New York City commercial construction projects
62,113 commercial and multifamily projects from New York City’s building permit records (11,164 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 7, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 1036 of 1243
- 717 Fifth Avenue ManhattanGeneral construction modifications taking place on the 14th floor as per drawings filed herewith. No change in use, egress or occupancy.commercialBuilding· L&K Partners, Inc$153KFeb 18
- 3799 Broadway ManhattanThe scope of work is to floor repair as per plans NO CHANGE TO USE,EGRESS OR OCCUPANCYcommercialBuilding· GFX Site Development Inc$30KFeb 18
- 920 5 Avenue ManhattanPLUMBING WORK AT APT 14A ON THE 14TH AND 15TH FLOORS AS PER PLANS FILED HEREWITHmultifamilyPlumbing· Accurate Mechanical Inc$86KFeb 18
- 115 West 18 Street ManhattanConvert 3rd floor from scool to lecture hall and banquet hall. Minor partition work. Obtain new CO.commercialBuilding· Kla Construction LLC$30KFeb 18
- 590 Madison Avenue ManhattanModifications to the existing sprinkler system on the 26th floor as per plans. No change to use, egress or occupancy.commercialFire protection· Standard Fire Protect LLC$44.4KFeb 18
- 245 East 93 Street ManhattanInterior finish upgrades of aprtment unit 23D ; removal of (1) powder room; enlargement of the main bathroom as shown on plans. No change to use, egress or occupancy.multifamilyBuilding· Cortlandt Contracting Cor$250KFeb 18
- 240 East 27 Street ManhattanGarage repairs as per plans; no change to use, occupancy, or egress. No change to number of parking spaces.multifamilyBuilding· Structural Preserv System$175KFeb 18
- 200 Central Park West ManhattanRe-roof slate and flat roofs. Remove and install new identical gutters with new drains. Remove mechanical equipment.commercialBuilding· Nicholson & Galloway, Inc$10MFeb 18
- 28 Liberty Street ManhattanTENANT FIT OUT TO EXISTING COMMERCIAL SPACE, WORK INCLUDE GENERAL CONSTUCTION, NO CHANGE TO USE EGRESS OR OCCUPANCY.commercialBuilding, HVAC / Mechanical, Plumbing· SCG America Const. Inc$132KApr 3
- 75 Varick Street ManhattanPLUMBING & SPRINKLER WORK (STAIR/ELEVATOR) as per planscommercialPlumbing· Reliable PLBG & HTG Corp$31KFeb 18
- 100 Prince Street ManhattanGeneral Construction and Mechanical work at cellar and 1st floor retail store indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application.multifamilyBuilding· Folor Inc$69KJun 24
- 19 Barrow Street ManhattanAPPLICATION FOR INTERIOR RENOVATION WORK ON THE 2C & 3B APARTMENTS AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.multifamilyBuilding, Plumbing· Innova Tiles LLC$137KFeb 27
- 1966 1 Avenue ManhattanMODIFICATION TO EXISTING FIRE SPRINKLER SYSTEM FOR THE RENOVATION OF AN EXISTING COMMUNITY FACILITY ON THE FIRST FLOOR.multifamilyFire protection· Go Pro Fire Protection C$56KFeb 18
- 718 Fifth Avenue ManhattanModifications to the existing plumbing system on the 3rd floor (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancycommercialPlumbing· Par Plumbing Co., Inc$87.5KFeb 18
- 18 East 50 Street ManhattanMechanical Modification to 5th Floor Commercial Space. No change to use, occupancy, or egress.commercialHVAC / Mechanical· Howard M.Haimes Inc$150KFeb 18
- 80 Pine Street ManhattanHVAC DUCTWORK UPDATES FOR FLOORS 8-15.multifamilyHVAC / Mechanical· Target Construction LLC$315KFeb 18
- 235 West 71 Street Manhattanfacade inspectionmultifamily· Jepol Construction Inc—Feb 18
- 85 East End Avenue ManhattanFacade repair including brick replacement, mortar repointing, lintel and sealant replacement as per plans filed herewith. No change to use, egress, or occupancy.multifamilyBuilding· Tower Services Inc$870KFeb 18
- 85 East End Avenue ManhattanInterior modifications including garage repairs, concrete patch, crack & injection grout repairs as per plans filed herewith. No change to use, egress, or occupancy.multifamilyBuilding· Tower Services Inc$50KFeb 18
- 163 Bleecker Street ManhattanInstallation of make-up air unit and a kitchen exhaust fan at the roof in conjunction with Alteration CO M08022861 and Alteration M00830231. There is no change in use or…commercialHVAC / Mechanical· Right Temp Mechanical Inc$87KFeb 18
- 280 Henry Street ManhattanFILING HEREWITH FOR GENERAL CONSTRUCTION. WORK TO INCLUDE INTERIOR RENOVATION OF AN EXISTING HEALTH CENTER AS SHOWN ON PLANS. THERE WILL BE NO CHANGE OF USE, OCCUPANCY OR EGRESS…commercialBuilding, HVAC / Mechanical, Plumbing· Ziba Construction Inc$243KApr 9
- 925 Park Avenue ManhattanRenovation of an existing duplex. No change to use, occupancy or egress.multifamilyBuilding· S. Donadic Inc$410KFeb 18
- 1251 6 Avenue ManhattanMinor interior demolition, including the removal of non-load bearing partitions, floor, and ceiling finishes as per plans filed herewith. No change to use, egress, bulk, or…commercialBuilding· Turner Construction Compa$825KFeb 18
- 55 East 9 Street ManhattanHEREBY FILING FOR INTERIOR RENOVATION AND COMBINATION OF TWO EXISTING APARTMENTS 12A & 12B AS PER TPPN 3/97 AS PER DRAWINGS SUBMITTED. THIS APP DO NOT REQUIRE A NEW OR AMENDED…multifamilyBuilding, Plumbing· Empire City Constr Co.,LL$138KFeb 27
- 20 East 69 Street ManhattanNew interior wall opening, staircase and framing to support stair components. Existing stair and dumbwaiter opening to be closed with new floor joists repair notched wood joists.…commercialBuilding· Urban Interior Group Inc$50KFeb 18
- 320 West 76 Street ManhattanINSTALLATION OF HYDRO KIT INDOOR UNITS, OUTDOOR CONDENSING UNIT, AND CONCRETE PAD FOR DOMESTIC HOT WATER HEATING SYSTEM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.multifamilyHVAC / Mechanical· Dual Fuel Company LLC$100KFeb 18
- 850 7 Avenue ManhattanHEREWITH IS THE FILING TO INSTALL NEW WET SPRINKLER HEADS AND MINOR PLUMBING WORK IN THE EXISTING RETAIL STORE ACCORDING TO THE PLANS PROVIDED. THERE ARE NO CHANGES IN USE,…commercialPlumbing· Zone Mechanical LLC$55KFeb 18
- 345 East 52 Street ManhattanApplication filed for facade repairs. Garage fireproofing repairs. No change to use, occupancy or egress..multifamilyBuilding· WKR Construction, Inc$390KFeb 18
- 22 Vanderbilt Avenue ManhattanREmove and Installation of HVAC units and associated ductwork as shown on the drawings filed herewith. No change to occupancy, use or egress.commercialHVAC / Mechanical, Plumbing· Sciame Construction LLC$160KFeb 27
- 165 East 56 Street ManhattanSTRUCTURAL WORK TO ACCOMMODATE CHILLER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialBuilding· MJV Mechanical LTD$100KFeb 18
- 99 Park Avenue ManhattanAT 6TH Floor Entire Tenant Space and Bathrooms, Remove and Replace Plumbing Lines and fixtures as per plans filed herewith. No change to use, occupancy, or egress.commercialPlumbing· Sean Coakley P & H Inc$55KFeb 18
- 45 East 80 Street ManhattanREMOVE, REPLACE ,RELOCATE AND INSTALL NEW PLUMBING FIXTURES IN CONJUNCTION WITH THE RENOVATION TO APARTMENT 12A ON THE 12TH FLOOR. GENERAL CONSTRUCTION FILED UNDER ALTERATION NO…multifamilyPlumbing· Golds Plumbing Corp$46KFeb 18
- 251 West 92 Street ManhattanInstallation, relocation, replacement and removal of plumbing fixtures as shown on plans filed herewith.multifamilyPlumbing· Creative Plumbing In$61.5KFeb 18
- 132 West 14 Street ManhattanINSTALLATION OF NEW PACKAGED ROOFTOP EMERGENCY GENERATOR W/ INTEGRAL FUEL STORAGE TANK IN THIS PRE-1968 EXISTING BUILDING. NO CHANGE IN USE OR EGRESS.commercialHVAC / Mechanical· Wasoff PLBG. & Utl.Co Inc$25KFeb 18
- 125 West 144 Street ManhattanINTERIOR RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: REPLACEMENT OF EXISTING KITCHEN AND BATHROOM FXITURES ON EXISTING ROUGH-IN. NO CHANGE…multifamilyBuilding, HVAC / Mechanical, Plumbing· Cegf & G Plumbing Corp$2.2MMay 12
- 25 West 35 Street ManhattanHEREBY FILING FOR INTERIOR DEMO OF NONE BEARING PARTITIONS, CEILING, FLOORS, BATHROOMS, DIGGING OF BASEMENT LEVEL TO INSTALL NEW SLAB ON GRADE. ALL STRUCTURAL WORK TO BE FILED…commercialBuilding· Trend 21 Management Inc$50KFeb 18
- 163 Bleecker Street ManhattanINSTALL 11.5 TON ROOFTOP PACKAGED HVAC UNIT ON ROOF TO SERVES 1ST FL. INSTALL 16 AND 6 TONS VRF WITH FAN COIL UNITS AND DISTRIBUTION FOR CELLAR, MEZZ AND 2ND FL. INSTALL AIR…commercialHVAC / Mechanical· Right Temp Mechanical Inc$135KFeb 18
- 1115 5 Avenue ManhattanInstallation of plumbing fixtures and associated piping in conjunction with general construction as per plans filed herewith. No change to use, egress or occpancymultifamilyPlumbing· Master 2 PLBG & HTG Inc$54KFeb 18
- 35 West 125 Street ManhattanPROPOSED 21-STORY MIXED-USE BUILDING W/ 180 D.U. & COMMERCIAL STORE AT GROUND FLOOR LEVELmultifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· Target Construction LLC$50MNov 12
- 119 East 27 Street ManhattanINSTALLATION OF MECHANICAL VENTILLATION SYSTEM FOR KITCHEN AND DUNNAGE FOR MECHANICAL UNIT.commercialBuilding· Mega Mechanical Inc$25.5KFeb 18
- 201 Park Avenue South ManhattanStructural modifications as per plans filed herewith. No change to use, egress, or occupancy.commercialBuilding· Capital Builders Group In$495KFeb 18
- 132 Broadway BrooklynFILING PLUMBING WORK AS PER PLANS FILED.commercialPlumbing· V's Prime Mechanical, LLC$82KFeb 18
- 132 Broadway BrooklynFILING SPRINKLER WORK TO INSTALL NEW HEADS AS PER PLANS FILED.commercialFire protection· V's Prime Mechanical, LLC$34KFeb 18
- 272 Division Avenue BrooklynModification to existing VERIZON site. Remove 1 cabinet, replace 4 antennas & 6 RRHs, relocate 2 GPS units, install 2 antennas and a new platform with equipment cabinets on the…multifamilyRoofing· Vertical Solutions Inc$68.3KFeb 18
- 19 Saint Francis Place BrooklynINSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.multifamilySolar· Brooklyn Solarworks LLC$58.3KFeb 18
- 6202 18 Avenue BrooklynGENERAL RENOVATION OF A COMMERCIAL BUILDING WITH REPAIRING PARTITION, REPAIRING EXISTING FLOOR, CEILING, NEW PARTITION AND PAINTING & MECHANICAL WORK ON CELLAR &1ST FL. NO CHANGE…commercialBuilding, HVAC / Mechanical, Plumbing· Emprise Construction Inc$129KAug 1
- 501 Hicks Street BrooklynINSTALLATION OF THE SUSPENDED SCAFFOLDING INSTALLED IN ORDER TO PERFORM EXTERIOR REPAIRS. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION. NO CHANGE IN USE OCCUPANCY OR EGRESS…multifamilyBuilding· C&C Daley's Const.Corp—Feb 18
- 1766 61 Street BrooklynINTERIOR RENOVATION 2 FAMILY PARTITIONS AS PER PLAN NO CHANGE TO OCCUPANCY USE OR EGRESSmultifamilyBuilding· Lowvolt Tech Enterprises$59KFeb 18
- 1224 Fulton Street BrooklynT-Mobile - Mechanical modification for retail renovation.commercialHVAC / Mechanical· MDS Builders Inc$45KFeb 18
- 1224 Fulton Street BrooklynT-Mobile: Structural for ceiling-suspended display elements at 1st floor as per plans filed.commercialBuilding· MDS Builders Inc$35KFeb 18