New York City commercial construction projects
61,981 commercial and multifamily projects from New York City’s building permit records (11,164 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 7, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 1110 of 1240
- 160-13 Northern Boulevard QueensMINOR INTERIOR ALTERATION FOR DELICATESSEN. WORK INCLUDES NEW PARTITION WALL AND CEILING REPAIR. NO CHANGE IN USE, OCCUPANCY AND STRUCTURE UNDER THIS APPLICATION.commercialBuilding, Plumbing· Dong San Construction Inc$69KJan 6
- 102-40 Ditmars Boulevard QueensApplication for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.commercial· Skytrac Access Group LLC—Jan 2
- 27-20 42 Road QueensRENOVATION OF RETAIL SOTRE, INCLUDING INSTALLATION OF PARTITION, PLUMBING FIXTURE, HVAC UNITS AND KITCHEN HOOD WITH EXHAUST FAN. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS…multifamilyBuilding, Fire protection· J. Caiazzo PLBG & HTG Cor$132KNov 14
- 20-24 Mott Avenue QueensRENOVATION OF NEW ICE CREAM STORE, INCLUDING INSTALLATION OF PARTITION, A/C UNITS AND PLUMBING FIXTURE. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS…multifamilyHVAC / Mechanical, Plumbing· Domus Design Inc$166KJun 10
- 9720 Rockaway Beach Boulevard QueensPROPOSE LOW PRESSURE PERMEATION GROUTING WORK TO IMPROVE SOIL CONDITION. NO CHANGE IN ZONING, EGRESS, OR SCHEDULE OF OCCUPANCY.multifamily· NY Drilling Inc$216KJan 2
- 103-25 Rockaway Boulevard QueensREPAIR AND/OR REPLACE ALL EXISTING WOOD JOISTS IN CELLAR UNDER DELI AREA ONLY TO RESCIND PARTIAL VACATE ORDER ISSUED BY DOB. SHORING APPLICATION FILED AND APPROVED UNDER JOB#…multifamilyBuilding· Scafftech LLC$30KJan 2
- 84-12 35 Avenue QueensINSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.multifamilySolar· Best Energy Power 2015 LL$229KJan 2
- 1843 Summerfield Street QueensINTERIOR RENOVATION OF EXISTING 2-STORY BUILDING WITH GENERAL CONSTRUCTION WORK AS PER PLANS FILED HEREWITH. RELATED PLUMBING WORK WILL BE FILED SUBSEQUENTLY. NO CHANGE IN USE,…multifamilyBuilding, Plumbing· Kale Construction Inc$398KJan 23
- 71-82 Parsons Boulevard QueensREMOVAL AND INSTALLATION OF SPRINKLER HEADS AND ASSOCIATED BRANCH PIPING IN CONJUNCTION WITH EXISTING TREATMENT HEALTH CARE FACILITY AT FIRST FLOOR AS PER PLANS FILED.multifamilyFire protection· MPS Plumbing & Heating In$36KJan 2
- 108-13 49 Avenue QueensTo restore the 2nd and 3rd floors to their original condition and remove the illegal structure in front of the two-car garage as per ECB violations: 39111527L,39111529P &…multifamilyBuilding, Plumbing· Just PLBG & HTG Inc$115KJan 8
- 150-26 12 Road QueensFILE PL & SP WORKTYPE IN CONJUNCTION WITH JOB#Q00986637multifamilyPlumbing· Tri State PLBG & HTG Inc—May 12
- 150-22 12 Road QueensFILE PL & SP WORKTYPE IN CONJUNCTION WITH JOB#Q00986632multifamilyPlumbing· Tri State PLBG & HTG Inc—May 12
- 150-20 12 Road QueensFILE PL & SP WORKTYPE IN CONJUNCTION WITH JOB#Q00986630multifamilyPlumbing· Tri State PLBG & HTG Inc—Jan 2
- 150-18 12 Road QueensFILE PL & SP WORKTYPE IN CONJUNCTION WITH JOB#Q00986618multifamilyPlumbing· Tri State PLBG & HTG Inc—May 13
- 171-65 46 Avenue QueensAPPLICATION FILLED TO COMPLETE AND SIGN-OFF JOB ALT-1 # 706-88 BY EXPIRED BY LIMITATION WORK HAS BEEN COMPLITED BUT NOT SIGN - OFF ALSO TO RESPOND VIOLATIONS.multifamilyBuilding· Galaxy G.C. Group, LLC—Jan 2
- 31-39 83 Street QueensFILING TO CONVERT EXISTING THREE FAMILY DWELLING AS PER C OF O 62970 INTO A FOUR FAMILY BY CONVERTING THE EXISTING BASEMENT FLOOR INTO A DWELLING UNIT.multifamilyHVAC / Mechanical· NY Building Associates In$98.8KJan 2
- 584 Broadway ManhattanRenovate suite 303 on 3rd fl. New partitions and finishes. No change in use, egress or occupancycommercialBuilding· Mario's General Contracti$85KJan 2
- 530 Broadway ManhattanInstallation of suspended scaffold for facade work and/or inspection. Amend #7, added scaffold drops and outrigger detailscommercial· Skyline Restoration Inc—Jan 2
- 610 West 150 Street ManhattanINSTALL NEW CHIMNEY LINER IN EXISTING MASONRY CHIMNEY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyHVAC / Mechanical· Ace Chimney & Fireplace$40KJan 2
- 545 West 126 Street ManhattanInstallation of suspended scaffold for facade work and/or inspection. Amend #4, added outrigger detailsmultifamily· Skyline Restoration Inc—Jan 2
- 1470 Amsterdam Avenue ManhattanInstallation of suspended scaffold for facade work and/or inspection. Amend #4, added outrigger detailsmultifamily· Skyline Restoration Inc—Jan 2
- 1430 Amsterdam Avenue ManhattanInstallation of suspended scaffold for facade work and/or inspection. Amend #4, added outrigger detailsmultifamily· Skyline Restoration Inc—Jan 2
- 3250 Broadway ManhattanInstallation of suspended scaffold for facade work and/or inspection. Amend #4, added outrigger detailsmultifamily· Skyline Restoration Inc—Jan 2
- 1420 Amsterdam Avenue ManhattanInstallation of suspended scaffold for facade work and/or inspection. Amend #4, added outrigger detailsmultifamily· Skyline Restoration Inc—Jan 2
- 110 1 Avenue ManhattanAlteration in plumbing fixtures and cooking equipment per plan. No change in use, occupancy or egress.multifamilyHVAC / Mechanical, Plumbing· Drilon PLBG & HTG Inc$39KJan 3
- 125 Park Avenue ManhattanFISP INSPECTION (Facade Inspection Safety Program)INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSSEE ATTACHED PLANSDesignated Primary Site supervisor: Jesus Decolacommercial· Structual Presv System—Jan 2
- 100 Park Avenue ManhattanMechanical changes as indicated on plans.commercialFire protection, HVAC / Mechanical, Plumbing· James E Fitzgerald Inc$314KJan 16
- 22 Vanderbilt Avenue ManhattanInterior Renovation of office as shown on drawings filed herewith. No change to occupancy use or egress.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Sciame Construction LLC$3MApr 27
- 542 6 Avenue ManhattanINSTALL NEW 10 GAGE ALL WELDED 304 STAINLESS STEEL EXTENSION ON EXISTING TILE LINED CHIMNEY IN CONJUNCTION WITH NB 121204801. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.multifamilyBuilding· Guaranteed Home Improveme$25KJan 2
- 101 Park Avenue ManhattanModifications to the existing sprinkler system on the (27th (M)/ 24th (C) Floors- Customers Bank ) as per plans. No change to use, egress or occupancy.commercialFire protection· Par Fire Protection LLC$182KJan 2
- 500 West 33 Street ManhattanInterior tenant fit-out of existing store. New non-load bearing partitions, lighting and millwork for RU222A & 222B as shown on drawings. No change in use, egress or occupancy.commercialBuilding, Fire protection, HVAC / Mechanical· A. Bonaduce, Inc$560KJan 8
- 320 5 Avenue ManhattanReplacement of Existing Freight Elevator Pit Construction in Cellar.commercialBuilding· City & County Paving Corp$50KJan 2
- 177 8 Avenue ManhattanInterior Renovation work (tenant fit out work) in the retail space on first floor as shown on the plans such as replace countertop, cabinets, coffee making maker and cosmetic…multifamilyBuilding, Plumbing· Azm Home Improvements Inc$90.7KJan 16
- 2420 Amsterdam Avenue ManhattanInterior renovation of existing 11th floor shell space into medical office. No change of use, egress or occupancy.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Capitol Fire Sprinkler Co$4.4MJan 9
- 2420 Amsterdam Avenue Manhattaninterior renovation of existing 9th floor shell space into medical office. No change of use, egress or occupancy.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Bedrock PLBG. & HTG., Inc$3.1MJan 9
- 2420 Amsterdam Avenue ManhattanInterior renovation of existing 8th floor shell space into medical office. No change of use, egress or occupancy.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Bedrock PLBG. & HTG., Inc$3.3MJan 8
- 1140 Broadway ManhattanAPPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 3RD FL (SUITE 307) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS,…commercialBuilding· Kosmos Remodeling Inc$63.3KJan 2
- 622 Third Avenue ManhattanInstallation of non load bearing partitions as per plans filed herewith.commercialBuilding· Icon Interiors Inc$450KJan 2
- 28 East 39 Street ManhattanFILING HEREWITH FOR THE UPGRADE OF FLOORING , CEILING , AND WALL FINISHES, NEW LIGHTING AND NEW HVAC. THERE IS NO CAHNGE TO USE, EGRESS, OR OCCUPANCY.commercialBuilding, HVAC / Mechanical· Amazing Builders And Reno$619KJan 9
- 19 East 72 Street ManhattanFILING HEREWITH INTERIOR RENOVATION OF RETAIL SPACE AS PER PLANS.multifamilyBuilding, HVAC / Mechanical· JKT Construction Inc$208KJan 29
- 219 East 89 Street ManhattanINTERIOR RENOVATION AT APARTMENT 2E , NO CHANGE IN USE EGRESS AND OCCUPANCYmultifamilyBuilding, Plumbing· SH Interiors Corp$61.9KApr 1
- 4 West 40 Street ManhattanSingle tenant build out of 2 interior floors with existing interconnecting stair in existing office building. No change of use or occupancy.commercialBuilding· Structure Tone, LLC$2.5MJan 2
- 555 West 186 Street ManhattanFILING FOR REPAIR OF FIVE STORY MASONRY FACADE: Secure DECORATIVE PARAPET, REPAIR WINDOW LINTELS AND BRICK POINTING.multifamilyBuilding· Stadium Builders Inc$120KJan 2
- 215 West 94 Street ManhattanINTERIOR RENOVATION FOR PROPOSED RESTAURANT@ 1ST. FLOOR. INSTALL COMMERICAL KITCHEH HOOD. NO CHANGE IN USE, EGRESS AND OCCUPANCY.commercialHVAC / Mechanical· Zaq Construction Inc$252KJan 2
- 1345 6 Avenue ManhattanPartial renovation of existing air conditioning system to include new and relocated ductwork, new controls and new diffusers and registers. No change to egress, use or occupancy.commercialHVAC / Mechanical· Seleucia Contracting LLC$28KJan 2
- 1345 6 Avenue ManhattanPartial interior renovation of 8th floor including limited demolition, new non-bearing drywall partitions, flooring, ceiling tiles & lighting as per plans. There will be no…commercialBuilding· Seleucia Contracting LLC$220KJan 2
- 225 East 74 Street ManhattanRenovation of Apartment # 2G to include removal and installation of partitions, doors, ceiling, finishes. No change in use, egress or occupancy is involved.multifamilyBuilding, Plumbing· Arroyo Contracting Corp$120KJan 3
- 12 East 42 Street ManhattanMODIFICATION AND INSTALLATION OF PLUMBING FIXTURES.commercialPlumbing· Austin PLBG & HTG Co.Inc$45.5KJan 2
- 37 East 64 Street ManhattanFacade repairs. No change in egress, use or occupancy.commercialBuilding· Dna Contracting LLC$1.2MJan 2
- 1251 6 Avenue ManhattanAlteration filing to relocate and install new sprinkler heads and piping at Cellar and 1st floor associated with Restaurant renovation as shown on plans filed herewith. No change…commercialFire protection· KG Sprinkler Corp$60KJan 2