New York City commercial construction projects
61,981 commercial and multifamily projects from New York City’s building permit records (11,164 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 7, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 1103 of 1240
- 1 Station Square QueensFacade and Roof repairs as per plans; no change to use, egress, or occupancy.multifamilyBuilding· Xinos Construction Corp$129KJan 7
- 108-14 Metropolitan Avenue QueensNEW SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH.commercialFire protection, Plumbing· Kew Forest PLBG & HTG Inc$48KJan 13
- 154-18 Cross Island Parkway QueensInstallation of new VERIZON site. Install of equipment area with (1) proposed cabinet, (2) proposed equipment racks, (1) distribution unit and (3) RRH units on the first floor.…commercialRoofing· Rc3 Electric, LLC$70.6KJan 7
- 229-02 137 Avenue QueensRENOVATE CLASSROOM 224 TO COMPUTER LAB. MISC. RENOVATE DRINKING FOUNTAIN ALCOVE.commercialBuilding, Plumbing· D. Paul Construction Inc$183KJan 23
- 342 West 71 Street ManhattanRENOVATION TO EXISTING PLUMBING AND SPRINKLERS FOR THE INSTALLATION OF DRYERS AND WASHERS IN THE 1-5 FLOORS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.commercialFire protection· Skinner Plmng & HTG Corp$45KJan 7
- 2364 Frederick Douglass Boulevard ManhattanInstall (3)split A/C unit to supersede application#120340826 MH work type. No change in use, egress & occupancy.multifamilyHVAC / Mechanical· Lionheart Construction Co$30KJan 7
- 333 East 69 Street ManhattanSUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR INSPECTION AND EXTERIOR REPAIR WORK AT 333 EAST 69 STREET, MANHATTAN, NY 10021.multifamilyBuilding· KMM Construction Of NY In—Jan 7
- 2227 2 Avenue ManhattanSuspended scaffold out rigger installation for Facade repairs and inspections.multifamilyBuilding· Zircon Group Inc—Jan 7
- 228 East 115 Street ManhattanSuspended scaffold out rigger installation for Facade repairs and inspections.multifamilyBuilding· Zircon Group Inc—Jan 7
- 218 East 115 Street ManhattanSuspended scaffold out rigger installation for Facade repairs and inspections.multifamilyBuilding· Zircon Group Inc—Jan 7
- 325 East 112 Street ManhattanSuspended scaffold out rigger installation for Facade repairs and inspectionsmultifamilyBuilding· Zircon Group Inc—Jan 7
- 2201 First Avenue ManhattanSuspended scaffold out rigger installation for Facade repairs and inspections.multifamilyBuilding· Zircon Group Inc—Jan 7
- 711 3 Avenue ManhattanFISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolacommercial· Structual Presv System—Jan 7
- 110 West 69 Street ManhattanInstallation of suspended scaffold for facade work or inspectionmultifamily· DK Builders Inc—Jan 7
- 747 10 Avenue ManhattanINSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT.commercial· Igh Restoration LLC—Jan 7
- 1271 Broadway ManhattanILLUMINATED NON-ADVERTISING DOUBLE-SIDED PROJECTING ACCESSORY SIGN - (LOGO). NO CHANGE OF USE, EGRESS OR OCCUPANCY.commercialSigns· Mad Signs Inc—Jan 7
- 140 West Street ManhattanInterior renovation of Penthouse Duplex Units PHA & PHB at 31st, 31st Mezzanine, and 32nd floors. No change to use, egress or occupancy.multifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· First Standard Constr Inc$542KNov 7
- 609 Columbus Avenue ManhattanPropose interior renovation @ partial 8th and 9th floor Apt#8L with minor partition and finish work as per plan. No change in use, egress, or occupancy.multifamilyBuilding· Tema Builders Group Corp$48KJan 7
- 625 6 Avenue ManhattanInterior renovation filed as per plan provided. No change in use, egress or occupancy.commercialBuilding· Reidy Contracting Group$1.8MJan 7
- 155 West 70 Street ManhattanFILING FOR GENERAL CONSTRUCTION WORK AS PER PLANSmultifamilyBuilding· Vivid Home Finishes LLC$100KJan 7
- 33 Bleecker Street ManhattanHEREBY FILING FOR THE RENOVATION OF UNIT 4A. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding, HVAC / Mechanical· Hello Chapter LLC$105KJan 26
- 9 West 57 Street ManhattanWORK UNDER THIS APPLICATION IS LIMITED TO THE RENOVATION OF PARTIAL 17TH FLOOR INVOLVING CONSTRUCTION OF GLASS PARTITION FOR A NEW CONFERENCE ROOM AND FINISHES. NO CHANGE IN USE,…commercialBuilding, Fire protection, HVAC / Mechanical· James E Fitzgerald Inc$261KJan 8
- 510 Madison Avenue ManhattanINSTALLATION OF SUSPENDED SCAFFOLD AND MATERIAL HOIST EQUIPMENT (COUNTERWEIGHTED SYSTEM).commercial· Elm Suspension Systems—Jan 7
- 64 East 111 Street ManhattanInstallation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.multifamilyBuilding· Canido Basonas Const. Cor—Jan 7
- 1211 Avenue Of The Americas ManhattanStructural alterations for television broadcast studios. No change in use, egress, or occupancycommercialBuilding· Benchmark Builders LLC$100KJan 7
- 1211 Avenue Of The Americas ManhattanREMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER DRAWINGS FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.commercialBuilding· Benchmark Builders LLC$8.3MJan 7
- 234 West 39 Street ManhattanMechanical modifications taking place in the lobby as per plans filed herewith. No change in use, egress or occupancy.commercialHVAC / Mechanical· DK Construction One, Corp$31.1KJan 7
- 30 Rockefeller Plaza ManhattanINTERIOR RENOVATION OF CELLAR RETAIL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Construction Management &$1.1MFeb 3
- 505 East 79 Street ManhattanInstallation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.multifamilyBuilding· Canido Basonas Const. Cor—Jan 7
- 210 East 31 Street ManhattanRENOVATE EXISTING APARTMENT # 2R WITH RELOCATED EXISTING KITCHEN, BATHROOM, MINOR PARTITION WORK, INTERIOR FINISHED WORKS AS SHOWN ON PLAN. PLUMBING UNDER DOB NOW JOB M00732396.…multifamilyBuilding, Plumbing· Redirecting Lic Inc$48.3KJan 13
- 512 7 Avenue ManhattanGeneral construction modifications as per plans filed herewith. No change in use, egress or occupancy.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Aik Renovation Inc$1.4MFeb 12
- 30 Rockefeller Plaza ManhattanSPRINKLER WORK ASSOCIATED WITH COMMERCIAL TENANT FIT OUT RENOVATIONS AT CELLAR (RINK LEVEL) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialFire protection· Plumbing Works Corp$75KJan 7
- 370 East 76 Street ManhattanHEREBY FILING FOR THE INSTALLATION OF INTERIOR RAMP IN LOBBY. NO CHANGE TO USE OCCUPANCY OR EGRESS.multifamilyBuilding· JV & Sons Construction In$38KJan 7
- 62 Prince Street ManhattanINTERIOR CLEANUP AND MINOR DEMO OF EXISTING RESTAURANT AT FIRST FLOOR. REMOVE EXISTING COUNTERS. REMOVE NON-BEARING WALLS . REMOVE EXISTING HOODS. ASSOCIATED PLUMBING WORK TO BE…commercialBuilding, Plumbing· Professional Door Corp$161KFeb 7
- 1 Madison Avenue ManhattanSprinkler System modification as per plans filed herewith. No change in use, egress, or occupancy.commercialFire protection· Preferred Spklr And Mech$528KJan 7
- 1200 Saint Nicholas Avenue ManhattanINSTALLATION OF HVAC SYSTEM ON THE ROOF WITH A TOTAL CAPACITY OF 16 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.multifamilyHVAC / Mechanical· Afgo Mechanical SVCS Inc$56KJan 7
- 23 East 10 Street ManhattanAPPLICATION FILED FOR INTERIOR RENOVATION TO EXISTING APARTMENT 4C, LOCATED ON THE 4TH FLOOR OF AN EXISTING 12 STORY BUILDING.ALL WORK AS PER PLANS FILED HEREWITH.NO CHANGE IN…multifamilyBuilding· Gonzalo Z Corp$150KJan 7
- 620 8 Avenue ManhattanDATADOG-- REMOVAL OF PLUMBING FIXTURES WITH RELATED PIPING MODIFICATIONS; CAP LINES AS NEEDED.commercialPlumbing· George Breslaw Plbng LLC$61.5KJan 7
- 249 East 86 Street ManhattanReplacement of air conditioning units on the roof. All existing ductwork to remain and not to be disturbed. No change in use egress and occupancy.multifamilyHVAC / Mechanical· Perry Mechanical Contract$40KJan 7
- 100 Un Plaza ManhattanInterior demolition and renovation of existing apartment 43 AB. New Mechanical system, dropped ceiling, partitions, kitchen and bathrooms, new wood flooring and tile.. Misc…multifamilyBuilding, Plumbing· MR. G Painting Corp$184KJan 9
- 1177 Avenue Of The Americas ManhattanModification and installation of sprinkler heads and plumbing fixtures as per plans filed herewith.commercialFire protection, Plumbing· Abco-Peerless Sprklr Corp$258KJan 22
- 1177 Avenue Of The Americas ManhattanModification existing sprinkler system and installation of plumbing fixtures.commercialFire protection· Abco-Peerless Sprklr Corp$214KJan 22
- 99 Park Avenue ManhattanInterior Renovation of new offices, collaboration areas, conference rooms and pantry. No change to use, occupancy, and egress.commercialBuilding, HVAC / Mechanical, Plumbing· JRM Construction MGMT LLC$865KJan 21
- 118 Riverside Drive ManhattanInterior alteration work to convert unit 3CD into two separate apartments 3C and 3D. No change in occupancy, use or egress.multifamilyBuilding· Alexandra's Interiors Cor$32KJan 7
- 300 East 74 Street ManhattanApplication filed to do work on the interior of unit 20G. Work to include reconfiguration of non-load bearing partitions.multifamilyBuilding, Plumbing· R & SS General Constructi$191KFeb 6
- 350 Fifth Avenue ManhattanPLUMBING MODIFICATIONS TO THE 78TH AND 79TH FLOOR AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialPlumbing· A&A Plumbing Corp$190KJan 7
- 201 West 70 Street ManhattanFILE PLUMBING WORK FOR 7TH FLOOR APT. 7K. NO CHANGE OF USE, EGRESS OR OCCUPANCY.multifamilyBuilding, Plumbing· Pobla Mex Construction$31.6KJan 7
- 394 Broadway ManhattanSTOREFRONT REPLACEMENT AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY, THIS APPLICATION TO BE PROFESSIONALLY CERTIFIED.commercialBuilding· Sky High Group, LLC$96.8KMay 16
- 220 East 67 Street ManhattanGENERAL CONSTRUCTION FOR EXISTING RETAINING WALL REINFORCEMENT WITH NEW STRUCTURAL STEEL BRACING FRAMES INSTALLED ON THE GARAGE ROOF LEVEL AS PER PLANS FILED HEREWITH. NO CHANGE…multifamilyBuilding· Juno Contracting Corp$88KJan 7
- 345 Park Avenue ManhattanFiling for general construction on the 7th and 8th floor. No change in occupancy, use or egress.commercialBuilding, Fire protection, HVAC / Mechanical· JT Magen & Company Inc$203KJun 2