New York City commercial construction projects
62,113 commercial and multifamily projects from New York City’s building permit records (11,363 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 8, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 1003 of 1243
- 258 West 97 Street ManhattanInstallation of suspended scaffold for facade work or inspection.commercial· Penta Restoration, Corp—Mar 7
- 25 West 36 Street ManhattanINSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENTcommercial· Osmani NYC Inc—Mar 7
- 218 West 40 Street Manhattaninstallation of AC units, exhaust fans, ducts, piping, dampers & air outlets as indicated on planscommercialHVAC / Mechanical· Interior Building Service$210KMar 7
- 40 East End Avenue ManhattanTHE PROJECT INCL. INTERIOR RENO. TO APT PH 15 WITHIN THE EXISTING BLDG. THE SCOPE OF WORK CONSISTS OF THE PARTIAL INTERIOR & ERECTION OF NON-LOAD BEARING PART.. ITEMS TO BE…multifamilyBuilding, Plumbing· Antis Maintenance Corp$50KMar 11
- 452 Fifth Avenue ManhattanInterior partition removal and finishes of floors 3-11, as well as the removal of the existing connecting stair from floors 9-10 as per plans filed herewith. No change in use,…commercialBuilding· L&K Partners, Inc$1.8MMar 7
- 570 Washington Street ManhattanTEMPORARY SUSPENDED SCAFFOLD AS PER DRAWINGS DURING NB CONST, FILED SEP. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER…multifamily· JMD Contracting Of NY Inc—Mar 7
- 170 East 80 Street ManhattanEXTERIOR RENOVATION OF EXISTING ROOF TOP, FOURTH AND THIRD FLOOR TERRACES. THE SCOPE FURTHER INCLUDES REPLACEMENT OF EXISTING ROOFING, LEAK REPAIRS, NEW PAVING AND…commercialBuilding· L & Z Restoration Corp$450KMar 7
- 10 East 53 Street ManhattanMinor demolition with installation of new partitions, doors, ceilings and finishes on the 28th floor (Portage) as per plans. No change to use, egress or occupancy.commercialBuilding· Synergy Construction Inc$369KMar 7
- 1166 Avenue Of The Americas ManhattanModification to the existing plumbing system on the 23rd floor (NERA-Buildout) as per plans. No change to use, egress or occupancycommercialPlumbing· Lab PLBG & HTG Co Inc$338KMar 7
- 480 Second Avenue ManhattanRemoval of existing ductwork and installation of mechanical equipment and ductwork as shown on drawings filed herewith. Alt-CO filed under M01185872. OT, SP and PL work filed…multifamilyHVAC / Mechanical· Super G Construction Corp$106KMar 7
- 41 Madison Avenue ManhattanFILING FOR INTERIOR DEMO OF 3RD & 18TH FLOORS AS PER PLANS SUBMITTED HEREWITH.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Theodore Williams Constr$185KMar 14
- 1245 Broadway ManhattanInterior Renovation of 5th floor, as per drawings filed herewith. No change in Use, Egress, or OccupancycommercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Triton Construction Co.,$1.4MMar 24
- 320 Park Avenue ManhattanSprinkler modifications taking place on the 16th fl Con/17th fl marketing fl as per plans filed herewith. No change in use, egress or occupancycommercialFire protection· Par Fire Protection LLC$141KMar 7
- 320 Park Avenue ManhattanPlumbing modifications taking place on the 16th fl Con/17th fl marketing floor as per plans filed herewith. No change in use, egress or occupancycommercialPlumbing· Preferred Mechanical Inc$111KMar 7
- 120 East 87 Street ManhattanMINOR RENOVATION OF EXISTING APT. PPH1B ON THE 17TH FLOOR. DEMOLISH AND CONSTRUCT NON-LOAD BEARING PARTITIONS, MILLWORK AND FINISHES. NO CHANGE TO USE EGRESS OR OCCUPANCY.multifamilyBuilding, Plumbing· Murray Craft Buld Corp$154KMar 10
- 520 Madison Avenue ManhattanINSTALLATION OF INTERIOR NON-LOAD BEARING PARTITIONS, DOORS, FRAMES, CEILINGS, MILLWORK, LIGHTING , FLOORING, AND RELATED FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER…commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Build NYC Group Corp$2.2MMar 14
- 173 Perry Street ManhattanInterior renovation work as per plan. There is no change in USE, MEANS of EGRESS, or OCCUPANCY under this application.multifamilyBuilding, Plumbing· NY Signature Builders LLC$199KMar 10
- 408 Grand Street ManhattanErect non illuminated non advertising D/F projecting sign on wall. No change of use, egress or occupancymultifamilySigns· N.Y. Sign Art Inc—Mar 7
- 408 Grand Street ManhattanErect non illuminated non advertising D/F projecting sign on wall. No change of use, egress or occupancymultifamilySigns· N.Y. Sign Art Inc—Mar 7
- 420 West 49 Street ManhattanINTERIOR RENOVATION TO REPLACE EX. CEILING & FLOORING, REPLACE PARTITION WALL & DOOR FOR EX. BATHROOM, INSTALL NEW SMOKE/CARBON MONOXIDE DETECTORS & REPLACE GYPSUM BOARD…multifamilyBuilding, Plumbing· Avolon.Construction Corp$46KMay 1
- 150 West 30 Street ManhattanAPPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 9TH FLOOR (SUITE 904) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,…commercialBuilding· Brace Construction LLC$86.6KMar 7
- 99 Hudson Street ManhattanGENERAL CONSTRUCTION WORK TO INCLUDE INTERIOR NON-STRUCTURAL DEMOLITION ON THE 8TH FLOOR AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Rinnovo Construction, LLC$67KMar 10
- 420 Lexington Avenue ManhattanInterior reno & demo of non-load bearing partitions, walls. ceiling & finishes as indicated on plans.commercialBuilding· Wesbuilt Construction Man$980KMar 7
- 10 Park Avenue ManhattanINTERIOR RENOVATION TO EXISTING KITCHEN AND BATH WITHIN UNIT #22D. NO CHANGE OF BULK, USE, OCCUPANCY OR EGRESS. PLUMBING FILED SUBSEQUENTLY.multifamilyBuilding, Plumbing· P.S.I. Mechanical$58KMar 20
- 3959 Broadway ManhattanCHNY Bed Tower LABOR AND DELIVERY: HVAC modifications to accommodate the labor and delivery sterile supply refurbishment at the existing hospital building. No change to zoning,…commercialFire protection, HVAC / Mechanical· Hellman Construction Co$150KMay 16
- 3959 Broadway ManhattanCHNY Bed Tower LABOR AND DELIVERY:. Interior modifications to partitions and finishes to accommodate the labor and delivery sterile supply refurbishment at the existing hospital…commercialBuilding· Hellman Construction Co$260KMar 7
- 1148 5 Avenue ManhattanRENOVATION OF EXISTING APARTMENT 10B ON THE 10TH FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.multifamilyBuilding, HVAC / Mechanical· Hamilton Air Company, Inc$331KMay 20
- 255 East 49 Street ManhattanREPLACEMENT OF PACKAGED HEAT PUMP ROOFTOP UNIT. ALL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.multifamilyBuilding, HVAC / Mechanical· Crystal Comfort Inc$444KJun 24
- 480 Park Avenue Manhattanrenovate apartment 8G, partition, plumbing, electrical work, partial window replacement, no change to use, exits or occupancymultifamilyBuilding, Plumbing· Main Street Properties US$308KApr 10
- 941 Park Avenue ManhattanInterior renovation to apartment powder room, bathroom and foyer. No change to use, occupancy, or egress.multifamilyBuilding, Plumbing· Dino Koljenovic BDC Corp$81KMar 21
- 10 Vanderbilt Avenue ManhattanMechanical demolition and renovations / modifications to existing ductwork as per plans filed herewith. No change to use, egress, or occupancy.commercialHVAC / Mechanical· Structure Tone, LLC$157KMar 7
- 2563 Broadway ManhattanMINOR RENOVATION TO AN EXISTING RESTAURANT SPACE AND THE MODIFICATION OF THE MECHANICAL VENTILATION FOR THE PROPOSED PIZZA OVEN. NO CHANGE IN USE, EGRESS OR OCCUPANCYmultifamilyBuilding, HVAC / Mechanical· Global Luxury Srvcs Inc$70KMar 7
- 810 Seventh Avenue ManhattanModifications to the existing HVAC system on the 37th and 38th floors (Mirae) as per plans. No change to use, egress or occupancy.commercialHVAC / Mechanical· Nucor Construction Corp$135KMar 7
- 60 East 96 Street ManhattanINTERIOR RENOVATION TO APT. 5B ON THE FIFTH FLOOR. WORK TO INCLUDE GENERAL CONSTRUCTION AS PER PLANS. PL & MS WORK FILED AS SUBSEQUENT FILINGS. NO CHANGE IN USE, EGRESS, OR…multifamilyBuilding, Plumbing· Artur Kalaj$295KMar 10
- 120 Mercer Street ManhattanPROVIDE NON-BEARING PARTITIONS AND FINISHES FOR RETAIL STORE ON PART FIRST AND CELLAR FLOORS AS PER PLANS FILED. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.commercialBuilding, Fire protection, Plumbing· Moma Construction Group$961KApr 24
- 75 Varick Street ManhattanINTERIOR TENANT IMPROVEMENTS, NEW ACCESSORY STAIRS AND NEW TENANT ELEVATOR AS PER PLANS.commercialBuilding, HVAC / Mechanical, Plumbing· Eclipse Development Inc$1.5MMar 24
- 838 5 Avenue ManhattanPLUMBING WORK AT 7TH FLOOR AT PER PLANS FILED HEREWITHmultifamilyPlumbing· Magic Mechanical Inc$79KMar 7
- 120 East 23 Street ManhattanGeneral construction work to include exterior renovation of 1st floor storefront, to include new double doors, glazing, and louvers. Door sizes to be maintained for egress.commercialBuilding· L&K Partners, Inc$65KMar 7
- 641 Sixth Avenue ManhattanConstruct interior partitions, ceilings and doorscommercialBuilding, HVAC / Mechanical, Plumbing· JRM Construction MGMT LLC$2.4MMay 1
- 312 11 Avenue ManhattanPLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATIONS IN 1ST FL COMMERCIAL SPACE FILED UNDER M01141123-I1. NEW PLUMBING FIXTURES & GAS COMMERCIAL COOKING EQUIPMENT.multifamilyPlumbing· Katan P & H Inc$60KMar 7
- 1009 Fifth Avenue ManhattanFiling for Structural work for selective removal of concrete slab on grade in the cellar utilizing hand tools. Selective removal of concrete slab from 1st floor to 7th floor…multifamilyBuilding· Cow Bay Sprinkler Corp$255KMar 20
- 463 Broome Street ManhattanTHE PROPOSED WORK IS TO INCLUDE CONSTRUCTION OF NEW PARTITIONS WITH NEW FIXTURES AT EXISTING AND NEW LOCATIONS AND NEW FINISHES AS PER PLANS. INSTALLATION OF NEW LIGHT FIXTURES…multifamilyBuilding· Ejp Contracting Corp$200KMar 7
- 32 West 120 Street ManhattanFILLING FOR PLUMBING WORK TYPE IN CONJUNCTION WITH ALT-1 JOB# M08034658-I1.multifamilyPlumbing· M & M Piping And Heating$60KMar 7
- 314 West 95 Street ManhattanProposed filing for Boiler Replacement.commercialHVAC / Mechanical· Village P & H NY Inc$75KMar 7
- 66 Crosby Street ManhattanExterior Facade & Roof repairs as per the plans filed including: Removal, Repair and Replacement of existing roof membrane, flashings, etc., roof drains, cornice, sealant joint,…multifamilyBuilding· Tribute Restoration Inc$893KMar 7
- 195 Hudson Street ManhattanReplacement of 1 existing A/C package unit with 3 new. Two A/C package units existing to remain. Relocate 1 existing A/C package unit. No change in use, egress, or occupancy.multifamilyHVAC / Mechanical· Godfrey's Refrigeration$150KMar 7
- 5 East 17 Street ManhattanMasonry facade repairs, as per plans filed herewith. No change in use, egress, or occupancy.multifamilyBuilding· Jerrick Associates Inc$88.1KMar 7
- 330 West End Avenue ManhattanExterior restoration to include localized roof replacement, masonry restoration, lintel replacement and parapet rebuilding as per plans filed herewith. No change to use, egress…multifamilyBuilding· M&A Projects Restoration$261KMar 7
- 695 Park Avenue ManhattanHUNTER COLLEGE NORTH BUILDING. RENOVATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCYcommercialBuilding· Infinity Contracting Serv$11.1MMar 7
- 695 Park Avenue ManhattanDEMOLITION AND INSTALLATION OF DUCTWORK, PIPING, AIR HANDLING UNITS, FAN COIL UNITS, FANS.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Infinity Contracting Serv$17.6MApr 3