaffold Corp$25KJan 10
- 110-12 Liberty Avenue QueensInstallation of PV System on existing rooftop. No changes to Egress or use of occupancy.multifamilySolar· Nys Essential Power Inc$47KDec 16
- 40-09 Prince Street QueensINTERIOR RENOVATION OF EXIST. RESTAURANT AS PER PLAN, NEW FINISHES, PAINTING AND NEW FLOORING. NO CHANGE OF USE, OCCUPANCY OR EGRESS.commercialBuilding· Sal Builders Inc$36KDec 16
- 272-06 Union Turnpike QueensSCOPE OF WORK TO INCLUDE INTERIOR ALTERATION TO EXISTING TENANT SPACE, NEW NON BEARING PARTITIONS, NEW FINISHES, NEW LIGHTING THROUGHOUT.commercialBuilding· JP Contractors Of NYC Inc$250KDec 16
- 215-46 39 Avenue QueensFILING FOR GENERAL CONSTRUCTION WORK AS PER PLANSmultifamilyBuilding· Liberty General Contracti$50KDec 16
- 133-27 39 Avenue Queensrenovation of unit LukFook G3A retail space at cellar Building B as per plans , no change in use, egress or occupancymultifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· H Interior Design Constru$383KJan 2
- 229 Beach 28 Street QueensINSTALLATION OF SOLAR PANELS ON ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.multifamilySolar· Sunco Capital LLC$69.6KDec 16
- 69-40 Austin Street QueensINTERIOR RENOVATION FOR EXISTING OFFICE ON UPPER FLOOR (1ST FLOOR). MINOR PARTITIONS, CEILING & LIGHTING FIXTURES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialBuilding· Wolf Hill Inc$52.5KDec 16
- 33-04 Ditmars Boulevard QueensJOB FILED INTERIOR RENOVATION OF COMMERCIAL STORE INCLUDING NEW COUNTER AND NEW FLOOR TILE AND NEW PAINT AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.multifamilyBuilding, Plumbing· All Pro PLBG & HTG Inc$70.1KJan 8
- 96-17 Liberty Avenue QueensRenovation of existing Take-Out-Restaurant, to establish New Eating & Drinking Establishment. Minor removal of non-bearing partition walls, Install new drywalls, replace cooking…commercialBuilding, HVAC / Mechanical, Plumbing· Dear's Construction Inc$82.7KMar 31
- 25-20 43 Avenue QueensINSTALL NEW HVAC SYSTEM AND EXHAUST SYSTEM AT 1ST FLOOR, EATING AND DRINKING ESTABLISHMENTS, AS PER PLANS FILED HEREWITH. THERE IS NO CHANGE OF USE, EGRESS AND OCCUPANCY.commercialBuilding, HVAC / Mechanical, Plumbing· Testerman PLBG & HTG Inc$185KMar 17
- 106-24 71 Avenue QueensOT-GC Cosmetic Work as per plans filed herewith. No change in use, Egress or Occupancy under this ALT2 application.commercialBuilding· DGC Capital Contracting C$475KDec 16
- 850 Columbus Avenue ManhattanHEREWITH FILING ROOFING REPLACEMENT LIMITED FACADE WORK AT BULKHEADS AS PER PLANS, INCLUDING REPLACEMENT OF BULKHEAD DOORS AND FRAMES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding· J & N Construction Group$1.4MDec 16
- 9 West 100 Street ManhattanSuspended Scaffold out rigger system for facade restoration works and inspectionscommercial· CHK Construction Corp—Dec 16
- 10 East 53 Street ManhattanArchitectural modifications on the 22nd floor (Investec) as per plans. No change to use, egress or occupancy.commercialBuilding· Omara Organization Inc$50KDec 16
- 100 West 94 Street ManhattanINSTALLATION AND USE OF TEMPORARY SUSPENDED SCAFFOLD FOR FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.multifamilyBuilding· Avarga Construction Corp—Dec 16
- 186 First Avenue ManhattanSprinkler work filed in conjunction with Architectural application #M08014520 to restore fire damaged building. No change to use, egress, or occupancy.multifamilyFire protection· A + Sprinkler Corp$43.6KDec 16
- 1187 Amsterdam Avenue ManhattanRENOVATION OF EXISTING STORE, INCLUDING INSTALLATION OF PARTITION AND FINISH WORK OF FLOORAND CEILING; REPLACEMENT OF PLUMBING FIXTURE AND A/C UNITS. MECHANICAL WORK FOR REPAIR…multifamilyBuilding, Plumbing· American Building Solutio$145KDec 20
- 950 3 Avenue ManhattanInstall Pantry & ADA Restroom Plumbing Fixtures, Appliances, D.F., Non-Gas Water Heaters and Associated Piping, Replace Men's & Women's Restroom Plumbing Fixtures, Remove…commercialFire protection, Plumbing· Accurate Mechanical Inc$105KDec 16
- 825 Columbus Avenue ManhattanINSTALLATION OF SUSPENDED SCAFFOLD FOR EMERGENCY FACADE REPAIRS AND FACADE INSPECTION. SUSPENDED SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN…multifamilyBuilding· Zoria Housing LLC—Dec 16
- 82 West Washington Place ManhattanPROPOSED INTERIOR RENOVATION OF EXISTING BUILDING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.multifamilyBuilding, Plumbing· Badger Management Inc$69KDec 23
- 236 West 15 Street ManhattanPROPOSE INTERIOR RENOVATION ON EXISTING 6 STORY BUILDING, CONSTRUCTIONS WORKS AS PER PLAN.PLUMBING WORK TO BE FILED UNDER SEPARATE APPLICATION. NO CHANGE ON EGRESS USE OR…multifamilyBuilding, Plumbing· Badger Management Inc$36KJan 7
- 150 West 56 Street ManhattanFILING HEREWITH DRAWINGS TO REPLACE (1) EXISTING COOLING TOWER WITH NEW ONE (1) COOLING TOWER CWT RTCH-350A ON EXISTING DUNNAGE, IN-KIND, AT THE 25 FLOOR. THIS APP DO NOTREQUIRE…multifamilyHVAC / Mechanical· Rosenwach Tank Co. LLC$25KDec 16
- 100 Park Avenue ManhattanMechanical changes as indicated on plans.commercialFire protection, HVAC / Mechanical, Plumbing· Versatile Services LLC$658KApr 15
- 1980 Park Avenue ManhattanSUSPENDED SCAFOLD OUTRIGGER SYSTEM AND MATERIAL HOIST SYSTEM FOR ROOF REPAIRS, REPLACEMENT, INSPECTIONS AND FACADE RESTORATION WORKS. SUSPENDED SCAFFOLD AND MATERIAL HOIST SHALL…multifamilyRoofing· J&N Construction GRP Corp—Dec 16
- 1156 Madison Avenue ManhattanRENOVATION TO EXISTING RETAIL SPACE (VARLEY) WORK TO INCLUDE PARTITION, CEILING, DOOR AND MINOR STOREFRONT MODIFICATIONS AS INDICATES ON PLANS. NO CHANGE IN USE, EGRESS OR…multifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· Clune Construction Co LP$242KFeb 5
- 155 6 Avenue ManhattanINTERIOR BUILDOUT OF NON LOAD BEARING PARTITIONS & NEW FINISHES AS PER PLANS.commercialBuilding· Clune Construction Co LP$94.2KDec 16
- 300 East 54 Street ManhattanInterior renovation at the 20th floor to residential apartment 20BC. New interior wall opening, new plumbing fixtures, and kitchen appliances throughout. No change to use,…multifamilyBuilding· Upper Restoration Inc$175KDec 16
- 1250 Broadway ManhattanAt 2nd thru 12th Floor Exit Stair and 2nd thru 39th Floor Electric Closets, Removal and Installation of 2-hr rated non-bearing shaft wall enclosures at existing shaft openings as…commercialBuilding· Signal USA LLC$125KDec 16
- 411 8 Avenue ManhattanHEREBY FILING GENERAL CONSTRUCTION AND MECHANICAL WORK INCLUDING HOOD AND DUCTWORK FOR COMMERCIAL KITCHEN EATING/DRINKING ESTABLISHMENT AT GROUND FLOOR.commercialBuilding· Beyer Construction Corp$95KDec 16
- 51 Astor Place ManhattanInterior demolition for floor 5-7commercialBuilding· New Roc Contracting Corp$600KDec 16
- 69 West 9 Street Manhattaninterior renovation of apt 4CmultifamilyBuilding· Tristate Contracting$25KDec 16
- 5 West 19 Street ManhattanINTERIOR WORK AT THE PHOTOGRAPHIC STUDIO AND OFFICE AT 9TH FLOOR. NON- STRUCTURAL DEMOLITION AND MINOR PARTITION WORK AND FINISHES.commercialBuilding· Renovation Partners Inc$240KDec 16
- 51 Astor Place ManhattanSprinkler work during interior demolition including installation of temp loop on floors 5-7.commercialFire protection· KG Sprinkler Corp$75KDec 16
- 51 Astor Place ManhattanPlumbing work during interior demolition for floors 5-7.commercialPlumbing· Donato Plumbing, Inc$75KDec 16
- 51 Astor Place ManhattanMechanical work during interior demolition for floor 5-7commercialHVAC / Mechanical· New Roc Contracting Corp$100KDec 16