New York City commercial construction projects
61,981 commercial and multifamily projects from New York City’s building permit records (11,164 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 7, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 1099 of 1240
- 521 West 57 Street ManhattanMODIFICATIONS TO EXISTING SPRINKLER SYSTEM AND RELATED PIPING ON 1ST FLOOR, 6TH FLOOR AND ROOF AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.commercialFire protection· Midnight Express Mech CRP$252KJan 9
- 401 West 79 Street ManhattanPROPOSED INSTALLATION OF SOME PLUMBING FIXTURES.commercialPlumbing· Olympic PLBG & HTG SVC In$2.3MJan 9
- 2130 Madison Avenue ManhattanBLG 9 - STRUCTURAL WORK FOR ROOF REPAIRS AS PER PLANS FILED HEREWITH.multifamilyBuilding· Amb Construction Inc$121KJan 9
- 27 West 11 Street ManhattanFILING HEREWITH PLUMBING WORK AS PER PLANS IN CONJUNCTION WITH ALT I APPLICATION #121209101commercialPlumbing· H.K. Mechanical SVC Corp$390KJan 9
- 103 Putnam Avenue BrooklynINSTALL NEW FIRE SPRINKLER SYSTEM IN THE ENTIRE BUILDING I.A.W. NFPA 13R 2017 EDIT, AS MODIFIED BY NYC BC 2022 APPENDIX Q AS PER PLAN, IN CONJUNCTION W/ NYC DOB NOW JOB #:…multifamilyFire protection· Safety Fire Sprinkler Cor—Jan 9
- 710 57 Street BrooklynPROPOSE INTERIOR DEMOLITION OF THE EXISTING BUILDING, REMOVE EXISTING PARTITIONS AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.commercialBuilding, Plumbing· Steel Tone Construction$49KApr 24
- 369 Quentin Road BrooklynINSTALLATION OF PLUMBING FIXTURESmultifamilyPlumbing· Rite Way Heating Corp$25KJan 9
- 5006 8 Avenue BrooklynINTERIOR RENOVATION OF 2ND FLOOR OF EXIST. 2 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. INSTALL PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT, NO…multifamilyBuilding, Plumbing· Cube Builders Group NY$73.1KJan 15
- 1418 Cortelyou Road BrooklynTHE PURPOSE OF THIS FILING IS LIMITED TO REFURBISH EXISTING 1ST FLOOR COMMERCIAL SPACE AS PER DRAWINGS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.multifamilyBuilding, Plumbing· Urban Constr & Design LLC$29.5KJan 24
- 232 Adelphi Street BrooklynHEREWITH FILING FOR REPLACEMENT EXTERIOR CONDENSER UNITS AS PER THE PLANS TO INDIVIDUALLY METER EACH CONDENSER UNIT (CURRENTLY COMBINED METERING). NO CHANGE TO USE, EGRESS OR…multifamilyHVAC / Mechanical· Daily Maintenance LLC$56.3KJan 9
- 205 Montague Street BrooklynREPAIR OF FACIA PANELS TO INCLUDE RE-CAULKING ON ALL EXPOSURES, RE-ATTACHMENT OF DAMAGED/CRACKED LIMESTONE PANELS AS SHOWN ON PLAN DRAWINGS HEREIN.commercialBuilding· Manhattan Constructors$40KJan 9
- 310 Brighton Beach Avenue BrooklynINTERIOR RENOVATION AT CELLAR AND FIRST FLOOR BEAUTY SALON OF EXISTING 3-STORY BUILDING WITH GENERAL CONSTRUCTION WORK AS PER PLANS FILED HEREWITH. RELATED PLUMBING WORK WILL BE…commercialBuilding, Plumbing· Kale Construction Inc$110KJan 13
- 412 8 Avenue BrooklynHEREWITH FILING INTERIOR DEMO AND BUILDOUT FOR GENERAL CONSTRUCTION WORK RELATED TO COMBINING APARTMENTS B4 AND C4 AS PER TPPN 03/97. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding· NYC Design & Reno LLC$120KJan 9
- 489 Fulton Street BrooklynInterior renovation of existing 1st floor retail space. No change in use, egress or occupancy.commercialBuilding· The Benmoore Construction$139KJan 9
- 70 East 52 Street BrooklynINSTALLATION OF SOLAR PANELS ON ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.multifamilySolar· Sunco Capital LLC$79.6KJan 9
- 232 Adelphi Street BrooklynMINOR ALTERATION FOR INTERIOR WORK ONLY, AND AS AS-BUILT DRAWINGS FOR THE PREMISES. THE WORK INCLUDES MINOR WORK TO THE KITCHENS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.multifamilyBuilding· Daily Maintenance LLC$47.6KJan 9
- 1540 De Kalb Avenue BrooklynFILING THIS APPLICATION FOR INTERIOR RENOVATION ON 1ST FLOOR COMMERCIAL SPACE.NO CHANGE IN USE,EGRESS OR OCCUPANCYmultifamilyBuilding, HVAC / Mechanical· Quality G Builders Inc$92KApr 22
- 781 Broadway BrooklynINTERIOR RENOVATION OF RESTAURANT SPACE, COMMERCIAL KITCHEN, CONSTRUCTION, AND MECHANICAL WORKS AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialBuilding, Plumbing· Built Nyg Inc$88.5KJan 9
- 125 Montague Street BrooklynWORK HEREIN IS BEING FILED FOR THE INTERIOR FIT OUT OF AN EXISTING RETAIL SPACE. ALL WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.commercialBuilding, Fire protection· James Patrick Company Inc$200KFeb 6
- 510 Driggs Avenue BrooklynINTERIOR ALTERATION OF EXISTING COMMERCIAL SPACE. NO CHANGE TO USE, OCCUPANCY OR EGRESS.multifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· Four Star Air Con'd Co LL$543KApr 10
- 106 Flushing Avenue BrooklynInterior renovation of existing first floor commercial space. including replacement of storefront. No change in use, egress or occupancy.commercialBuilding· Lemazia Construction Inc$40.3KJan 9
- 3714 Gar 18 Avenue Brooklynnew accessory garagecommercialBuilding, Plumbing· SNBD Enterprises LLC—May 5
- 562 52 Street BrooklynFile application to replace existing joists with wooden with steel beams at cellar.multifamilyBuilding· Zaq Construction Inc$30KJan 9
- 153 Hamilton Avenue BrooklynMODIFY/EXISTING APPROVED STRUCTURE TO INSTALL (2) PSA SIGNS / NON-ADVERTISING SIGNS. REPAIRING /REPLACING ANGLES AND METAL. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.commercialBuilding, Signs· Fm95ny LLC$52.5KJan 9
- 145 Stuyvesant Avenue BrooklynCONVERT EXISTING 3-FAMILY BUILDING TO 2-FAMILY BUILDING.multifamilyBuilding, Fire protection, Plumbing· Maximum Contracting Inc$488KMay 13
- 182 Norman Avenue BrooklynCONVERT EXISTING 2-STORE UNITS AND 2-RESIDENTIAL UNITS TO 2 RESIDENTIAL UNITS AT 1ST FLOOR AND CELLAR. OBTAIN NEW CERTIFICATE OF OCCUPANCY.multifamilyBuilding, HVAC / Mechanical, Plumbing· Ebl Contracting Corp$344KJul 10
- 92 Wilson Avenue Brooklynrenovation of existing class A 3 family house , 3 story with cellar , no chagne of existing bulk , interior renoation of entire building , new partitions , new MECH and PL , no…multifamilyHVAC / Mechanical, Plumbing· John Fitzgerald PLBG &HTG$303KOct 20
- 69 Hudson Avenue Brooklynheat pump split system airconditioning & associated piping no change to egress or occupancymultifamilyBuilding, HVAC / Mechanical· Laile Inc$121KMar 25
- 1229 Greene Avenue BrooklynMECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF 3-STORY NYCHA MULTIPLE DWELLING THROUGHOUT: PROVIDE NEW HVAC SYSTEM FROM THE CELLAR TO A NEW PREFRABICATED HEATING BOILER POD;…multifamilyHVAC / Mechanical, Plumbing· J-J Plumbing Corp$1.7MJun 5
- 81 St James Place BrooklynALTERATION OF AN EXISTING 3-FAMILY TOWNHOUSE INTO A 2-FAMILY TOWNHOUSE. INTERIOR WORK ONLY. TO OBTAIN A NEW CERTIFICATE OF OCCUANCY. PLUMBING, SPRINKLER, STRUCTURAL, AND…multifamilyBuilding· Bayport Construction Corp$72KJan 9
- 18 Beaver Street BrooklynProvide One BX Spilt cooling system of size and capacity scheduled to service the MDF room, including wiring, thermostats, piping, insulation and all associated appurtenances.commercialHVAC / Mechanical· Thermo Tech Mechanical I$100KJan 9
- 78 Kingsland Avenue BrooklynPL & SP filed in conjunction with Alt 1 Job Number 322033615.commercialFire protection, Plumbing· Creative Plumbing In$145KJan 10
- 2940 Brighton 4 Street BrooklynPlumbing work in conjunction with NB#B00691706multifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· Mega PLBG Corp—Mar 4
- 167 13 Street BrooklynProposed sprinkler and plumbing in conjunction with B00661174-I1commercialHVAC / Mechanical, Plumbing· RRP Plumbing Corp$211KJan 15
- 432 Wyona Street BrooklynFoundation and Earthwork in conjunction to NB filing 321598954multifamilyBuilding· Technocraft Inc—Jan 9
- 679 Blake Avenue BrooklynReinforced concrete and steel structure for new buildingmultifamilyBuilding· Technocraft Inc—Jan 9
- 747 Bedford Avenue BrooklynFILING A MECHANICAL SYSTEM IN CONJUNCTION WITH NB # 321773602multifamilyHVAC / Mechanical· Blustone Contracting LLC—Jan 9
- 1031 Southern Boulevard BronxStorefront & Interior renovation of existing retail store as per plans. No change in use, occupancy or egress is involved under this application.multifamilyBuilding· Mani Development Inc$109KJan 8
- 2250 Aqueduct Avenue BronxAPPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.multifamily· MC Superstructure Inc—Jan 8
- 3636 Waldo Avenue BronxFISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSSEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Jan 8
- 1355 Clinton Avenue BronxSupport of Excavation in conjunction with NB application #X01112721-I1multifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· Wall To Wall Constructio—Oct 21
- 936 Southern Boulevard BronxTo file MS mechanical work in conjunction with DOB Now Build application job#X00934706. No change in use, egress or occupancy under this applicationcommercialHVAC / Mechanical· PLBG Mechanical And Pipin$135KJan 8
- 3556 Holland Avenue BronxNew Quality Housing Apartment BuildingmultifamilyBuilding, HVAC / Mechanical, Plumbing· KC Expediting Inc—Oct 27
- 581 Austin Place BronxINSTALLATION OF A SPRINKLER AND STANDPIPE SYSTEM IN CONJUNCTION WITH NB#210181300 AS PER THE PLANS FILED HEREWITH.commercialFire protection· Casino Plmbg & HTG Corp$500KJan 8
- 2400 Bronx Park East BronxPROVIDE NEW FIRE SPRINKLER SYSTEM THROUGH NEW FOUR (4) STORY BUILDING WITH CELLAR AND PENTHOUSE.multifamilyFire protection· XH&RC PLBG And HTG Inc$130KJan 8
- 2400 Bronx Park East BronxPLUMBING WORK FILED IN CONJUNCTION WITH ALT 1 APPLICATION #X00490244-I1 PROPOSED VERTICAL & HORIZONTAL ENLARGEMENT ON EXISTING 3-STORY 2 DWELLING UNITS TO 4-STORY 11 DWELLING…multifamilyPlumbing· XH&RC PLBG And HTG Inc$122KJan 8
- 209-27 Northern Boulevard QueensMINOR INTERIOR ALTERATION FOR EXISTING HAIR SALON# 103. WORK INCLUDES FLOOR REPAIR. NO CHANGE IN USE, OCCUPANCY AND STRUCTURE UNDER THIS APPLICATION.commercialBuilding· Youn Design Corp$45KJan 8
- 67-30 Dartmouth Street QueensSUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR REPAIR WORK AT 67-30 DARTMOUTH STREET, QUEENS, NY 11375.multifamilyBuilding· K.E.S. Construction Co In—Jan 8
- 53-25 96 Street QueensInterior renovation of 1st floor of exist. 2 story building. Demolition work and construction work as per plan. Replace partition, flooring, ceiling and painting throughout. No…multifamilyBuilding, Plumbing· Cube Builders Group NY$67KJan 15
- 133-24 Sanford Avenue QueensSUSPENDED SCAFFOLDS FOR FACADE RESTORATION MATERIAL HOISTING VIA OUTRIGGER BEAMSmultifamily· Safetech Enterprises Corp—Jan 8