Issued Dec 11
$20M
Change of occupancy from Offices to Multi-family Dwelling for 110 units; ground floor Store occupancy to remain. Renovation of 11-story office condominium from an office use to…
Get ProEvery project in every city · from $79/mo
Get ProMonthly permit report
By declared value.
Issued Dec 11
$20M
Change of occupancy from Offices to Multi-family Dwelling for 110 units; ground floor Store occupancy to remain. Renovation of 11-story office condominium from an office use to…
Issued Dec 29 · 5 permits
$11.8M
Fit out of the 30th floor for a single tenant, scope includes minor demo, mechanical, electrical, plumbing and fire protection upgrades and architectural finishes.
Source: building permit records from official city open-data portals, checked daily. Data through . How we count
Issued Dec 5
$5.5M
AT RISK FOUNDATION for ERT1462975 new Twenty-two (22) unit mixed use residential building with 1-Retail space at lower level. with 8 parking spaces.;Demolition of existing…
Issued Dec 12
$4.5M
Consolidate 4 existing parcels into 1 single Lot. Existing parcel IDs = 0800823000, 0800824000, 0800825000, 0800826000. This is a companion case to ALT1703424.
Issued Dec 8 · 3 permits
$3.5M
Change occupancy from "retail" to "professional office". Construct tenant fit-out.\*Existing 2 Retail, Bank, Restaurant, Gym, Beauty Salon, Dental Office, Offices…
Issued Dec 1 · 12 permits
$2.2M
Interior alteration to existing tenant suite located on 19th floor of office building.
Issued Dec 1
$1.6M
City of Boston Animal Shelter renovation property @26 Mahler Rd. Roslindale, Ma
Issued Dec 9
$1.2M
Renovation to the 3rd floor of 30 Federal St, including MEP, Sprinkler, FA and finishes and adding a small conference room.*Application assigned to FD on 10/29/25**LEGAL USE AND…
Issued Dec 12 · 3 permits
$1.1M
Installation of interior finishes (flooring, tile, trim and paint) Installation of kitchen cabinetry and appliances in existing location. Installation of (2) bathroom finishes in…
Issued Dec 9
$236K
Removal of existing carpet in Basement, 1st floor, and 2nd floor, and installation of new, same model carpet to include tile work within the back hallway on the 1st floor.
Other months: September 2026 · August 2026 · July 2026 · June 2026 · May 2026 · April 2026