New York City commercial construction projects
62,113 commercial and multifamily projects from New York City’s building permit records (11,164 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 7, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 1023 of 1243
- 49-20 Van Dam Street QueensINSTALLATION OF SOLAR PV SYSTEM ON EXISTING ROOFTOP. NO CHANGES TO EGRESS, USE OR OCCUPANCY.commercialSolar· 1st Light Energy Inc$33.7KFeb 25
- 593 Fairview Avenue QueensREPAIR OF EXISTING MASONRY WALLS AND PARAPETS AS PER PLANS, NO CHANGE IN USE OCCUPANCY OR EGRESScommercialBuilding· Royal K Construction Corp$40KFeb 25
- 137-34 Northern Boulevard QueensINTERIOR RENOVATION WORK RELATED TO THE CONSTRUCTION OF ATS (AUTOMATIC TRANSFER SWITCH) CLOSET AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS…commercialBuilding· Tishman Interiors Corp$25KFeb 25
- 110-45 71 Road QueensMINOR INTERIOR RENOVATION OF THE APT 4H - 4TH FLOOR - CLOSE BOTH EXISTING KITCHEN ENTRY POINTS. CREATE NEW 3'-2 X 6'-8 OPENING TO CONNECT THE KITCHEN WITH THE LIVING ROOM.…multifamilyBuilding, Plumbing· Oliwa Construction Inc$35KMar 4
- 98-81 Queens Boulevard QueensModification to existing HVAC system as per plans filed herewith. (98-89 Queens Blvd, tenant build out) no change in use, egress or occupancy under this application.multifamilyHVAC / Mechanical· JKT Construction Inc$50KFeb 25
- 48-15 43 Avenue QueensRENOVATE UNIT 1, COMMON LOBBY AND CELLAR STORAGE AREA, INCLUDE REMOVING AND INSTALLING NEW INTERIOR NON-LOAD BEARING PARTITIONS, LIGHTING AND FINISH WORK. NO CHANGE TO USE,…multifamilyBuilding, HVAC / Mechanical, Plumbing· Ebl Contracting Corp$146KAug 25
- 86-10 151 Avenue QueensEMERGENCY INSTALLATION OF TEMP SHORING & TEMP PRTN AT FLS CEL-6, TEMP ROOF ENCLOSURE, & REMOVAL OF WTR DAMG'D FINSHES DUE TO FIRE. IMMED WORK IS REQ'D FOR BLDG STABILIZATION,…multifamilyBuilding· Franchise Interior Develo$230KFeb 25
- 91-30 Van Wyck Expressway QueensINSTALL EXTERIOR NON-ILLUMINATED WALL SIGN (AHF)commercialSigns· Active Signs Inc—Feb 25
- 64-45 188 Street QueensMODIFICATION OF THE EXISTING SPRINKLER SYSTEM. ADDITION OF THE SPRINKLER HEADS.multifamilyFire protection· Firequest Corp$32KFeb 25
- 2514 Newtown Avenue QueensHORIZONTAL EXTENSION OF EXISTING TWO-FAMILY TO CONVERT INTO FOUR FAMILY HOUSE.multifamilyBuilding, HVAC / Mechanical, Plumbing· Upstrate Inc$330KAug 31
- 43-15 46 Street QueensRoofing membrane replacementmultifamilyBuilding· Safe Way Construction Cor$452KFeb 25
- 47-01 Queens Boulevard QueensRENOVATE EXISTING OFFICE SPACES BY COMBING SUITES 203,204,205 & 206 WITH MINOR DEMOLITION & INSTALLATION OF NON-BEARRING PARTITIONS, INSTALL NEW FLOORING, CARPENTRY DOORS AND…commercialBuilding· A & R Ultimate Magmt LLC$161KFeb 25
- 47-01 Queens Boulevard QueensRENOVATE SUITE 301 & 303 AT THIRD FLOOR WITH THE REMOVAL AND ERECTION OF NON-BEARING PARTITIONS AND NEW DROP CEILING AT THE COUNTER WITHIN THE WAITING AREA AS PER PLANS FILED. NO…commercialBuilding, Plumbing· A & R Ultimate Magmt LLC$85KFeb 28
- 87-40 109 Street QueensModification of an existing Verizon site on the roof. Replace (6) RRHs, (3) antennas, and (1) cabinet. Install (6) antennas. Relocate (1) GPS unit. Install new platform with…commercialRoofing· North Jersey Atms LLC$69.2KFeb 25
- 147-11 71 Avenue QueensApplication is filed to resolve violation 39095328L by installing a drywell following the concrete pavement in the rear yard.multifamilyPlumbing· All Pro PLBG & HTG Inc$25KFeb 25
- 29-24 40 Avenue QueensMechanical work as per plans filed herewith. Additional mechanical equipment COCs shown under subsequent filings.multifamilyFire protection, HVAC / Mechanical, Plumbing· Lic 40th Enterprise LLC—May 12
- 2 East 55 Street ManhattanTEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor:Jesus Decolacommercial· Structual Presv System—Feb 25
- 15 East 16 Street ManhattanInstallation of suspended scaffold for facade work or inspection.multifamily· Preserv Building Restorat—Feb 25
- 301 Cathedral Parkway ManhattanInterior renovation of existing commercial store as per plan submitted herewith. No change in use, egress, or occupancy under this applicationmultifamilyBuilding, Plumbing· King Kong G/C Inc$108KMar 7
- 360 West 22 Street ManhattanFILING APPLICATION FOR CHILLER REPLACEMENT. NO CHANGE, IN USE, EGRESS, OR OCCUPANCY.multifamilyHVAC / Mechanical· Crystal Comfort Inc$750KFeb 25
- 810 Seventh Avenue ManhattanMinor demolition with installation of new partitions, doors, ceilings and finishes on the 17th floor (Suite 1700) as per plans. No change to use, egress or occupancy.commercialBuilding· Synergy Construction Inc$210KFeb 25
- 210 East 86 Street ManhattanFiling for the removal and installation of plumbing fixtures and piping related to this office renovation.commercialPlumbing· Bedrock PLBG. & HTG., Inc$145KFeb 25
- 520 8 Avenue ManhattanPropose to perform structural work. No change to use, egress or occupancy.commercialBuilding· Midtown Interior Resource$198KFeb 25
- 620 Avenue Of The Americas ManhattanMechanical modifications to take place on the first floor as per plans filed herewith. No change in use, egress, or occupancy.commercialHVAC / Mechanical· RXR Construction Serv LLC$100KFeb 25
- 150 Riverside Drive ManhattanREPLACEMENT OF TWO DUAL FUEL BURNERS . BURNERS WERE INSTALLED AS AN EMERGENCY INSTALLATION UNDER M01170396-I1-LA .commercialHVAC / Mechanical· Environmental Pro Mech$346KFeb 25
- 435 West 31 Street ManhattanGeneral construction as shown on plansmultifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· Steadfast Development And$1.1MMar 25
- 66 Hudson Boulevard Manhattanhereby filing to construct interior partitions, ceilings and doors for office fit out as shown on plans filed herewith. NO change to use, occupancy or egress.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· CM Plumbing Inc$285KFeb 25
- 432 Park Avenue South ManhattanGeneral construction modifications to the 10th floor as per plans filed herewith. No change in use egress or occupancy.commercialBuilding, HVAC / Mechanical, Plumbing· Arista Electric Corp$675KMar 5
- 125 Park Avenue ManhattanModifications to the existing HVAC system on the 18th and 19th floors (TD Securities- Marketing Floors 19 & 20) as per plans. No change to use, egress or occupancy.commercialHVAC / Mechanical· JT Magen & Company Inc$249KFeb 25
- 100 5 Avenue ManhattanMODIFICATIONS TO PLUMBING AND SPRINKLER SYSTEMS IN 9TH FLOOR COMMERCIAL SPACE. NO CHANGE TO USE, OCCUPANCY OR EGRESScommercialBuilding, HVAC / Mechanical, Plumbing· Briggs Services LLC$95KMar 5
- 653 10 Avenue ManhattanINSTALLATION OF TEMPORARY SUSPENDED SCAFFOLDS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS…multifamilyBuilding· Doria, Inc—Feb 25
- 50 West 67 Street ManhattanInterior Renovation of Apartment 4B including partitions, electrical and plumbing work as per plans. No change of use or occupancy.multifamilyBuilding, Plumbing· LRL Construction Inc$145KApr 24
- 1227 Madison Avenue ManhattanREMOVE 10,000 GALLON ABOVEGROUND TANK.multifamilyHVAC / Mechanical· C C Controlled Combustion$50KFeb 25
- 655 Madison Avenue ManhattanDemolition of rooftop mechanical units and support dunnage including water tank. Excludes elevators and elevator bulkheads (elevators shall be maintained during this phase)commercialBuilding· Breeze National Inc$25KFeb 25
- 171 West 81 Street ManhattanINTERIOR RENOVATION OF APARTMENT 1W. PARTITION CHANGES TONON-LOAD-BEARING WALLS AS PER PLANS. NO CHANGE IN USE,OCCUPANCY OR EGRESS.multifamilyBuilding, Plumbing· Next Generation Restorati$63.1KFeb 26
- 612 West 144 Street ManhattanINTERIOR RENOVATION OF APT B8. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding, Plumbing· Yafe Meod Corp$81KMar 20
- 250 Hudson Street ManhattanCONSTRUTION OF INTERIOR NON LOAD BEARING PARTITIONS WITH NEW FINISHES AS PER PLANS.commercialBuilding· Eclipse Development Inc$48KFeb 25
- 1501 Broadway ManhattanPropose installation of new plumbing fixtures and sprinkler heads with associated sprinkler branch piping. No change to use, egress or occupancy.commercialFire protection· DV Plumbing Inc$50KJun 3
- 1501 Broadway ManhattanPropose to file for interior renovations. No change to use, egress or occupancy.commercialBuilding· Rinnovo Construction, LLC$625KFeb 25
- 410 10 Avenue ManhattanErect non illuminated non advertyising D/F sign on wall. No change of use, egress or occupancycommercialSigns· Tee Bee Sign Inst Corp—Feb 25
- 27 East 23 Street ManhattanERECT A NON-ILLUMINATED BUSINESS ACCESSORY FACE REPLACEMENT ON EXISTING CABINET. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialSigns· Going Sign & Svcng Co,Inc—Feb 25
- 280 Park Avenue ManhattanHerewith filing interior renovations to office space as outlined in plans submitted. No change in use, egress or occupancy is proposed under this application.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Structure Tone, LLC$21.8MMay 28
- 450 Lexington Avenue ManhattanStructural work as per plans. No change in use, egress or occupancy.commercialBuilding· JT Magen & Company Inc$416KFeb 25
- 450 Lexington Avenue ManhattanModify mechanical ductwork and related piping. No change in use, egress or occupancy.commercialHVAC / Mechanical· JT Magen & Company Inc$4.7MFeb 25
- 450 Lexington Avenue ManhattanDemolition and installation of non-bearing interior partitions, doors and finishes related to tenant fit out. No change in use, egress or occupancy.commercialBuilding· JT Magen & Company Inc$25.6MFeb 25
- 30 East 60 Street ManhattanRENOVATION OF EXISTING OFFICE SPACE 1902 & 1903. INSTALL PLUMING FIXTURES. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.commercialPlumbing· Joe Parziale Plumbing Co$45KFeb 25
- 273 Bleeker Street ManhattanMechanical modifications as per plans filed herewith. No change to use, egress or occupancy.commercialHVAC / Mechanical· JRM Construction MGMT LLC$50.5KFeb 25
- 1100 6 Avenue ManhattanGeneral Construction filed here with, no change to egress, use or occupancy.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Reidy Contracting Group$6MApr 3
- 250 West 57 Street ManhattanGeneral construction modifications taking place on the 25th floor as per plans filed herewith. No change in use, egress or occupancycommercialBuilding· J. Phelan Construction Co$86KFeb 25
- 55 East 124 Street ManhattanGeneral Construction as shown on plans filed herewith. No change in use, egress or occupancy.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Daa Construction Group$2.5MApr 1