Issued Feb 26 · 2 permits
$7.6M
SPR 2019 CBRC: REPLACEMENT OF EXISTING DOMESTIC WATER RISERS PER PLANS. REPLACEMENT ONLY. (OCCUPANCY R-2 (143 RESIDENTIAL UNITS AND 2 RETAIL UNITS, TYPE IIB CONSTRUCTION). WORK…
Get ProEvery project in every city · from $79/mo
Get ProMonthly permit report
By declared value.
Issued Feb 26 · 2 permits
$7.6M
SPR 2019 CBRC: REPLACEMENT OF EXISTING DOMESTIC WATER RISERS PER PLANS. REPLACEMENT ONLY. (OCCUPANCY R-2 (143 RESIDENTIAL UNITS AND 2 RETAIL UNITS, TYPE IIB CONSTRUCTION). WORK…
Issued Feb 11
$5.1M
DDS 2019 CBC: NEW CONSTRUCTION OF A PROPOSED 3-STORY MULTI-FAMILY RESIDENTIAL BUILDING WITH 12 DWELLING UNITS. OCCUPANCY R-2; CONSTRUCTION TYPE III-B. CONSULTANT REVIEWER: V3…
Source: building permit records from official city open-data portals, checked daily. Data through . How we count
Issued Feb 19
$4.8M
SPR 2019 CBRC INTERIOR AND EXTERIOR ALTERATION OF BASEMENT AND FIRST FLOOR WITHIN EXISTING SINGLE-STORY BUILDING, PLUS MULTIPLE BUILDING ADDITIONS AND NEW TRASH ENCLOSURE, FOR A…
Issued Feb 21
$3M
SELF-CERT 2019 CBRC: ALTERATION TO EXISTING BUILDING. THE WORK CONSISTS OF REROOFING WITH A FLUID-APPLIED ROOFING SYSTEM OVER HEAVILY PATCHED AND REPAIRED SECTIONS OF THE ROOFS.…
Issued Feb 10 · 2 permits
$1.7M
SPR 2019 CBRC. INSTALLATION OF A 1,031.32 KWDC SOLAR ROOFTOP SYSTEM ON A ONE STORY BUILDING AS PER PLANS. OCCUPANCY GROUP F-1. TYPE II-B CONSTRUCTION.
Issued Feb 25 · 3 permits
$1.7M
INTERIOR ALTERATION OF EXISTING COMMERCIAL SPACE TO AN AMBULATORY SURGERY CENTER, ADDITION OF NEW DIESEL GENERATOR ON CONCRETE PAD AND NEW 6'0" HIGH LOCED CHAIN LINK FENCE WITH…
Issued Feb 21 · 3 permits
$1.2M
SPR 2019 CBRC: DEMOLITION AND REBUILD OF OFFICE SPACE WITH NEW RESTROOMS AND WORK AREA IN EXISTING SINGLE STORY S-1 WAREHOUSE WITH ACCESSORY OFFICE OCCUPANCY BUILDING. INCLUDES…
Issued Feb 26
$950K
CHICAGO PUBLIC SCHOOLS INTERIOR RENOVATIONS INCLUDING FOUR (4) PRE-K CLASSROOMS AND TOILET ROOMS.
Issued Feb 4
$625K
REPAIR OR IN-KIND REPLACEMENT OF 66 PLUMBING FIXTURES AS DESCRIBED IN PERMIT APPLICATION. INCLUDES REPAIR OR REPLACMENT OF PLUMBING PIPING. INCLUDES REPAIR OR REPLACEMENT OF…
Issued Feb 3
$602K
RENOVATION OF 1ST FLOOR GIRLS, BOYS, AND ALL-GENDER TOILET ROOMS. THE WORK ALSO INVOLVES MEP UPGRADES RELATED TO THE RENOVATIONS.
Other months: September 2026 · August 2026 · July 2026 · June 2026 · May 2026 · April 2026